John Hans Cuellar Díaz work email
- Valid
John Hans Cuellar Díaz personal email
Petroleum Engineer graduated from the University of America, with more than 16 years of experience in the drilling area. Expert in the basin of Llanos and Putumayo. Vast strengths in planning and strategic optimization of development wells, exploratory, deeper, HTHP among others. Management Skills and continuous improvement. Leadership and training of high-performance teams. I Possess experience in contractual management, competitive processes
Empleamos S.A
-
Company ManEmpleamos S.A Dec 2020 - PresentColombia
-
Senior Drilling EngineerUnion Temporal Wes Jul 2020 - Aug 2020I delivered the required documents in the last phase for the Quriyana 04 well: final drilling report, updated risk matrix with materialized events, consolidated archive of lessons learned, Well Integrity Format.
-
Senior Drilling Engineer Fase Ejecución Pozo QuriyanaConsultec International Inc Jan 2020 - Jun 2020Bogotá, Distrito Capital, ColombiaExecuted the Quriyana 04 well in Putumayo, following ECOPETROL´s Well Delivery process methodology, I directed operational programs based on landmark tool simulations. I managed government documents like Forma 5 CR. I consolidated the lessons learned that materialized at the well. -
Ingeniero Senior De PerforaciónConsultores De Servicios Integrados Jul 2019 - Jan 2020Bogotá D.C., Colombiarealizo planeación para el cliente Ecopetrol, mediante la metodología "Well Delivery Process" para los campos Caribe, Churuyaco, Sucio, San Antonio en el Departamento de Putumayo y campo San Francisco en el Departamento de Huila, donde analizo los pozos de correlación, determino riesgos operativos, diseño estados mecánicos que mitiguen los problemas, genero los correspondientes estimados de tiempos y costos y se generan las bases de diseño.
-
Senior Drilling EngineerConsultores De Servicios Integrados Jul 2019 - Jan 2020Bogotá D.C., ColombiaLed planning for client Ecopetrol with methodology Well Delivery Process for the fields Caribe, Sucio, Churuyaco, San Antonio and San Francisco, reviewed offset wells, identified operational risks, designed the different mechanical status with their costs, time and Basis of design.
-
Drilling And Completion ManagerVetra Exploración Y Producción Colombia S.A.S Mar 2018 - Mar 2019Bogotá D.C. Area, ColombiaLed the planning of the drilling campaign of the Southeast field, Putumayo Basin, implementing new processes and engineering for continuous optimization. I Led workover operations. Developed and implemented the Well delivery process system for the drilling area. Standardized processes, policies, and procedures in search of the continuous improvement of KPIs -
Directional Drilling EngineerWeatherford Jun 2017 - Mar 2018• Execution of drilling operations in Palagua & Acordionero Field, Drilling holes from surface to TD (4500-10000 ft) • Wells type J and type S.• Check out tools such as drilling motors, emitting sub, tool carrier and NMDC.• Consolidate lessons learnt• Perform drilling according to plan with different dog legs severities -
Senior Drilling EngineerConsultec International Sep 2016 - Mar 2017Rubiales• Execution of drilling operations in Rubiales Field, Drilling holes from surface to TD (4500-5000 ft)• Wells type J, Horizontal.• Check drilling programs and suggest changes• Identify ILT (Invisible Lost time) and NPT (Non productive time) and look for solutions• Participate at investigations to found root causes• Fill out the Ecopetrol documentation about Well Delivery process• Control Cost• Consolidate Lessons learnt• Performing field programs for relevant operations such as :o Drilling (Conventional strings, Mud Motors) for different hole diameterso Running and Cementing Casing and Linerso Wellbore cleanouto CBL-VDL logging o Drilling horizontal sections in sands (3-5 ft TST)o Fishing operations. o Issues of Rubiales Field (differential sticking, Stuck pipe, Incomplete running log) -
Senior Drilling EngineerGexdes Jan 2015 - Sep 2016Villavicencio• Planning and Execution of drilling operations in Castilla Field (Castilla – Castilla Norte), Drilling holes from surface to TD (7600-10000 ft)• Wells type J (low and high angle), Horizontal.• Check drilling programs and suggest changes• Identify ILT (Invisible Lost time) and NPT (Non productive time) and look for solutions• I was in charge of the execution of 5 rigs • Control Cost• Consolidate lessons learnt• Performing field programs for relevant operations such as :o Drilling (Conventional strings, Mud Motors, RSS (Power Drive, Geopilot) for different hole diameterso Running and Cementing Casing and Linerso Drilling without returnso Enlargement operations (While drilling)o Wellbore cleanouto Wellbore logging (Wireline, TDL and LWD) o Drilling horizontal sections in sands (7-20 ft TST)o Fishing operations. o Issues of Castilla Field (Mud losses, differential sticking, Stuck pipe).o Working 1500 HP Land Rig -
Senior Drilling EngineerConsultec International Feb 2014 - Dec 2014Bogotá• Planning of drilling operations in Cupiagua Field about 13 wells.• Comparing different alternatives of directional profiles for each well like re-entry or from surface. The objectives were to reach the Barco and Guadalupe Formations• Wells type J and Re-entry• The Costs AFE were around 25 MM US$ - 50 MM US$.
-
Junior Ii Drilling EngineerGlobal Petroleum Services Nov 2009 - Jan 2014Bogotá, Yopal• Planning and Execution of drilling operations in Cupiagua Field, 1 well from surface and 5 re-entries.• Wells type J and type S, Re-entries from 14000-15000 ft to 17000 - 18500 ft• Check offset wells • Identify NPT (Non productive time) and look for solutions• Create AFE• Coordinate Operations and materials• Control Costs in the execution (The Costs were around 12 MM US$ for Re-entry and 49 MM US$ for the well from surface)• Performing drilling programs for relevant operations such as :o Drilling (Conventional strings, Mud Motors, RSS as Autotrack, Turbine) for different hole diameterso Directional drilling plano Whipstock Operations Re-entrieso Mud Strategy (Oil base mud and Water base mud)o Casing Designo Running and Cementing Casing and Linerso Wellbore cleanouto Wellbore logging (LWD, Wireline)o Fishing operations. o Issues of Cupiagua Field (Wellbore stability, differential sticking, Bit sticking)o Working 3000 HP land Rig
-
Junior I Drilling EngineerDrilling And Workover Services May 2007 - Nov 2009Bogotá,• Planning and Execution of drilling operations in the Exploratory group, drilling in different reservoirs of Colombia (Valle Inferior, Valle Medio and Valle Superior Magdalena, Catatumbo) • Wells type J and type S with different depths (Wells between 4000 ft and 16000 ft)• Check offset wells • Identify NPT (Non productive time) and look for solutions• Create AFE• Coordinate Operations and materials• Control Costs in the execution (The Costs were around 1.5 MM US$ - 23 MM US$)• Performing drilling programs for relevant operations such as :o Drilling (Conventional strings, Mud Motors, RSS as Autotrack – PowerDrive - Geopilot) for different hole diameterso Directional drilling plano Mud Strategy (Oil base mud and Water base mud)o Casing Designo Running and Cementing Casing and Linerso Wellbore cleanouto Wellbore logging (LWD, Wireline)o Fishing operations.
-
Operational EngineerDrilling And Workover Services Dec 2004 - May 2007Bogota/San Martin / VichadaDrilling wells from surface to 4000 ftControl costsFill out reports such as Open WellsWorking 750 HP rigI was Production Engineer in Camoa Well, PCP system, Heavy oil 11.2º APIFill out the government documentsPerforming Dewatering and water treatments
John Hans Cuellar Díaz Education Details
-
Fundación Universidad De AmericaIngeniero De Petroleos
Frequently Asked Questions about John Hans Cuellar Díaz
What company does John Hans Cuellar Díaz work for?
John Hans Cuellar Díaz works for Empleamos S.a
What is John Hans Cuellar Díaz's role at the current company?
John Hans Cuellar Díaz's current role is JOHN CUELLAR.
What is John Hans Cuellar Díaz's email address?
John Hans Cuellar Díaz's email address is jo****@****oup.com
What schools did John Hans Cuellar Díaz attend?
John Hans Cuellar Díaz attended Fundación Universidad De America.
Not the John Hans Cuellar Díaz you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial