I have extensive experience in mining automation with a comprehensive knowledge of control and protection systems, electrical maintenance and reliability engineering. I have measurable achievements in the management of instrumentation projects, upgrades and system integrations, coordinating all aspects of the project including design, maintenance & operations, installation, directing project teams, technical support and commissioning. I am an adaptable, resilient and innovative person with the ability to work under pressure, streamlining systems and processes to operate effectively and efficiently within safety critical environments.
-
Managing DirectorPcs Automation Solutions May 2021 - PresentSouth Africa -
Project Manager / Senior Systems IntegratorSiemens Sep 2013 - Feb 2019Midrand• Managed the commissioning and implementation of complete automation system integration upgrades and new system installations. • Led and co-ordinated multi-disciplinary project teams through the entire project phase to hand over, ensuring consistency with the scope of work and sequence of operations. • Provided technical support to the project group and collaborated with engineers, contractors and clients. • Performed Factory Acceptance Testing and created relevant reports.Projects included:o Kloof 1SV and 2SV winder control system upgrade - Achieved a 6 month completion time on an initially scheduled 12 month upgrade at the Kloof 2 sub-vertical rock/man winder. This was accomplished through pre-commissioning, correct planning and pro-active engagement with the customer and project support teams. o Kusasalethu winder control system upgrade. - Led phase 1 of the Winder upgrade project , responsible for the Capex application, scope of work, budget and implementation which included the upgrade of the supervision systems and speed position controls.o NCP TLP 1 and 4 PCS7 upgrade. - Successfully completed the NCP TLP 1 and 4 project upgrade throughout the project life cycle. By utilising Simit prior to commissioning, were able to reduce possible error and allow an improved and streamlined implementation process. Achieved profit during the design phase by changing products and reducing panel building time. - o OTMS Tank Farm in Saldanha Bayo Winder upgrade at Phalaborwa Mining Company. - Improved the daily tonnages per winder on a project upgrade at PMC. The skip payload was increased to 34T, cycle time of the winder changed and new features where added to the loading system to improve the cycle time to 121 seconds. All within the correct safety protocols of the winder and shaft. - -
Instrumentation SpecialistRio Tinto Phalaborwa Mining Company Oct 2002 - Aug 2013Successfully designed and implemented the largest PCS7 upgrade project in Africa at Phalaborwa Mining Company (PMC). The project was implemented in stages over a 12 month period running the old system in parallel to the new system installation. Integrated 10 different libraries into 1, created 2 ethernet networks and upgraded the entire system from version 4 to a universal version 7 system. • Preventative maintenance and optimisation on winder and underground automation sub-systems. • Identified faults and implemented improvements to automation systems that were not meeting the required standards. • Selected and implemented new hardware required to streamline processes and the installation and maintenance of all automation systems. • Performed site and project management, risk assessments, scope of work, manpower requirements, cost calculations and budget control. • Led control room and project teams ensuring regulatory compliance of safety, health, environment and quality (SHEQ) requirements. • Set the engineering standards for the PCS7 automation upgrade from 4 to version 7. • Performed initial Capex applications, calculating costs and scope of work, technical interchange, budget planning and presentation to board for approval -
Industrial Commissioning And Service EngineerSiemens Jan 1994 - Oct 2002• Contracted to Spoornet for the commissioning and servicing of the Class 38 and 14E1 locomotives and the repair of variable speed drives. • Performed site and project cost management, fault finding and reporting, hardware and software modifications, preventative maintenance and updating of documentation and user manuals. • Involved in the commissioning of the four koupe winders at Phalaborwa Mining Company. This was a world leading project implementing the first automated winders using PCS7. • System engineering, cost management, the design and implementation of modifications, updating the service and repair manuals, testing the safety of the system, fault finding and reporting and quality assurance control
Johan Vermaak Education Details
-
Instrumentation / Electrical Engineering (Light Current)
Frequently Asked Questions about Johan Vermaak
What company does Johan Vermaak work for?
Johan Vermaak works for Pcs Automation Solutions
What is Johan Vermaak's role at the current company?
Johan Vermaak's current role is Managing Director.
What schools did Johan Vermaak attend?
Johan Vermaak attended Tshwane University Of Technology.
Not the Johan Vermaak you were looking for?
-
-
-
2gmail.com, sascaffold.co.za
-
2anglogoldashanti.com, anglogoldashanti.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial