John Sears
AeroLeads people directory · profile

John Sears Email & Phone Number

Location: Greater Perth Area, Australia 11 work roles 1 school
1 work email found @ugllimited.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email j****@ugllimited.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Director
Location
Greater Perth Area, Australia
Company size

Who is John Sears? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

John Sears is listed as Director at Project Imperium Group, a with 3 employees, based in Greater Perth Area, Australia. AeroLeads shows a work email signal at ugllimited.com and a matched LinkedIn profile for John Sears.

John Sears previously worked as Lead Cost Controller - Eliwana, Capital & Power Projects at Fortescue Metals Group and Cost Controller at Ugl Limited. John Sears studied at Toolooa State High School.

Company email context

Email format at Project Imperium Group

This section adds company-level context without repeating John Sears's masked contact details.

{first}.{last}@ugllimited.com
86% confidence

AeroLeads found 1 current-domain work email signal for John Sears. Compare company email patterns before reaching out.

Profile bio

About John Sears

I have been working in Project Controls for over 15 years in Infrastructure, Mining and Processing Construction. In this time I have been involved in the full life cycle of projects from pre-feasibility studies through to project close out.

Listed skills include Project Control, Mining, Construction, Cost Engineering, and 45 others.

Current workplace

John Sears's current company

Company context helps verify the profile and gives searchers a useful next step.

Project Imperium Group
Project Imperium Group
Director
Employees
3
AeroLeads page
11 roles

John Sears work experience

A career timeline built from the work history available for this profile.

Lead Cost Controller - Eliwana, Capital & Power Projects

Perth, Australia

Jul 2018 - Jun 2020

Cost Controller

Perth, Australia

Jul 2016 - Jun 2018

Data Integrity Manager

Perth, Australia

In the role of Data Integrity Manager I was tasked with assisting the procurement team through data cleansing and analysis while also leading the Data Integrity team composed of Master Data and Reporting Officers. In addition to providing key analysis, I facilitated self-service analysis by building analytic tools utiliising Microsoft Power BI.

Apr 2015 - Jun 2016

Lead Cost Controller - Port, Rail & Energy

Perth

I was first engaged at FMG as lead cost control on the Christmas Creek Upgrade ($AU900m) which included the construction of an additional Ore Processing Facility and associated infrastructure at the Christmas Creek in Western Australia. In addition to this I oversaw other smaller projects, the largest of which being the addition of a wet front end to the existing Ore Processing Facility at the Cloudbreak Mine in Western Australia ($AU300m). In late 2013, I was tasked with closing out the T155 Rail Project which though close to completion in a physical sense, required significant work from a project controls perspective particularly in the data analysis space to assist the Project Directors with variation claim assessments. Early in 2014 I was tasked with leading the Cost Control team on the AP5 Project ($AU250m) which involved the construction of an additional Wharf in Port Hedland as well as reconfiguration of the conveyor outload circuit. During my tenure as a Lead Cost Controller at FMG, I was also involved in numerous estimates, options studies and general data analysis to support both operational and project sides of the business.

Jul 2012 - Apr 2015

Lead Cost Engineer

Brookfield Rail

Perth

The Midwest Rail Project ($AU540m) involved upgrading approximately 200km of rail from Geraldton to Tilley in Western Australia. As Lead Cost Engineer John was tasked with implementing the cost control system (CMS), leading and training all junior staff as well as leading the team from a cost perspective in addition to general cost control duties.

Jun 2011 - Jun 2012

Senior Cost Engineer

Boyne Island / Montevideo

The Boyne Smelter Development Project ($AUS685m) included a Brownfields component of upgrading and repairing the existing crane runway and installation of a new Alumina Distribution System and a Greenfield Carbon Bake Furnace. In addition to general Cost Control duties, I created a customised planning tool which would show the optimal work footprints given location availability. Following my tenure on the Boyne Smelter Development, I was seconded to the Valentines Feasibility Study in Montevideo, Uruguay. In this role I was responsible for the implementation and operation of the cost system and development of project controls procedures. Additionally, I developed all escalation profiles for anticipated construction resources as well as claim assessment, monthly report preparation and intermittently performed the project scheduling role.

Apr 2009 - May 2011

Lead Cost Control Specialist

Sandwell Engineering (Now Owned By Ausenco)

Rio De Janeiro Area, Brazil

The Corumba Expansion Project (US$2.1b) involved the expansion of the existing mine from 2.4Mtpa to 10.4Mtpa facilities as well the development of material handling in hubs along a river running from Brazil through to Uruguay where offloading and reloading would be required on to different barge configurations. In my role I was responsible for the roll out of the cost control system as well implementation of the change management process while leading the local cost team. The project was cancelled during this tenure at which point my role shifted toward ensuring proper close out of all financials.

Oct 2008 - Apr 2009

Senior Cost Engineer

My initial role at KBR involved producing a pre-feasibility estimate for above ground infrastructure for the proposed WAFI mine upgrade in Papua New Guinea. This included options for all road access, water and power supply, concentrate handling and port facilities.In September 2007, I transitioned to the Kestrel Mine Extension Project ($AU586m) chiefly handling the change management process. During this time I also provided many options studies as well as performing normal cost control duties.

Mar 2007 - Oct 2008

Cost Engineer

Perth

In the position of Cost Engineer for the Brownfields Mine Expansion at Tom Price ($AU370m) my duties included cost forecasting, weekly/monthly cost and progress reporting, CMS administration, preparation of capital appropriation requests, processing of contract variations; and processing of contractor payments.

Mar 2006 - Jan 2007

Cost Engineer

Newcrest Mining

Telfer

My position as Cost Controller for the Telfer Project - Stage 7 (AU$1.5b) involved cost forecasting of the overland conveyor, surface infrastructure, power station, underground electrical, and underground development in addition to schedule updates, processing of contract variations and processing contractor payments.

May 2005 - Mar 2006
Team & coworkers

Colleagues at Project Imperium Group

Other employees you can reach at projectimperium.com.au. View company contacts for 3 employees →

1 education record

John Sears education

  • Toolooa State High School
    Toolooa State High School
FAQ

Frequently asked questions about John Sears

Quick answers generated from the profile data available on this page.

What company does John Sears work for?

John Sears works for Project Imperium Group.

What is John Sears's role at Project Imperium Group?

John Sears is listed as Director at Project Imperium Group.

What is John Sears's email address?

AeroLeads has found 1 work email signal at @ugllimited.com for John Sears at Project Imperium Group.

Where is John Sears based?

John Sears is based in Greater Perth Area, Australia while working with Project Imperium Group.

What companies has John Sears worked for?

John Sears has worked for Project Imperium Group, Fortescue Metals Group, Ugl Limited, Brookfield Rail, and Snc-Lavalin.

Who are John Sears's colleagues at Project Imperium Group?

John Sears's colleagues at Project Imperium Group include Ron Hastings, James Hastings, Kate Hastings, and Camilla Seymour.

How can I contact John Sears?

You can use AeroLeads to view verified contact signals for John Sears at Project Imperium Group, including work email, phone, and LinkedIn data when available.

What schools did John Sears attend?

John Sears studied at Toolooa State High School.

What skills is John Sears known for?

John Sears is listed with skills including Project Control, Mining, Construction, Cost Engineering, Earned Value Management, Feasibility Studies, Rail, and Forecasting.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the John Sears you were looking for.

View similar profiles