Senior Project Manager
Greater Minneapolis-St. Paul Area
Transportation Lead: Developed a preliminary transportation one year plan for business development. Provided training on MnDOT Transportation plans. MnDOT D8 TH 30 Rehabilitation, Lake Wilson and Slayton, MN - This project involved the mill and overlay of approximately 13 miles of mostly rural roadway and ADA in both Slayton and Lake Wilson. MnDOT D3 TH 25 Final Design, Foley and Buckman, MN - These 2 projects involved resurfacing of about 5 miles of TH 25 near Foley (reclamation) and about 7 miles of TH 25 near Buckman (mill and overlay with ADA). MnDOT D8 TH 19/71 Preliminary and Final Design, Redwood Falls, MN - Developed a layout and plans to convert T.H. 19 into a two way left turn lane section between Patten Street and Quality Drive, including utility relocations, signing, striping and traffic control plans. MnDOT D1 TH 65 Final Design, Nashwauk, MN - This project resurfaced about 1.2 miles of TH 65 through the city of Nashwauk, including ADA design, drainage and a new trail. Plans included traffic control, signing and striping plans. Coordinated plan with another consultant developing plans to replace city water along TH 65. MnDOT D4 TH 27/TH 75 Final Design, Wheaton, MN - This project involved 11 miles of cold-in-place resurfacing of TH 27 and TH 75. The project also included design and replacement of box culverts and drainage. MnDOT D3 TH 6 Final Design, Emily, MN - This project resurfaced about 13 miles of TH 6 from south of Emily to Outing. Plans included drainage replacements and repair, two new turn lanes, removal of an access, and ADA improvements in Outing. MnDOT D1 TH 53 Final Design, Pike Lake to Independence, MN - This project replaced 10 miles of unbonded concrete overlay on TH 53. Met Council L38 Forcemain Design-Traffic Control Plans, Mound, MNPublic Speaking: "35E Mississippi River Bridge: After 18 Years" (with Dwayne Stenlund), 2020 Minnesota Erosion Control Association 32nd Annual Conference