Jörgen Sjunnesson

Jörgen Sjunnesson Email and Phone Number

Field Surveyor Engineer @ Bruks Siwertell Global
Falkenberg, SE
Jörgen Sjunnesson's Location
Falkenberg, Halland County, Sweden, Sweden
Jörgen Sjunnesson's Contact Details

Jörgen Sjunnesson work email

Jörgen Sjunnesson personal email

n/a
About Jörgen Sjunnesson

I am a successful, highly motivated, adaptable and resourceful Senior Electrical Engineer, with over 20 years extensive experience with various electrical and electronic equipment in different environments, such as manufacturing, mining, petrochemical industry and construction projects around the world. My work includes procurement of electrical and mechanical material such as Middle and Low-voltage Switchgear systems, generator backup, heating-systems and electrical design for Hotel and industrial projects. I have also gained excellent experience with instrumentation and PLC programming system.My positions have been based mainly within the Design, Installation, Commissioning, Maintenance and training of local personnel.I also have extensive experience in managing positions such as Commissioning Lead for onshore projects with manufacturing and installation of LQ modules and winterization projects and as Maintenance Manager in a gold mine. I have successfully planned and executed the mobilization requirements of a multi billion USD project in Ethiopia with manpower requirements of up to 3000 laborers. I am a flexible and open minded person, a natural team leader and player, with excellent communication skills at all levels. I have wide experienced in leading and motivating multi-disciplined workforce with diverse national, lingual and cultural backgrounds.

