Mechanical Engineering Intern
Current- Designed and implemented a fixture for a crane rail to perform a more ergonomic alignment check on the rail.
- Analyzed and determined major causes of unplanned downtime for every machine in the forge finish department.
- Orchestrated a Kaizen event to redesign and organize a storage area for improved material flow, machine production, and efficiency.
- Redesigned and purchased tools to be used during production to improve efficiency as well as operator safety.
- Generated detailed drawings and led the procurement of a push roller to be machined.
- Aided in the design and configuration of a tank used to calibrate transducers for nondestructive testing (NDT).