Supervisor
CurrentThe facility is a 520 MW Natural Gas Plant that was built, owned and operated by Duke Energy. Duke Energy sold the plant to LS Power who then sold the plant to Dynegy in 2007. The plant was then sold to Vistra Energy of Texas in 2018. Casco Bay Energy is located in Veazie Maine.