Karthy Radhakrishnan Email and Phone Number
Professional Synopsis A dynamic professional with 21+ years of rich experience in Construction Supervision and Site Management. Demonstrative excellence in executing large scale Metro Rail projects and residential projects in India and abroad. Expertise in planning, executing and managing building & construction of high value projects involving planning, budgeting and resource administration, with a flair for adopting modern methodologies in compliance with the quality standards. Resourceful in supervising all construction activities including provisioning of technical inputs for methodologies of construction & coordinating with the site management activities while ensuring compliance for various construction activities as per the norms and regulations. Strong relationship management, communication skills with the ability to network with project members, architects / external agencies / consultants / clients / sub-contractors and other utility agencies with consummate ease. Excellent analytical, troubleshooting & inter-personal skills with skills in driving numerous quality enhancement, process improvement & cost savings initiatives during career span.Key Skills :Site Management
Parsons International
View- Employees:
- 968
-
Senior Structural Inspector (Tunnel)Parsons International Jul 2021 - PresentAbudhabi -
Civil Structural InspectorJacobs Dec 2020 - Jun 2021Abu Dhabi, United Arab EmiratesConsultant Supervision for Etihad Rail Project, Ruwais, Package 2AKey Deliverables Inspection and witnessed for Massive Earthwork, backfilling for main line embankment stretches, setoff tracks, Rig crossing and Level Crossing Structures, OBRS(Fly Over), UDP(Underpass), Drainage Culverts and service road works, Inspection and witnessing of test for Earthwork, Box out cutting, filling of embankment works such as Capillary break layer, Soil replacement, core, bank grade, sub grade… Show more Consultant Supervision for Etihad Rail Project, Ruwais, Package 2AKey Deliverables Inspection and witnessed for Massive Earthwork, backfilling for main line embankment stretches, setoff tracks, Rig crossing and Level Crossing Structures, OBRS(Fly Over), UDP(Underpass), Drainage Culverts and service road works, Inspection and witnessing of test for Earthwork, Box out cutting, filling of embankment works such as Capillary break layer, Soil replacement, core, bank grade, sub grade, sub ballast and ballast laying and compacting frequency test conducted with main contractor and complies with MS-ITP, Abu Dhabi specification and project specification requirements. Compaction works such as FDT, (NDT or Sand replacement method, CBR, PLT, CPT, Zone test and Rapid dynamic Compaction testing works conducting with 3rd party and JV Structures such as Over bridge, Under bridge camel pass, Utility drainage Culvert, roads Etc., Bridge works, Sub-structure such as concrete piles, piers and cast-in-situ pier caps and duct slabs in super structures Inspection for Sand mitigation, berm, ditch and water course, Camel fence along the stretches, Inspection and witness for Shelter and substation, enabling duct works and Utility works laying and testing works etc, Show less -
Construction Site ManagerJuhno Construction Tiruchirappali Sep 2018 - Nov 2020Tiruchirappali
-
Construction Site ManagerJuhno Construction Tiruchirappali Sep 2018 - Oct 2020Tiruchirappali
-
Civil Structural EngineerHill International, Inc. Jul 2014 - Sep 2018Doha Metro Green Line Phase-1 ProjectCivil Engineer Underground Station and tunnelsProjects Undertaken Project Management Consultant for green line metro rail project phase-1Responsible for Underground Station Box Excavation works, Slope Protection works, Ground anchors temporary and permanent, Muck Conveyor removal process, Formation preparation, Earthing works testing and witnessing, Blinding, waterproofing work external structures, backfilling works with FDT test, Dewatering process and monitoring, Settlement… Show more Civil Engineer Underground Station and tunnelsProjects Undertaken Project Management Consultant for green line metro rail project phase-1Responsible for Underground Station Box Excavation works, Slope Protection works, Ground anchors temporary and permanent, Muck Conveyor removal process, Formation preparation, Earthing works testing and witnessing, Blinding, waterproofing work external structures, backfilling works with FDT test, Dewatering process and monitoring, Settlement monitoring process, Cast-in-situ of massive foundation slab, external walls, roof of intermediate transversal, concourse levels, Shield cradle cast, Headwall construction, TBM setup process, assembly and launching breakthrough, temporary bridges at the intersection, NATM Underpass Entrance pod, and other civil works, block works plasters, Architectural Finishing fit-outs internal and external cladding ceiling, paintings tiling, and others, Steel structure shelter erection works, , bolting and tightening, welding, testing and fire proof painting works Show less
-
Civil Engineer (Team Leader Civil & Archi Works)Serco Duabai Metro Apr 2011 - Jun 2014Dubai, UaeEngineering Maintenance for Dubai Metro structures, Underground tunnels, Stations, Elevated viaduct, Stations, Annexure, MPS, TPS, Sub station and Depots Building and Facilities. Conduct Preventive and Corrective, Periodic Maintenance works with leading and guiding the technicians and Inspectors for line side and Non-Line side activities during operational and Engineering hours with scheduled task in restricted hours
-
Structural InspectorParsons International Co. Jan 2007 - Mar 2011Dubai Metro ProjectProjects Undertaken Construction of World’s Largest Automated Metro Rail Project in Dubai: This involved construction of viaduct substructures, superstructure, under ground stations; over ground station as well as foot-over bridge works. And the value of the Contract 30 billion AED.Key Deliverables Inspection of materials used in the Construction of Dubai Metro Project i.e. Underground Station Concreting, bentonite/polymer, form works, steel structures, architectural… Show more Projects Undertaken Construction of World’s Largest Automated Metro Rail Project in Dubai: This involved construction of viaduct substructures, superstructure, under ground stations; over ground station as well as foot-over bridge works. And the value of the Contract 30 billion AED.Key Deliverables Inspection of materials used in the Construction of Dubai Metro Project i.e. Underground Station Concreting, bentonite/polymer, form works, steel structures, architectural materials, viaduct substructures, entrance pod steel structures, external envelope roof materials, Internal cladding flooring and ceiling materials, etc. Supervision and inspection at site for civil work such as, working platform inspection, polymer or bentonite checking, boring or drilling works sounding and verticality, pre-concrete and concreting activities for diaphragm walls and bored piles. Conduct inspection of surface preparation prior to water proofing, water proofing application of pile cap, ground slab, and water tank. Witness and review testing of diaphragm wall and bored pile such as sonic logging test, pile integrity test, for backfilling such as field density test, plate load test. Supervision and inspection at site for station civil work such as, Guide walls, diaphragm walls, piling, pile head treatment, pile cap, Pier columns, ground beams, ground slab, columns, beams, roof slab and lift walls, etc., Check erection of structural steel members such as vertical columns, horizontal beams, cantilever beams, staircase steel structures, lift steel structures, roof steel structures and cross bracings in accordance to approved shop drawing and method of statement. Supervision and inspection at site for station architectural work such as, block works, plastering, cement flooring, stone laying, tiling, painting, Internal wall cladding, false ceiling, external glass cladding, external roof works, etc. Show less
-
Site Civil EngineerScg Contracts India Ltd Oct 2005 - Nov 2006Moradabad Area, India, New DelhiSite EngineerProjects Undertaken Construction of Multiplex Cinema and Shopping Mall at Moradabad UP India Key Deliverables Supervising construction activities for the scheduled works as well as monitoring their progress. Preparing weekly subcontractor bills. Undertaking quantity surveying as well as providing quality control assistance. Coordinating with system wide Sub Contractors at every stage. Preparing daily progress reports and… Show more Site EngineerProjects Undertaken Construction of Multiplex Cinema and Shopping Mall at Moradabad UP India Key Deliverables Supervising construction activities for the scheduled works as well as monitoring their progress. Preparing weekly subcontractor bills. Undertaking quantity surveying as well as providing quality control assistance. Coordinating with system wide Sub Contractors at every stage. Preparing daily progress reports and updates. Monitoring on site, avoiding wastages of material and manpower at site. Show less
-
Junior Civil EngineerSimplex Infrastructures Limited Dec 2003 - Sep 2005BangaloreProjects Undertaken Construction of Industrial Building and Fly Over Projects for ISRO and BMTCKey Deliverables Handling piling, pile cap, pier columns pier cap installation works, rebar, strutting, concrete, ground slab, roof slab, backfill works, etc. Perform site inspection with consultants at every stage of execution. Execution of civil works according to shop drawings and specifications. Measurement book preparation for sub contractor. -
Site SupervisorLarsons & Toubro Nov 2002 - Dec 2003Delhi MetroProjects Undertaken Construction of Delhi Metro projects New Delhi in India; Key Deliverables Assisting with sub-contractors for Civil structural works execution and supervision such as diaphragm walls, barrete piles deep excavation, station box, raft slab casting and surveying works for Underground stations of Delhi metro project at Chandini chowk station
Karthy Radhakrishnan Education Details
-
State Board Of Technical Education, Chennai Tamilnadu, IndiaDiploma In Civil Engineering (First Class) -
Bishop Heber Higher Secoundar SchoolGeneral Machinist Basic Engineering -
Jrvd UniversityA -
Jrvd UniversityA
Frequently Asked Questions about Karthy Radhakrishnan
What company does Karthy Radhakrishnan work for?
Karthy Radhakrishnan works for Parsons International
What is Karthy Radhakrishnan's role at the current company?
Karthy Radhakrishnan's current role is Supervision consultant/PMC for Railway Civil Engineering works, metro light rail, freight rail, viaduct, tunnels, stations, Roads and Infrastructures projects.
What schools did Karthy Radhakrishnan attend?
Karthy Radhakrishnan attended State Board Of Technical Education, Chennai Tamilnadu, India, Bishop Heber Higher Secoundar School, Jrvd University, Jrvd University.
Not the Karthy Radhakrishnan you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial