Deputy Director
Head of Operation and Maintenance Department of the centralized chilled water plants and network. The system got a capacity of about 65KRTon and supplies quality chilled water to all building at Marina Bay District including MBS, MBFC, OFC, Asia Square and Westin Hotel, etc. Worked closely with hotels and commercial buildings counterparts for operation optimization and higher energy efficiency.Improved chilled water storage capacity by 50%, from 35 MWrH to 53 MWrH.Successfully rectified electrical room air conditioning system defects and lowered the room temperature from 31 to 26°C, which drastically reduced fire risk in the room and enhanced plant safety. Successfully implemented an Outdoor Cooling project at National Day Parade 2018 to test and proof feasible ways to unlock precious outdoor space for the future of Singapore.Successfully implemented a Waste to Energy (WtE) system at Gardens by The Bay as an alternate way for national waste disposal.