I was recently consult engineer (30 months) with aecom canada for the PHJIMU: Jiji Mulembwe Hydroelectric projet. The project is the construction of 2 Dams (Jiji & Mulembwe) in Burundi (Africa). Ly experience, in General, before that is on Onshore in Oil and Gas Industries; which I have Been Responsible for The Technical coordination of Civil / Structural Construction Activities With Client Management and Supervision During Construction Activities, for Installation to Pre-Commissioning Punch List Clearance and Handover Client. was Acting as a Construction Superintendent. Ensuring Project Schedules Were Maintained Monitoring the Quality of Construction and Ensuring Compliance with Both Contractual and Statutory Requirements. Compiling job Cards and QA/QC Procedures Raising Engineering Query for Civil/Structural design if Any Clashes, Engineering Design Changes and Modifications. I Have deep Knowledges on the Underground Tunnels, Bridges. i've worked in the North for Highway Project and the South of Algeria Over Industriel Construction, Pistes and all civil works in both of south & North of Algeria.
-
Consulting EngineerAecom Feb 2022 - Jul 2024Songa, Bururi, BurundiProject : PHJIMU - Jiji (34MW/120M3) Mulembwe Hydroelectric Project2 Dams / 5 Subtations / 9 lignes Client : RegidesoConsult engineer : Aecom CanadaConstructors : 2 Dams with 44km of road network around - Jiji & Mulembwe : CMC-Orascom 5 Substations : Horezo - Jiji - Mulembwe - Kabezi and RN1: Vinci 9 Lines : KEC (indian company) Subcontractors of CMC-Orascom : Sinohydro (tunnels); Avesturk from Turkey (Soil neels) and many local company's for Gabions and Roads4 New Substations : 1-Horezo 2-Jiji 3-Mulembwe 4-KabeziWith one exesting Substation wich is : RN1 (extension) Electrical transfer stations : Vinci-KECCMC-Orascom Subcontractors : Zutari-Rodio-Sinohydro-Avesturk-Andritz-Vortex and many local company'sLignes : Line 1 L=72.3 km (connects the two substations Horezo and Kabezi) Line 2 L=21.3 km ; Line 4 L=5km ; Line 5 L=4.3 km ; Line7 L=17.5 km ...these are all high voltage lines except line seven (line 7)Missions or Tasks Carried Out : * Supervise and control the construction work of hydroelectric developments in relation to civil aspects; - Check the on-site conformity of the plans, with the provisions provided for in the contracts; - Evaluate the additional work carried out by the Manufacturer, when it concerns work not provided for in the contract in support of REGIDESO; - Validate the plans and execution drawings under actual site conditions; - Approve construction methods; - Supervise the execution of all tests necessary to ensure the good quality of the materials used in construction and analyze the test results; - Evaluate the progress of the work, check their compliance with the contractual documents and take any necessary corrective measures; - Monitor the Manufacturer's construction methods and assess their compliance with its health/safety plan; - Give instructions to the Manufacturer for any situation deemed necessary. - Assistance with site meetings. -
Ingénieur ConseilAecom Feb 2022 - Jul 2024Songa, Bururi, Burundi -
Construction Projects ResponsibleAgc, Aichouche Civil Engineering Jul 2018 - Dec 2021Hmd (Hassi Messaoud, Ouargla).Coordinator (Civil engineering & civil works, Logistics, Administration, Budgets, Customer Relations).
-
Manager ProjectRega Djebnoun Fayçel Feb 2018 - Jun 2018Hassi Messaoud, Ouargla, Algeria.Connection of Water Injection Wells on The Hassi-Messaoud Field. REGA Djebnoun Fayçel. "Réalisation Electricité & Gaz".
