Methods Process Analyst: Level Ii
CurrentCommunicate, review, analyze and maintain cost and schedule performance baselines to actual performance throughout the life cycle of a preflight & delivery airplane while quantifying/reporting financial cost and schedule trends/risks to senior management.Develop, implement, and maintain data collection and filtering tools made with Teradata and Access databases that pull relevant data from Boeing productions systems (OWI, CDW) into an organized and optimized format resulting in more… Show more Communicate, review, analyze and maintain cost and schedule performance baselines to actual performance throughout the life cycle of a preflight & delivery airplane while quantifying/reporting financial cost and schedule trends/risks to senior management.Develop, implement, and maintain data collection and filtering tools made with Teradata and Access databases that pull relevant data from Boeing productions systems (OWI, CDW) into an organized and optimized format resulting in more efficient data analysis and recommendations in support of schedule, cost, and quality initiatives.Conduct post-delivery after action reviews with manufacturing 1st and 2nd level managers, team leads, mechanics, quality groups, and shipside support to discuss performance to quality, cost, and delivery. Mitigate any foreseeable risks on future airplanes through a development of best practices generated in the after action review. Communicate risks and share best practices to delivery center stakeholders to maximize effectiveness and reach.Worked within the 777 Wings Industrial Engineering group on a 6-month rotation where I managed the roles and responsibilities of a barchart analyst for the Laydown control codes (203 & 810), performed various work measurement samplings on manufacturing teams and internal teams within the 777 Wings areas, conducted time studies in Wing Majors, coordinated wing delivery crane moves to the Major Structures Delivery Center, transferred work from current control codes to downstream control codes and vice versa in support of a machined rib initiative and changing work flow, supported a major recovery effort of a wing with mislocated trunnion fitting holes, collaborated with multiple organizations and supported a barchart walk initiative. Show less