Belt Utility
Current-Maintain 48 inch to 72 inch belt perform splicing as needed. As our Longwall advances, the removal of belt and as sections advance installation of belt -Change out defective or damaged idlers and structure- Maintaining scrappers system installations. -Maintaining belt spray installations. Leveling and grading belt line to help maintain belt training. On occasions installation and removal of Belt drive installations and storage unit installations: Gridding/ aligning drive and pump motors and hosing hydraulic/ cooling systems.- Use of Oxygen and Acetylene, Welding (Non Certified), Mato Splicing equipment, Corba drills, jack legging and Air/Power tools.- Equipment: Nonpermissible and permissible 25X, 30X, 3.5 and 14X, scoops, Ford and Holland tractor, Mustang uniloader and International Loader.-Safety