Project Manager / Quality Inspector
Nisku, Ab
Project managed of 100,000 weld inches of pipe spools (Devon Jackfish 3), MCC Buildings (MEG Energy) and Dehy Plants (Seven Generations Energy).Initiated the development/updating of the quality manual to reflect current fabrication practices.Ensured adequate evaluation of client RFQ requirements and technical / commercial specifications.Was responsible for the commercial, technical, and fabrication requirements, from initiation to closeout, on assigned projects (ITP development, cost / budget tracking, equipment / instrumentation procurement, maintaining customer / vendor relations, scheduling, turnover documentation deliverables). Conducted the design, sizing, selection, costing, estimating, and fabrication of equipment. Was responsible and accountable for scope definition, technical / commercial accuracy, completeness, and timeliness of projects. Prepared and developed detailed technical deliverables such as P&ID and layout drawings for fabrication and assembly, vessel designs for drafting, as well as instrumentation / equipment datasheets and manual valve BOMs for quotation and procurement. Led all project communications, meetings, risks, issues, and changes. Reviewed / checked / modified fabrication and isometric drawings, as well as As-Built P&IDs for work being conducted in the fabrication and assembly shops. Provided on-site startup and commissioning support for process equipment packages.