Safety
- After TAMINCO closed, remained Safety person for site remediation. Contracted to Arkema, via KellyServices.
- Maintained sign in log and control site Entrance and Exits. Monitored Contractors during siteremediation, ensured safe work practices and conditions.
- Maintained, monitored and recorded secondary Physical log of Photo ionization Detector. (Site Airmonitoring )
- Maintained and operated River pumps and Site drainage ponds. Log Flow meter readings of groundwater pumped, on a daily basis.
- Monitored and maintained fence line, emergency gates and barriers for damage. Inspected high polelighting, log water and electric meters for monthly usage report.