Jörgen Sjunnesson's Current Company Details
Bruks Siwertell Global

Bruks Siwertell Global

View
Field Surveyor Engineer
Falkenberg, SE
Employees:
93
Jörgen Sjunnesson Work Experience Details
  • Bruks Siwertell Global
    Field Surveyor Engineer
    Bruks Siwertell Global
    Falkenberg, Se
  • Bruks Siwertell Global
    Field Surveyor Engineer
    Bruks Siwertell Global Oct 2019 - Present
    Bjuv, Skåne, Sverige
    Service Engineer
  • Siwertell Ab
    Site Supervisor
    Siwertell Ab Jun 2017 - Oct 2019
    Gunnarstorp, Bjuv, Sweden
  • Imes Electricité
    Commissioning Engineer
    Imes Electricité Jan 2017 - Apr 2017
    Warnemünde & Dörpen, Germany
    Commissioning on a HVDC project.
  • Wecotech Automation Ab
    Commissioning Engineer
    Wecotech Automation Ab Apr 2016 - Oct 2016
    Sweden
    Commissioning of Automation and Instrumentation system
  • Abb
    Commissioning Manager
    Abb Jul 2015 - Jan 2016
    Klaipeda In Lithuania
    Start-up 400kV sub-station for NordBalt HVDC Connection.
  • Abb Offshore Wind Connection
    Commissioning Field Engineer
    Abb Offshore Wind Connection Dec 2014 - May 2015
    Dolwin Alpha Germany
    Responsible for coordination and execution of multi disciplines MC and Commissioning activities offshore on a converter station (DolWin Alpha) who is part of the German Energiewende (Energy Transition) programme.
  • Aker Solutions
    Commissioning Engineer
    Aker Solutions May 2013 - Dec 2014
    Kristiansand Area, Norway
    Responsible for commissioning activities for the Electrical disciplines on Snorre A Drilling Facilities, refurbish project for an oil rig.Tasks include writing Commissioning Procedures for ea. Systems, implementation of all TAGs in the MC database system (ProCoSys) and link them with their MCCRs and CPCLs, prepare demolition-, commissioning and MC-packages, keeping track with 3rd party vendor Procedures, participation in IFAT, FAT etc. Utilising Aker Solutions based software such as Frames, Time and Project Wise. Other software I worked with is Statoil program as STID and ProCoSys. Project follow NORSOK standard.
  • Oneco Contracting As
    Commissioning Manager At West Hercules Project
    Oneco Contracting As Oct 2012 - Mar 2013
    Stavanger Area, Norway
    Responsible for commissioning activities for Electrical, Instrument and automation disciplines at the West Hercules Winterization Project of a drill rig in Sandnes and Ølen. Planning of activities to achieve targeted deadlines, implementing software based system for commissioning activities and structure of activities, planning and executing quality and HMS procedures related to commissioning, design and planning of procedures, support the activities of job package production and following up of quality issues in the field.
  • Apply Emtunga Ab
    Commissioning Engineer
    Apply Emtunga Ab Mar 2012 - Oct 2012
    Gothenburg, Sweden
    Responsible for MC and Commissioning scope of company projects. Apply Emtunga is a leading EPC contractor of steel Living Quarters for Offshore purpose.Some of my work tasks were to create QAP (Quality Assurance Plan), QCP (Quality Control Plan) and procedures for MC and Commissioning testing Procedure (MCP, CTP) and planning of the activities within the project schedule. Hand over to client after the discipline system has been finalised. Some of the tools I worked with are ProArc document control system, DePlan database design program, MC/Com check out database and Microsoft Office 2010.
  • Mepo (Midroc Ethiopia Project Office)
    Electrical Engineer
    Mepo (Midroc Ethiopia Project Office) Dec 2009 - Nov 2011
    Ethiopia Addis Ababa
    Construction of several projects such as a Six Stars Hotel, Shopping Center, Office Building,Hospital etc for a construction budget of more than One Billion USD. My responsibility in the company was with design, procurement, technical questions and supervision of installations work on site. I report direct to CEO.Midroc Ethiopia Project Office worked as an EPCC contractor.Engineering department who took care of the design what I was responsible for the electrical and electronic part. Basic design comes from an engineering consultant what I review, modify and verified all calculations so sizing of cables and switchgear fit to our constructions before approval. Procurement department was some of my part as well to take care of the electrical and electronic material. I have very good knowledge of the way to do the procurement. There are so many technical terms and data to get right material ones as power generation, switchgear LV/HV etc. Attend and approve FAT/SAT so the material/machines meets the specifications.Construction department: My role as a Senior Electrical Engineer is to attend to the site construction meetings to keep control of ongoing activities. Solve problems and make adjustment of the electrical design that could clash with other disciplines. The electrical site supervision was under my responsibility that I follow up daily progress of installations.Commissioning and completion of the electrical and electronic part go under my department.This is to guarantee that installations follow the design and work proper to the specifications.As-built updating and proper hand over documentations to the clients.
  • Ipms Ab For Abb Sweden
    Installation & Commissioning Supervisor
    Ipms Ab For Abb Sweden Aug 2008 - Sep 2009
    South Africa
    Refurbish project to replace existing “Static Var Compensator” units on five locations in South Africa. A 60 million USD project what I where responsible for the installation and commissioning on Site, reporting to Installation & Project Manager. Some of my working tasks where to planning the installation, adjust design for mechanical clashing during the installation, logistic and cost control etc.A static var compensator (or SVC) is an electrical device for providing fast-acting reactive power on high-voltage electricity transmission networks. SVCs are part of the Flexible AC transmission system device family, regulating voltage and stabilizing the system. The term "static" refers to the fact that the SVC has no moving parts (other than circuit breakers and disconnects, which do not move under normal SVC operation), unlike the Synchronous condenser, which is a rotating electrical machine. Prior to the invention of the SVC, power factor compensation was the preserve of large rotating machines such as synchronous condensers.
  • Ipms Ab For Ikea
    Start Up Engineer
    Ipms Ab For Ikea Aug 2007 - May 2008
    Samara, Russia
    Construction project of a large shopping mall complex where I provide support to the Project Management with regards to progress monitoring for all engineering disciplines, creating snag lists of remaining work items and push the construction company for finalizing of the project. My second task is to technically start up the store facility and train the operating engineer in all system including heating, ventilation, fire, electrical etc.
  • Promt Ab
    Installation Advisor/ Consultant
    Promt Ab Feb 2007 - Apr 2007
    Algeria
    Work as installation advisor at a paper making factory in Algeria. In charge and responsible for the entire installation of power and instrumentation as well as test and commissioning of the paper making equipment with an organization of expatriates, local staff and subcontractors.
  • Aker Kvaerner
    Mc Engineer
    Aker Kvaerner Nov 2006 - Feb 2007
    Nyhamna, Norway
    Mechanical Completion Engineer at Electrical and Instrument Department on a large gas project (Ormen Lange) in Norway. General inspection, QC and snagging of installed equipment in order to ensure complete contractual compliance prior to commissioning and hand over to the client.
  • Abv Rock Group Kb
    Chief Supervisor/Installation
    Abv Rock Group Kb Apr 2002 - May 2006
    Saudi Arabia
    In this company have I responsibility for the electrical and electronic installations on two underground petrochemical storage facilities in Abha and Buraidah. Some of the installations I were involved in was of a 8 MVA diesel fired underground Powerhouse with Deutz Generators, Sub-Station for middle voltage and low voltage with switchgear from Schneider Electric and ABB. Construction of a pipeline.A 250 km long pipeline supplied the storage plant with products. The pipeline installations utilised a booster pump station for which I was responsible for supervising the installations for the Electrical and Electronic disciplines. After completion and commissioning of the plant and pipeline did I participated in one year maintenance program after plant start-up.Some of my responsible for the operation in my department was:Plan and prepare Electrical and Electronic works & installations based on approval drawings & documents with respect to manpower, equipment and material.Interpret design drawing to confirm installation proceedings.Resolve installation issues & concerns.Coordinate interfaces work with other disciplines.Supervise personnel to achieve to the required production output.Motivate and train personnel to ensure quality of the work and efficient work execution.
  • Midroc Gold
    Manager Maintenance
    Midroc Gold Dec 1999 - Mar 2002
    Ethiopia
    In the gold mine was my position Manager for Metallurgy Operational Maintenance Service. This position is primarily responsible for the Installation, maintenance and most important the training of Ethiopian personnel in Electrical and Mechanical areas. When I began in the mine where I involved in three projects,● Construction of a 5 MVA diesel fired powerhouse standby plant.● A tunnel for underground mining production.● Construction of a crusher for the metallurgy operation.The existing power plant located in Saudi Arabia where dismantled and shipped to Ethiopia there I re-assembled it. The Caterpillar 2512 generator-set produced a 400 volt AC to a step up transformer which supplied the mine with a 15kV power supply. The plant is fully automated. My participation within the subterranean part of the project consisted of supervising the installation of an 3 x 500 KVA 400 Volt Cumming generator-sets and a 15 kV transmission system what we maintain and extend during the operation.Due to increase in rock crushing capacity did a second hand plant purchase from a sister company in Saudi Arabia. I was responsible for the Electrical Design, Installations and Commissioning of the plant during a twelve months period.
  • Sca Hygiene Products
    Industrial Electrician
    Sca Hygiene Products May 1991 - Nov 1999
    Falkenberg, Sweden
    Responsible for maintaining all production line equipment, trouble shooting of advanced PLC systems and maintenance of multi-motor drive systems. Other duties included installations in connection with retooling and production line changes.This position required extreme involvement and cooperation with in all engineering disciplines in order to optimise the machinery for maximum production, reliability and economy.
  • Hylte Bruks Ab
    Instrument Technician
    Hylte Bruks Ab May 1989 - May 1990
    Hyltebruk, Sweden
    Responsible for process control equipment such as PCs, analogue and digital metering equipment for pulp and paper production machinery common to the paper mill industry. Daily routines consisted of calibration of process equipment and technical support to the production and trouble shooting personnel.
  • Sca Hygiene Products
    Industrial Electrician
    Sca Hygiene Products May 1986 - May 1989
    Falkenberg, Sweden
    Responsible for maintaining all production line equipment, trouble shooting of advanced PLC systems and maintenance of multi-motor drive systems. Other duties included installations in connection with retooling and production line changes.This position required extreme involvement and cooperation with in all engineering disciplines in order to optimise the machinery for maximum production, reliability and economy.
  • Hylte Bruks Ab
    Instrument Technician
    Hylte Bruks Ab Jan 1984 - May 1986
    Hyltebruk, Sweden
    Responsible for process control equipment such as PCs, analogue and digital metering equipment for pulp and paper production machinery common to the paper mill industry. Daily routines consisted of calibration of process equipment and technical support to the production and trouble shooting personnel.

Jörgen Sjunnesson Skills

Electrical Epc Power Onshore Project Engineering Power Generation Gas Computer Hardware Offshore Drilling Instrumentation Commissioning Microsoft Works Electronics Motors Petrochemical Control Systems Design Fpso Oil Energy Engineering P&id Hydraulics Programming Plc Factory Process Control Construction Electricians Petroleum Testing Pumps Electrical Engineering Electricity Ms Project Pipelines Oil/gas Project Planning Procurement Management Project Management Switchgear Calibration Piping Maintenance And Repair Electro Mechanical Gas Turbines Dcs Power Plants Inspection Automation Oil And Gas

Jörgen Sjunnesson Education Details

  • Automation Engineer
    Automation Engineer
    Industry Process Automation

Frequently Asked Questions about Jörgen Sjunnesson

What company does Jörgen Sjunnesson work for?

Jörgen Sjunnesson works for Bruks Siwertell Global

What is Jörgen Sjunnesson's role at the current company?

Jörgen Sjunnesson's current role is Field Surveyor Engineer.

What is Jörgen Sjunnesson's email address?

Jörgen Sjunnesson's email address is jo****@****ell.com

What schools did Jörgen Sjunnesson attend?

Jörgen Sjunnesson attended Automation Engineer.

What skills is Jörgen Sjunnesson known for?

Jörgen Sjunnesson has skills like Electrical, Epc, Power, Onshore, Project Engineering, Power Generation, Gas, Computer Hardware, Offshore Drilling, Instrumentation, Commissioning, Microsoft Works.

Who are Jörgen Sjunnesson's colleagues?

Jörgen Sjunnesson's colleagues are Jorgen Ojeda, Ola Johansson, Fredrik Molin, Henrik Sjöholm, Fredrik Gustavsson, Patrik Ållemark, Tobias Woldt.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.