Joseph Igama Email and Phone Number
I am a Registered Chemical Engineer and Project Professional, recognized for pioneering achievements as one of the only two Nigerian-based engineers certified by the American Petroleum Institute (API) as a Source Inspector for Fixed Equipment. With over 16 years of progressive expertise across Oil & Energy, Construction, and Information & Technology sectors, I am renowned for my unwavering commitment to excellence, agility, and integrity in every facet of my career.My career spans a diverse spectrum of disciplines including Subsea Engineering, Project Engineering & Management, and Digital Leadership, complemented by extensive knowledge in Fixed, Rotating, and Subsea Equipment. I excel in overseeing manufacturing, maintenance, inspection, and repair operations, adhering meticulously to API, ASME, DNV, and other industry standards. My proficiency extends to Process Engineering, Oil Movement Operations, Equipment Source Inspection, CNG and EV Technologies, Wireline Technology, Supply Chain Management, Sustainability, and Technical Risk Management & Safety, ensuring robust process design, pump station & tank farm operations, equipment supplier quality surveillance, wireline services, logistics & procurement, and the identification & mitigation of technical risk.With a proven track record in Product Management, Data Analytics, Business Analysis, and Program Management, I drive innovation and efficiency, consistently enhancing organizational processes and fostering sustainable growth. I am adept in Risk-Based Inspection methodologies, driving continuous improvement initiatives, and strengthening customer relationships through adept Customer Relationship Management (CRM).My technical acumen is underscored by proficiency in API, ASME, AWS, ISO and other codes & standards, enabling me to implement best practices in compliance and technical safety across projects. I am committed to ongoing professional development, leveraging strategic training to remain at the forefront of industry trends and advancements.In essence, I am a results-driven professional with exceptional communication skills and a collaborative mindset, dedicated to delivering unparalleled value and ensuring sustained competitive advantage for my employers through continuous improvement and innovation.
Pcngi - Presidential Compressed Natural Gas Initiative
View-
Technical Operations And Execution CoordinatorPcngi - Presidential Compressed Natural Gas Initiative Oct 2024 - PresentLagos State, Nigeria• Oversee the construction and commissioning of new CNG stations (mother, daughter and refueling) and other infrastructures nationwide.• Ensure CNG stations meet capacity targets and adhere to safety, efficiency, and scalability standards.• Monitor station uptime/downtime, maintenance schedules, and performance.• Lead the certification and approval of CNG vehicle conversion kits, ensuring compliance with safety and performance standards.• Coordinate the establishment of vehicle conversion centers in strategic locations, starting with Lagos.• Track conversion rates across different fleets and ensure vehicle uptime/downtime metrics are optimized.• Assess market share of CNG in the transportation sector and identify opportunities for expansion.• Ensure efficient and cost-effective CNG station operations, including maintenance costs and fueling transaction times.• Implement automation and real-time monitoring systems to streamline CNG station operations.• Develop and implement safety protocols for CNG stations and vehicle conversions centers.• Conduct regular safety audits, ensuring compliance with regulatory standards and industry best practices.• Develop and lead technical training programs for CNG stations' staff, vehicle converters, and end-users.• Maintain a national CNG infrastructure database to track station locations, capacity, performance, and expansion plans.• Provide regular updates and reports on KPIs related to CNG adoption and infrastructure development.• Drive technical aspects of market penetration efforts, focusing on expanding geographic coverage and increasing the number of CNG-operated vehicles and tricycles in operation. -
Program ManagerSterling Magna Technologies Jan 2021 - Oct 2024Lagos State, Nigeria• Oversaw a portfolio of projects, including the recent successful integration of new software across three departments, contributing to a 30% improvement in operational efficiency.• Aligned and balanced the interests of various stakeholders across multiple projects by conducting bi-weekly meetings and utilizing stakeholder feedback to refine project scopes, leading to a significant increase in stakeholder satisfaction.• Optimized resource allocation across projects, resulting in a 15% reduction in resource conflicts and a 10% increase in overall project efficiency by implementing a resource management tool.• Identified and mitigated risks and issues that affect multiple projects by establishing a risk management framework, reducing project delays by 40% and improving program stability.• Oversaw budgets for multiple projects, ensuring financial alignment and achieving a 10% reduction in overall program costs by implementing stringent budget monitoring and cost-saving measures. -
Project Delivery ManagerSterling Magna Technologies Dec 2017 - Jan 2021Lagos, Nigeria• Secured all necessary permits and licenses from regulatory authorities, expediting project initiation by 15%.• Determined specifications and allocated resources within a $2 million budget, maintaining financial integrity throughout the project.• Negotiated and managed third-party contracts and vendors, reducing costs by 12% and ensuring timely project execution.• Developed detailed phase-based project plans, enabling a 25% improvement in tracking and meeting project milestones.• Monitored and controlled the project using advanced systems and tools, resulting in a 20% increase in overall project efficiency.• Acquired and deployed high-quality equipment and materials, ensuring 100% availability and reducing downtime.• Evaluated project progress and prepared comprehensive reports for management, enhancing decision-making processes by 30%.• Ensured strict adherence to Health, Safety, and Environmental standards, achieving a zero-incident safety record.• Created and maintained comprehensive and accurate project documentation, improving project transparency and accountability. -
Principal Project EngineerSterling Magna Technologies Mar 2017 - Dec 2017Ajah, Lagos State, Nigeria• Initiated, planned, and executed a portfolio of 10 projects, ensuring specifications were met and achieving a 95% on-time completion rate through various decision gates to commissioning and closeout.• Applied standard project management tools and techniques, resulting in accurate scoping, planning, costing, execution, and control of projects, which led to a 20% increase in meeting contractual agreements.• Developed, coached, and managed a team of 15 project staff, improving overall team performance and achieving a 30% increase in project efficiency.• Established accurate cost breakdowns for invoicing, ensuring adequate cash flow and reducing financial discrepancies by 15%.• Ensured compliance with applicable codes, practices, QA/QC policies, and specifications, maintaining a 100% compliance rate and enhancing project quality.• Negotiated contracts with subcontractors, vendors, and suppliers, achieving a 10% cost reduction and securing favorable terms.• Developed and managed comprehensive project documentation, improving project tracking and accountability by 25%. -
Project Management SpecialistFifa Jun 2018 - Jul 2018Volgograd Region, Russian Federation• Accomplished FIFA Brand Protection Department’s strategic goals for the Russia 2018 World Cup, protecting the commercial rights of FIFA partners and sponsors who provided the bulk of the approved $14 billion budget.• Achieved a 100% retention rate of partners and sponsors for the France 2019 Women’s World Cup.• Implemented anti-counterfeit measures, reducing the incidence of counterfeit merchandise by 40%, thereby safeguarding brand integrity and sponsor investments.• Coordinated a brand protection campaign for the Russia 2018 World Cup, increasing official merchandise sales by 25% and enhancing sponsor visibility.• Developed and executed a compliance monitoring system, resulting in a 35% decrease in unauthorized use of FIFA trademarks, thereby strengthening legal protections for sponsors and partners. -
Senior Project Engineer (Subsea Equipment)Onesubsea Feb 2015 - Feb 2017Onne, Rivers State, Nigeria• Managed the schedule for engineering, procurement, fabrication, assembly, and testing of Subsea Manifolds and Foundations, achieving a 95% on-time delivery rate.• Oversaw the technical design by subcontractors, ensuring compliance with company requirements and industry standards, which led to a 20% reduction in design revisions through effective liaison with company specialists.• Participated in Design and Safety Reviews, HAZOP, HAZIDs, and Risk Assessments, identifying and mitigating 30% of potential project risks early on.• Ensured all interfaces were identified and closed per plan, meeting 100% of required deadlines and preventing delays.• Maintained close contact with interface partners, enhancing collaboration and reducing communication gaps by 25%.• Ensured compliance with applicable codes, practices, QA/QC policies, and specifications, achieving a 100% compliance rate.• Participated in FAT & EFAT, and followed up on punch lists and mechanical completion of Subsea Xmas Trees, resulting in a 15% improvement in mechanical completion times.• Monitored shipment, inspection, and testing of Subsea Spools and Xmas Trees, ensuring a 98% success rate in inspections.• Provided technical support during testing, loadout, installation, and commissioning of Subsea Xmas Trees, reducing installation time by 20%.• Closed out projects, including engineering and manufacturing documentation and lessons learned, leading to a 30% improvement in project closure efficiency. -
Senior Manufacturing EngineerCameron, A Schlumberger Company Feb 2015 - Feb 2017Onne, Rivers State, NigeriaCameron Valves and Measurement West Africa's Grove Facility • Manufactured various types, sizes and classes of over a thousand Ball Valves for Chevron’s Okan Pipeline Rehabilitation and SPDC’s Southern Swamp Associated Gas Gathering Solution Projects.• Conducted maintenance and repair on various types, sizes and classes of aftermarket valves for NLNG and Mobil’s Iyak Pigging Facility Upgrade Phase 3 Project at Cameron Grove Facility, Onne.• Implemented stringent quality control measures resulting in a 20% reduction in defect rates for ball valves produced for Chevron's Okan Pipeline Rehabilitation.• Streamlined manufacturing procedures, achieving a 15% increase in efficiency in producing various sizes and classes of ball valves for SPDC’s Southern Swamp Associated Gas Gathering Solution Projects.• Successfully coordinated the delivery and installation of over a thousand ball valves, meeting stringent timelines and budgetary constraints for both Chevron and SPDC projects.• Implemented comprehensive safety protocols during maintenance and repair operations at Cameron Grove Facility, resulting in zero workplace incidents during the NLNG and Mobil’s Iyak Pigging Facility Upgrade Phase 3 Project. -
Project EngineerSterling Magna Technologies May 2013 - Feb 2015Ajah, Lagos State, Nigeria• Successfully managed a portfolio of projects, achieving a 98% adherence to specifications through decision gates to commissioning and closeout.• Implemented standard project management tools and techniques, resulting in a 10% reduction in project timeline overruns and a 15% decrease in cost variances.• Managed and supported project staff, resulting in a 20% increase in team productivity and a 90% employee satisfaction rate.• Developed accurate cost breakdowns for invoicing, ensuring a 100% on-time payment rate and maintaining positive cash flow throughout projects.• Achieved 100% compliance with applicable codes, practices, and QA/QC policies, resulting in zero project delays due to non-compliance.• Implemented streamlined documentation processes, resulting in a 30% reduction in document retrieval time and improved project document accuracy by 95%. -
Project EngineerActel Nigeria Limited Sep 2009 - May 2013Lagos State, Nigeria• Successfully managed a portfolio of projects, achieving a 98% adherence to specifications through decision gates to commissioning and closeout.• Implemented standard project management tools and techniques, resulting in a 10% reduction in project timeline overruns and a 15% decrease in cost variances.• Managed and supported project staff, resulting in a 20% increase in team productivity and a 90% employee satisfaction rate.• Developed accurate cost breakdowns for invoicing, ensuring a 100% on-time payment rate and maintaining positive cash flow throughout projects.• Achieved 100% compliance with applicable codes, practices, and QA/QC policies, resulting in zero project delays due to non-compliance.• Implemented streamlined documentation processes, resulting in a 30% reduction in document retrieval time and improved project document accuracy by 95%.
-
Process Engineer (Intern)National Engineering And Technical Company Sep 2004 - Mar 2005Victoria Island, Lagos State, Nigeria• Utilized HYSYS to design and size gas gathering systems and compression stations, achieving a 99.89% accuracy in system capacity predictions. • Generated process design deliverables such as PFDs, P&IDs, and LDTs, ensuring a 100% compliance with project standards and client specifications.• Participated in the FEED for SPDC's Eastern Gas Gathering Scheme, resulting in a 10% reduction in project timeline through early identification of design challenges.• Effectively communicated process design information with other disciplines, ensuring integration and alignment of designs, which led to a 15% improvement in design efficiency.• Conducted process simulations using HYSYS, validating design assumptions with a 98% correlation between simulated and actual operational data.• Implemented design optimization techniques, resulting in a 12% reduction in overall project costs while maintaining design integrity and performance.• Facilitated technical reviews of process design deliverables, achieving a 90% approval rate from stakeholders and minimizing rework by 20%. -
Operations Engineer (Intern)Nigerian National Petroleum Corporation Nov 2002 - Feb 2003Ppmc, Makurdi, Benue State, Nigeria• Successfully carried out operations for streaming and re-streaming petroleum products (PMS, DPK, AGO) from Port Harcourt through Enugu Depot to Yola Depot, achieving a 99% on-time delivery rate.• Executed fiscalisation and defiscalisation operations using a special measuring tape and tank calibration chart, ensuring a 100% accuracy in product measurement and compliance with regulatory standards.• Managed Control Room operations utilizing SCADA and DCS systems, leading to a 95% reduction in operational downtime and improving response times by 20%.• Effectively monitored and managed the interface of petroleum products, minimizing product contamination incidents by 98.88% through proactive monitoring and intervention.• Prepared daily and monthly operations log reports with 100% accuracy, providing critical operational insights and facilitating informed decision-making.• Enhanced safety protocols resulting in zero safety incidents during tank farm operations over a 3-month period, ensuring a safe working environment for all personnel.
Joseph Igama Education Details
-
Sustainable Procurement Management -
Innovation, Digital Execution And Growth -
Business Lessons -
Chemical Engineering -
Alliance Française, OwerriLangue Française -
Mount Saint Gabriel'S Secondary School, Makurdi, Benue State.Sciences
Frequently Asked Questions about Joseph Igama
What company does Joseph Igama work for?
Joseph Igama works for Pcngi - Presidential Compressed Natural Gas Initiative
What is Joseph Igama's role at the current company?
Joseph Igama's current role is Program Manager| Project Professional| Registered Chemical Engineer.
What schools did Joseph Igama attend?
Joseph Igama attended Federal University Of Technology Owerri Nigeria, Tekedia Institute, Harvard Business School Online, Federal University Of Technology Owerri Nigeria, Alliance Française, Owerri, Mount Saint Gabriel's Secondary School, Makurdi, Benue State..
Not the Joseph Igama you were looking for?
-
1weyerhaeuser.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial