John Fadden, Pe work email
- Valid
- Valid
- Valid
John Fadden, Pe personal email
John Fadden, P.E.Professional Civil EngineerEducation - B.S., Civil Engineering, California State University at Chico, 1997Registrations - Professional Civil Engineer, California Professional Summary:I have 20+ years of experience in a variety of civil engineering projects. Major project engineering and construction management experience includes pump station design, tank construction, pipelines and appurtenances. In addition, I have been in charge of the design and layout of roads, site grading for large-scale subdivisions (industrial, commercial, and residential), infrastructure design (water, sewer, and storm drain systems), hydrology, sewer force mains, water system modeling, and hydraulics. Project responsibilities have included cost estimating, client/billing reports, design schedules, submittal review, correspondence, predesign, hydraulic system reports, Stormwater Pollution Prevention Plans (SWPP), plot plans, project/team management, construction support, and construction inspection services. Utilize Civil 3D and LDD design tools with engineering judgment to develop working construction documents.Specialties: Land Development & Planning; Water Resource Engineering; Civil Site Design; Major Pipeline Design; Pumping Stations and Water Storage Tanks; WWTP Site Engineering; Airport Engineering; Hydraulic & Storm Modeling
-
Senior Civil EngineerAuerbach Engineering Corporation Oct 2020 - Nov 2023Tahoe City, California, Us -
Senior Civil EngineerFrayji Design Group Oct 2017 - Sep 2020Roseville, California, Us -
Senior Civil EngineerMge Engineering Sep 2016 - Aug 2017Sacramento, Caliifornia, Us -
Senior Civil Project EngineerCardno Wrg 2011 - 2016Land Development/Project EngineerSignificant Projects-• Upper and Lower Billy Creek Recreational Facilities, Huntington Lake, Fresno County, CA• Northwest Land Park, Sacramento, CA • Sonoma Highway Water Main Extension, Santa Rosa, CA • Arbor Creek, Sacramento County, CA • Jackson Rancheria, Jackson, CA • In-N-Out Burger, Modesto, CA • In-N-Out Burger, Sacramento County, CA • In-N-Out Burger, Santee, CA • The Home Depot, various locations throughout CA • Buffalo Wild Wings, Santee, CA • Dublin Retail Center, Dublin, CA • Creekside Landing Industrial Center, Fremont, CA • Traffic Control Plan Review, various locations throughout CA • Bijou Utility Relocation, South Lake Tahoe, CA • PG&E Permit Coordination, various locations through northern CA
-
Civil Engineer, Project EngineerKennedy Jenks Consultants 2008 - 2010San Francisco, Ca, UsProject Experience■ LAX 2008-9 Expansion & Modernization Project, Los Angles, CA: Project Engineer■ Linda County Water District, Wastewater Treatment Plant Upgrade and Expansion Project, Linda County, CA: Project Engineer involved in the design of the upgrade and expansion of a 1.8-MGD secondary wastewater treatment facility to a 5.5-MGD tertiary treatment facility. ■ Sacramento CAS, Sacramento International Airport Terminal Modernization Program, Design Development Phase – Sacramento, CA: Project Engineer for $1.27 billion Design-Build Sacramento International Airport Terminal Modernization Program consists of addition of a new central landside terminal, airside concourse, parking structure, elevated roadway, hotel, automated people mover and upgrades to outdated facilities, to serve more than 20,000 passengers a day. Created utility layout plans for approximately 400 sheets of landside and airside utilities. ■ Sacramento County Airport System, Sacramento International Airport Terminal Modernization Program – SCAS Airport Potable Water System and Cross Connection Evaluation, Sacramento, CA: Project Engineer responsible in coordinating a potable water system evaluation and inspection of approximately 200 backflow prevention devices. ■ Sacramento County Airport System (SCAS), Water System Model - Fire Flow Testing: Assisted in conducting a hydraulic analysis of the existing water system fire flow capacity to propose improvements and to verify design parameters for the new Terminal Modernization Project. Conducted hydrant flow testing plan in order to obtain appropriate information to calibrate the water model. Construction Inspection■ City of Roseville, Northeast Water Storage Reservoir Replacement Project, Roseville, CA: Provided construction inspection for a new 10-MG prestressed water storage tank. This project included tank construction, excavation, site grading, piping, valve vaults, offsite drainage, paving, electrical, and SCADA. -
Senior EngineerNolte Associates 2004 - 2008Hollywood, Fl, Us■ City of Sacramento, 3rd Street Combined Sewer System Relief Project, Sacramento, CA: Extensive preliminary engineering study for the combined system to provide relief for stormwater runoff and sanitary sewer. The project involved developing preliminary design documents with detailed plan and profile sheets along the proposed alignment. Challenges included layout of a approximately 5,200 feet of 42 and 48-inch large diameter pipeline in an existing highly congested utility network, and options for trenchless technology at key locations (for example, the K Street pedestrian tunnel). In addition, extensive coordination with existing utility providers was conducted.■ City of Manteca, Wastewater Quality Control Facility Phase III Expansion, Manteca, CA: • Schedule D: Layout of large diameter 12- inch to 42-inch facility process piping. Plan and profiles were developed for each large diameter pipe. Six different types of large diameter pipes intersected each other in several locations and required intensive layout to avoid any potential conflict during construction. Coordination with electrician engineer was conducted during design to avoid conflict with medium voltage layout for the project. A piping coordinate layout was also developed to prevent potential conflicts during construction. In addition, land development desktop was utilized to grade the site and the ponds for the facility. A 3D model was made to help visualize finish grading of the site. • Schedule C: Solids handling facility site layout, grading, and drainage along with process piping layout. Multi-discipline coordination with mechanical, structural, and plumbing. • Industrial Pipeline Project: Design Engineer responsible for rehabilitation of existing secondary pond and adding an additional 6-MG attached pond for aeration. Construction drawings included pond and berm grading, details for large diameter piping berm penetrations, inlet/outlet structures, and pump station layout. -
Project EngineerPsomas 2000 - 2004Los Angeles, California, Us■ City of Folsom, Empire Ranch - Hydraulic Modeling, Folsom, CA: Project Engineer in charge of site development, which included site access, utility and large piping layout, pavement design, and vault piping configuration. Also, hydraulic analysis was an important aspect of the Empire Ranch projects because they did not operate independently and operated via SCADA. Other aspects of projects included multi-discipline coordination, client contact, and large project coordination. ■ City of West Sacramento, Southport Town Center, West Sacramento, CA: Project Engineer responsible for site grading, layout & balancing, road & utility design/layout, drainage analysis, and water “cleaning” methods to improve drainage runoff. Other tasks included contact and coordination with client, city, and other firms; cost estimates; CSI format specifications; “front end” specification; major utility coordination; hydraulic analysis; and pad grading for 100-year events. -
Staff EngineerWinzler & Kelly Consulting Engineers 1997 - 2000Santa Rosa, California, Us■ City of Santa Rosa, Geysers Pipeline Project, Geyserville, CA: A 40-mile pipeline with four (4) pump stations that conveys 11-MGD of treated wastewater to the Geysers steamfields. Support Engineer responsible for preliminary alternative route analysis, cost estimation, mapping, GPS data collection, elevation assessment for pump stations, and feasibility of route studies. Project completed in 2002.
John Fadden, Pe Skills
John Fadden, Pe Education Details
-
California State University, ChicoCivil Engineering -
Incline High School, NvHigh School Diploma -
Cuesta College
Frequently Asked Questions about John Fadden, Pe
What is John Fadden, Pe's role at the current company?
John Fadden, Pe's current role is Lake Tahoe, NV.
What is John Fadden, Pe's email address?
John Fadden, Pe's email address is jf****@****idg.com
What schools did John Fadden, Pe attend?
John Fadden, Pe attended California State University, Chico, Incline High School, Nv, Cuesta College.
What are some of John Fadden, Pe's interests?
John Fadden, Pe has interest in Snowboarding/skiing, Kayaking And Fishing, Snowboarding, Biking, Camping And Hiking, Sports Fan.
What skills is John Fadden, Pe known for?
John Fadden, Pe has skills like Civil Engineering, Drainage, Sewer, Water, Hydrology, Stormwater Management, Land Development, Site Plans, Engineering, Construction, Construction Management, Hydraulics.
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial