Senior Architect
Current๐ก๐ฎ๐๐ถ๐ผ๐ป๐ฎ๐น ๐๐ถ๐ด๐ต๐๐ฎ๐๐ - ๐๐ผ๐๐ฒ๐ฟ ๐ง๐ต๐ฎ๐บ๐ฒ๐ ๐๐ฟ๐ผ๐๐๐ถ๐ป๐ด (๐๐ฟ๐ฐ๐ฎ๐ฑ๐ถ๐, ๐๐ข๐ช๐ ๐ฎ๐ป๐ฑ ๐๐ฎ๐ฐ๐ผ๐ฏ๐ ๐ท๐ผ๐ถ๐ป๐ ๐๐ฒ๐ป๐๐๐ฟ๐ฒ)Architecture and landscape team lead for a new (23km long) road linking the A2/M2 in Kent to the M25 in Essex to relieve congestion at the Dartford Crossing. The project includes two new (4.25km long) tunnels under the River Thames, three viaducts, over 40 bridge structures and a significant landscape integration across a variety of landscapes. Design coordination of tunnel portals preliminary design and landscape integration, authoring and coordination of the Project Design Principles, coordination of the Project Design Report (comprising ten volumes), along with other documents to support the Development Consents Order (DCO) submission in October 2022.SME during the formal DCO Examination hearings (October โ December 2023) responding to written and oral relevant representations from interested parties, statutory and non-statutory stakeholders.Ongoing legacy design support through the Project Delivery Partner and three main design and build contracts (Kent Roads, Tunnels and Roads North of the Thames).