Technical Submissions Manager
CurrentNDHJV (From May 2024)Pre-contract & Services (Head Office) (From July 2023)Claims on TKO - Lam Tin Tunnels (April - June 2023)Claims for East Kowloon Cultural Centre. (Nov 2022 - April 2023)
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
John Wright is listed as Technical Submissions Manager at Leighton Asia, a with 2824 employees, based in Hong Kong Sar, Hong Kong. AeroLeads shows a matched LinkedIn profile for John Wright.
John Wright previously worked as UK career break (COVID rules applied). at Uk and Pre-Contract Coordinator at Continental Engineering Corporation. John Wright holds Bachelor Of Engineering - Be, Civil Engineering, Hons from University Of Leeds.
This section adds company-level context without repeating John Wright's masked contact details.
Review company-level records connected to John Wright before choosing the right outreach path.
5 years experience in the UK and 27 years in Hong Kong
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
Hong Kong Sar
NDHJV (From May 2024)Pre-contract & Services (Head Office) (From July 2023)Claims on TKO - Lam Tin Tunnels (April - June 2023)Claims for East Kowloon Cultural Centre. (Nov 2022 - April 2023)
Uk
In UK from May 2022 - returned to Hong Kong late Aug 2022.
Hong Kong, Hong Kong Sar
Tendered for new projects in Hong Kong.Prepared and submitted the following tenders:-DC/2018/06DC/2018/07DC/2019/08ND/2019/02C19W10 YL/2020/03SS J509SD/2021/02Prepared (but didn't submit) tenders for:-HY/2019/13Prequalification for:-C19W10 (Progressed to Tender stage)C3310Made redundant April 2022 when CEC stopped tendering in Hong Kong.
Hong Kong, Hong Kong Sar
Chief Engineer (Contracts) 12/2012 - 05/2019Contracts 823A and 823B MTR Express Rail Link. HK$4.72Bn(823A contract included 4 tunnel drives using 2 TBM's)(823B contact included 1.6km of D-wall construction)Integral part of Claims team, notifying all Claim events, preparing claim submissions and negotiating with client both prolongation costs and other disruption costs.Claims included foundations, structure, roadworks and ABWF.Was a witness for Maeda in Arbitration with D-Wall Sub-contractor.Contracts Engineer7/2011 – 12/2012DSD project DC/2007/12 – 4.2km TBM Bored Tunnel project to alleviate flooding in the Tsuen Wan district of the New Territories. $1.12Bn. (Including blasting at shaft and Adit)Responsibilities included preparing claim documents for intake shafts, tunnels and outfalls.Contracts Engineer11/2009 – 6/2011Assisting tender team on XRL projects (811A, 823B, 810B, 810A). Coordinating and editing documents for Tender submission.Contracts Engineer/PQS2/2008 – 9/2012Contract No. KL/2005/01 - Development at Choi Wan Road and Jordan Valley Remaining Infrastructure Works - Stage 1. HK$129MThe major items of work comprise the construction of two slip road bridges and a footbridge and covered walkway that provide access to the newly formed development platform at Choi Wan Road and Jordan Valley.Contracts Engineer10/2003 – 6/2011Contract No. HY/99/18 - Castle Peak Road Improvement between Sham Tseng and Ka Loon Tsuen, Tsuen Wan. HK$764MRoad widening and realignment works include construction of road formation, viaducts and footbridges and the associated earth retaining structures, seawall, drainage and landscaping.
Hong Kong, Hong Kong Sar
Strategic Sewage Disposal System - Stonecutters Island. HK$320MDSD project to construct main pumping station & associated works. Valuing variations and preparing claim documents. Prepared, negotiated and agreed final account with EngineerWest Kowloon Expressway – South Section, contract forming one of the Airport Core Projects. HK$1,100M1.5km section of expressway & interchanges built on reclaimed land.
Hong Kong, Hong Kong Sar
West Kowloon Expressway – South Section, contract forming one of the Airport Core Project. HK$1,100M1.5km section of expressway & interchanges built on reclaimed land.Supervising subcontractors on the roadway section. Involved in daily progress meetings and weekly programme meetings. Worked closely with Resident Engineer resolving queries and exchanging correspondence.
Derbyshire, England, United Kingdom
A564 Derby Southern By-Pass, U.K. GBP£110MConstructing a dual carriageway and associated bridgeworks.Duties included producing method statements, permits to work and weekly productivity and wastage figures. Obtaining approvals from client and resolving queries raised.
Dronfield, England, United Kingdom
A165 Leven By-pass, Humberside, U.K. GBP£5.5MA64 Teeside Link-Stage II, U.K. GBP£2.5M 6 months Design Experince at Allot & Lomax Consulting Engineers, Manchester, U.KIndustrial Buildings & Waste Water Works, Yorkshire, U.K.Worked on four contracts varying from £700,000 to £6 Million.
Other employees you can reach at leightonasia.com. View company contacts for 2824 employees →
Noor Mohammed
Colleague at Leighton AsiaSingapore
View →
JM
Joseph Mandala
Colleague at Leighton AsiaIndonesia
View →
IK
Ip Ken
Colleague at Leighton AsiaHong Kong, Hong Kong Sar
View →
MM
Marvin Manabat
Colleague at Leighton AsiaCalabarzon, Philippines
View →
CY
Christopher Yee
Colleague at Leighton AsiaHong Kong Sar, Hong Kong
View →
PL
Peter Lee
Colleague at Leighton AsiaHong Kong Sar, Hong Kong
View →
HM
Hoarce Mois
Colleague at Leighton AsiaNew Territories, Hong Kong Sar, Hong Kong
View →
RR
Reanne Rose Gagan
Colleague at Leighton AsiaMetro Manila, National Capital Region, Philippines
View →
NM
Narender Makhijani
Colleague at Leighton AsiaThane, Maharashtra, India
View →
SS
Suwadi Suwadi
Colleague at Leighton AsiaGreater Semarang, Indonesia
View →
Quick answers generated from the profile data available on this page.
John Wright works for Leighton Asia.
John Wright is listed as Technical Submissions Manager at Leighton Asia.
John Wright is based in Hong Kong Sar, Hong Kong while working with Leighton Asia.
John Wright has worked for Leighton Asia, Uk, Continental Engineering Corporation, Maeda Corporation, and Aoki Corporation.
John Wright's colleagues at Leighton Asia include Noor Mohammed, Joseph Mandala, Ip Ken, Marvin Manabat, and Christopher Yee.
You can use AeroLeads to view verified contact signals for John Wright at Leighton Asia, including work email, phone, and LinkedIn data when available.
John Wright holds Bachelor Of Engineering - Be, Civil Engineering, Hons from University Of Leeds.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial Search contactsCheck these profiles if this is not the John Wright you were looking for.
View similar profiles