-
Site Manager Eurl Tgctp; The Jgc Gosp Project, Hassi Messaoud.Eurl Tgctp ''Terrassement Génie Civil Travaux Pétroliers'' Nov 2017 - Dec 2017Houdh Hamra; Hassi Messaoud.GOSP Project Site Manager for the JGC Client. HASSI MESSAOUD UPSIDE NORHT PROJECT. ** INSTALLATION OF SECURITY FENCE. installation of Fence and gate will be doing during the Upside project. installation of 02 fences:1- Chain link fence. 2- Palisade fence. For GOSP AREA as per drawing supplied by JALG in UPSIDE HMS project.References:1. Site development & site preparation.2. MATERIAL DELIVERY3. RESPONSIBILITIES, AUTHORITY, ACCOUNTABILITY.5. EARTHWORKS.6.1 EXCAVATIONS.6.2 PLANT AND TOOLS REQUIRED.7. PREPERATION OF INSTALLING FENCE.8. CASTING CONCRETE - READY MIX.9. QUALITY CONTROL AND ASSURANCE.10. POLES INSTALLATION.11. FENCES INSTALLATION.12. GATES INSTALLATION.13. STRAINING OF WIRES.14. CUTTING OF STEEL MESH WIRES.15. HEALTH AND SAFETY. 15.1 Responsibilities, Authority & Accountabilities. 15.2 Using Of a Ladder. 15.3 Personal Protective Equipment. 15.4 First Aid, Emergency Equipment & Procedure. 15.5 Houskeeping (On a Daily Basis).16. EQUIPMENTS REQUIRED FOR THE ACTIVITY:- Excavator- Tipper truck- Wilding machine- Cutting machine- Concrete mixer- Vibrator- Compactor- Front End Loader- Water Tank- Shovels, Picks, jackhammer, Grinder and Drill Machine
-
Manager ProjectSogetrap Algerie Groupe Ramery France Jul 2017 - Oct 2017Rhourd Nouss - Hassi Messaoud Area.Project Manager for The Realization and Refurbishment of The Main Road to the Oil &Gas Field of Rhourd Nouss on More Than 12 kilometers.** The coating of the Stadiums Complex, in Cold Asphalt.** The Road Network of the DP Sonatrach.** Car Parks.** Gas Well Tracks.** The Duplication of the Entrance of The Airport and it's Car park.** The Gyration Ramp at the Entrance of DP Sonatrach base.
-
Engineer Civil/ Agc Project Manager "Ain T'Sila Field"Agc/Isarène; Aichouche Génie Civil/Groupement Isarène "Petroceltic-Sonatrach-Enel". Jul 2016 - May 2017Hassi Messaoud-In Aminas; South-Est Of AlgeriaProvision of Civil Engineering Works and Services to Support Well Engineering Operations.Throughout the well engineering programme there is (3) simultaneous operations: Civil works Water well drilling Drilling operations.Access Road Construction and Maintenance• Gypsum road maintenance or construction;Include crossing Wadi system;Signage.Refurbishment of existing infrastructure, construction of new infrastructure andongoing maintenance.• Gypsum pad;Concrete pad including drainage;Main & military & Security & Access check points camps pad construction; Car parking area; Access roads; Water & waste pits & septic tanks & sewage pipes;• Construction of security berms, concertina (razor wire), fences, ditches andaccess barriers;• Cabling and IT infrastructure (under grounds works).Main Road Infrastructure.• Gypsum road construction including lay-bys or passing places;• Include crossing Wadi system;Pipe yard & Warehouse.• Concrete work: warehouse pad, offices pad and other;General construction of waste water pit, fire water, and other.• Mechanic bay and washing area;• Bunds areas;Fences;Pipes support sleepers;Cabling and IT infrastructure.Airport• Reinstatement of the existing Airstrip, maintenance; extension of runway:Concrete paving to airstrip landing zones and parking areas;Airstrip cabin & telecom civil work;Installation of windsocks and weather station.• Supply, installation and maintenance of mats and tyres.Telecommunications infrastructure• Install infrastructure;Concrete pad including drainage;Masts construction & installation;Concrete blocks.Refurbishment of existing infrastructure.• Installation of water lines;• Weekly inspection report of water lines;• Installation of facility (gooseneck) to fill water tankers;• Cabins for operators connected to sewage system (septic tank, pipes & septic pit); Generators.• Construction of Water reservoirs;New Water Well Location Construction.
-
Engineer Civil/Civil Work Superintendent.Stagma Construction/Groupement Sonatrach-Agip "Gsa" Apr 2015 - Mar 2016Brn (El Borma), 400 Km South Hassi Messaoud, South Est Of Algeria Area.Civil Engineering (Engineer) in charge of: - - Monitoring the Production (Construction) of Two Pools (02 Unites);- - Three Post Armour (03 Unites), (Outposts Reinforced Concrete), GSA Customer.- - Both pools have a Wide dimension of : "13m on 30m" Covered by Long Roofing in "Metal Frame" with a Technical Room Commend ; each one ; in his Neighborhood who assists:* One on the New Base * and the other on the 24 February Camp at BRN .
