Operations Engineer - Hydroprocessing Catalyst Plant
Charlotte, Nc, Us
• Served as interim HPC Complex Superintendent, April – July 2017 -Encouraged a culture of safety superiority, environmental excellence, and operating discipline, while maintaining high production rates and high product quality. -Facilitated a high performance and collaborative team environment across Operations, Maintenance, Technical Resources, Research & Development, Engineering, and Logistics.• Managed the HPC North and Metal Solution Chemical Manufacturing Plants -Experienced in Alumina Precipitation Reactions, Metal Solution Reactions and Complexing, Alumina Oxide Manufacturing, NOx Scrubbing, Solids Handling & Transporting, Belt Filtration, Extrusion, Dry Mixing/Kneading, Rotary Calcining, Fluidized Drying, Blow Pot Conveying• Championed the integration of Northwest Analytics statistical process control software into daily operations, creating $650,000 in cost savings. -Improved quality performance from 96.8% to 100%, with multiple 18 month spans without producing any out of spec material, first time in 40 years of HPC manufacturing. -Collaborated with other Albemarle facilities across the world -Featured speaker at several highly regarded conferences and forums nationally and internationally • Accomplished a record setting production month, increasing HPC North rates from 583MT to 639MT• Increased Overall Equipment Effectiveness (OEE) from 75.7% to 79.8%• Created $200,000 in annual cost savings by creating a mass balance & batch blending program.