Jose Pando Email & Phone Number
Who is Jose Pando? Overview
A concise factual answer block for searchers comparing this professional profile.
Jose Pando is listed as Project Controls Specialist at Worley, based in Denver Metropolitan Area, United States, United States. AeroLeads shows a matched LinkedIn profile for Jose Pando.
Jose Pando previously worked as Project Controls Superintendent at Minera Yanacocha and Cost and Scheduling Control Chief Senior at Minera Yanacocha. Jose Pando holds Master In Design, Management, Project Management - Abd, Project Management from Fundación Universitaria Iberoamericana.
Email format at Worley
This section adds company-level context without repeating Jose Pando's masked contact details.
Review company-level records connected to Jose Pando before choosing the right outreach path.
About Jose Pando
Accomplished and results-driven bilingual Civil Engineer and Project Management Professional® (PMP) with twenty years of experience in Projects Controls in earthmoving, building construction, civil works, and electromechanical projects.Skilled in team building, resource management, problem analysis and resolution, and compliance with project goals within a safety, environmental, and social responsibility framework. Vast experience establishing baselines in cost and schedule for different stages of projects, cost and schedule control processes, and reporting. Skilled in cost accounting, integrated change management, earned value, and forecasts. Proficient at engaging all levels of management across diverse functions, building consensus, and recruiting support to yield the best collaborative solution. Passionate about projects, strong communicator mobilizing key stakeholders to achieve cost and schedule goals.
Jose Pando's current company
Company context helps verify the profile and gives searchers a useful next step.
Jose Pando work experience
A career timeline built from the work history available for this profile.
Project Controls Specialist
Current
Project Controls Superintendent
Leader of the Project Controls Team for the Quecher Main Project: A $315M brownfield project to develop the remaining oxide deposits: Quecher Main Pit and two additional oxide deposits (small pits), as well as the construction of the Carachugo 11 heap leach pad (5 hectares), Carachugo heap leaching 14 pad (52 hectares) and supporting infrastructure.- The.
Cost And Scheduling Control Chief Senior
Participated in the construction of projects as Tailings Storage Facilities North Expansion with an investment of $42M: earthworks and electromechanical works.- Responsible of the cost and schedule of the assigned projects.
Cost And Scheduling Control Chief
Participated in the construction of projects as Water Treatment Project - Emergency Works (a portfolio of subprojects of $50M of investment related to improve the storage and manage of water into Yanacocha) and Corrective Maintenance of San José Reservoir (installation of a second geomembrane sheet in a 6M m3 capacity reservoir and improvement of the leak.
Cost And Scheduling Control Supervisor
Participated in the construction of projects as East Acid Water Treatment Plant ($42M) and Reverse Osmosis Plant II of 500 m3/h capacity ($20M).- Lead the control team of electromechanical projects.- Identifying risks and opportunities to ensure compliance in cost and schedule of the assigned projects.- Implementation and dissemination of the Control Panel.
Cost And Scheduling Control Engineer In Earthworks, Civil Works, And Electromechanical Projects
- Responsible for the preparation, monitoring and analysis (in coordination with the Engineering, Construction, Logistics and Pre-Operations departments) of the schedule and cost incurred in the construction of the projects of the Projects Development Department: earthworks and electromechanical works.- Implementation of Earned Value to cost and schedule.
Scheduling Engineer
Participated in the construction of Lead, Silver and Zinc Concentrate Extraction Process Plant for Minera San Cristobal at Uyuni - Bolivia: Concrete Placement and Mechanical Assembly.- Responsible for the preparation and monitoring of the four-week schedule and control of the S Curve of the Project.- Preparation and evaluation of the labor productivity.
Technical Office Chief
Participated in the construction of La Quinua II diesel storage and dispatch station at Yanacocha: civil works and electromechanical works.- Responsible for developing the cost control structure and its monitoring, preparation of the Target Budget and evaluation of the acquisition of third-party equipment, ensuring its operability and the best price..
Field Engineer
Participated in the construction of 800 apartments in the Housing Condominium called "Alameda de La Molina": civil works, concrete works, building finishes and building services.- Responsible for the scheduling and execution of all earthworks, structures, electrical and sanitary installations, both interior and exterior, and all finishes.- Implementation.
Assistant Engineer Of Technical Office
Participated in the construction of Yanacocha Leach Pad Expansion Stage 5 and Stage 6: Earthworks and geosynthetics installation.- Control of the performance of the resources used during the execution of the project.- Responsible for the elaboration of budgets of additional works for the Client.- Review and approval of budgets for works carried out by.
Jose Pando education
Master In Design, Management, Project Management - Abd, Project Management
Civil Engineer
Frequently asked questions about Jose Pando
Quick answers generated from the profile data available on this page.
What company does Jose Pando work for?
Jose Pando works for Worley.
What is Jose Pando's role at Worley?
Jose Pando is listed as Project Controls Specialist at Worley.
Where is Jose Pando based?
Jose Pando is based in Denver Metropolitan Area, United States, United States while working with Worley.
What companies has Jose Pando worked for?
Jose Pando has worked for Worley, Minera Yanacocha, and Aenza.
How can I contact Jose Pando?
You can use AeroLeads to view verified contact signals for Jose Pando at Worley, including work email, phone, and LinkedIn data when available.
What schools did Jose Pando attend?
Jose Pando holds Master In Design, Management, Project Management - Abd, Project Management from Fundación Universitaria Iberoamericana.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Jose Pando you were looking for.
View similar profiles