-
1-Project Engineer; 2- Technical Department Head; 3- Project Director; 4- Acting Head Of Hmd Zone.Batisud Sep 2012 - Mar 2015Ouargla, Mnéa,Hassi Messaoud, Bechar, Ghardaia. " South Algeria Area Est & West"- Software Engineer at the Headquarters of the General Directorate in "Ouargla" Area..- Missionary to "Mnéa" in "Ghardaia" Area for the Project of 750 Housing .- Project Manager at "Hassi Messaoud" Area and Acting Area Manager for the construction of a Bunker ( Detonator and explosives deposits) for HESP client (halliburton subsidiary company).- Head of the Department Control and Monitoring.- Project Director Printing Newspapers: 35 local Dailies, Weeklies , and ...; in Bechar Area.- Project manager for 96 Studios (small flates F1) Renovations at the "Living Camp" HESP's client.- Area Manager Acting in "Ghardaia" : The Realization of a : "Detaining Center 500Lits" ( Men, Women and Childs) "Noumirate Area, Ghardaia".- Design and Creation of the New Logistics Service in the Existing Shed in HESP Direction, HMD Base . -
Civil Work Superintendent Mln Phase Iii Oued Etah "Berkine Region",Entrepose Spa Algérie / Conocophillips Jun 2010 - Aug 2012Oued Etah, Hassi Messaoud, " South-Est Algeria Area".Civil Works Superintendent ;- Ensure The Rafinery Expansion Works, MLN Phase IIIAnd Tunnel cables Rack.- Platforms Renovation (Oil Wells and Gas wells); a Number of Fourteen Wells "14wells", all Connected to the Refinery by Pipeline Lines ; MLC2 , MLC3 , MLC5 , MLC6 , KMD3 , KMD4 , KMW3 , KMW12 ... ; to know ;** Groups Tiles .** Massive Aerials .** Mountain Ranges Solar Panels.** Druns Pits.** Habrits Groups .** Supports Pipes. -
Civil Works SupervisorAlstom Power / Sonatrach " Dp/Bbk " Mar 2010 - Jun 2010Hassi Berkine (Bbk) - Hmd (Hassi Messaoud), "South-Est Aleria Area".Civil Works Supervisor; ALSTOM Power Services.Upstream Activity, Production Division, HMD Regional Department, Coordination Branch Champs Exterior, Power Plant Hassi Berkine (CBK) For the Project of High-technology Difinition Cameras Monitoring Worn on Mats of: 06M, 08M, 12M and 25M.The Berkine Power Plant and it's six (06) Armoured Positions it Feeds: 1-HBNS, 2-OURHOUD, 3-MLN, 4-BRN, 5-Gassi Touil, 6-TFT.And Mainly the Realization of a PCS : (Computer Control and Security) at the Entrance of the Power Plant.- - Supervise Sliced Devices Work Inside the Plant.- - The achievement of Bedrooms Pulling Cables.- - Cables Intrusion Works (Fencing).- - Consertinat Fixing Works.- - Tripod Fixation to Focus the Security Police Station.- - Anti-intrusion Cable Outside the Central Periphery.- - Rehabilitation of Places of Shuffle and Pose Gravion. -
Planner Engineer Project El-Merk "Region Hassi Messaoud" .Gcb Filiale Sonatrach May 2009 - Mar 2010El-Merk Hmd 400Km South Hassi Amaessaoud, "South-Est Algeria Area"Engineer Project Planner at El-Merk with Primavera Software Version 6.0;- - The ANADARKO Refinery Platform Construction. Subcontracting with PETROFAC.- - Sewage Water --Station.- - The Access Trails.- - The Subcontractors Camps.- - Daily Reports.- - Costomers Coordination.- - Supervision , Coordination ; Dispatching Plans and Planing for Formwork Workshops, Reinforcement, Concrete plant and Precast Elements .- - Inspections Preparation: Reinforcement, Formwork and Casting.- - The Customer Writing Invitations to Attend the Different Tasks of Work. -
Test Engineer In Both Of: Site And Laboratory.Cojaal / Ana (Agence Nationale Des Autoroutes). Dec 2007 - Feb 2009Camp1 Hachichia, Setif Area, "North-Est Algeria Area".Oversee both the shipyard and the Laboratory.• Ensure Good spots of Distributed Operations Laboratory and Construction.• Laboratory Equipment Handling and those on site; to know :• The Limits ATTERBERG (plasticity and liquidity).• Los Angeles and engrave materials.• Methylene Blue Test.• Standardized Test Proctor and Modified (Manual and Automatic).• Performance and Asphalt Mixing.• Tests on Quality Aggregates Asphalt Materials before the job or Concrete Mixes and Design.• Performance of the Concrete Design.• Test frequency on the production of asphalt and concrete production.• Tests of Hardening Concrete Fees Know "Slump test" (marasmus Teste), Compression Tests.• Perform Formula Mix Asphalt Jobs.• On site: Gamma Density Meter "Troxler".• Evaluation of the bearing capacity of the Soles of Earthworks, Excavation, Focus on the Bridges and Any Other Assisi by plate Static Test and Dynamic.• Reinforcement Receiving All Reinforced Concrete Structures: Piling, Soles and Wings of the scuppers, the Lower Tablecloths and Superiors Dalles, nozzles Books, ... Daily Reports.
Kamel K. Education Details
-
Abderahmane Mira University Of Bejaia / Ferhat Abbas University Of Sétif11.58 / 13.5
Frequently Asked Questions about Kamel K.
What is Kamel K.'s role at the current company?
Kamel K.'s current role is Chef de Projet Senior.
What schools did Kamel K. attend?
Kamel K. attended Abderahmane Mira University Of Bejaia / Ferhat Abbas University Of Sétif.
Not the Kamel K. you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial