Who is Keith Callow? Overview
A concise factual answer block for searchers comparing this professional profile.
Keith Callow is listed as Director at Enginuite, based in Greater Melbourne Area, Australia. AeroLeads shows a work email signal at balfourbeatty.com and a matched LinkedIn profile for Keith Callow.
Keith Callow previously worked as Senior Project Manager at Rail Projects Victoria and Senior Construction Manager at Fulton Hogan. Keith Callow holds Bachelor Of Engineering (B.Eng.), Civil Engineering from Rmit University.
Email format at Enginuite
This section adds company-level context without repeating Keith Callow's masked contact details.
AeroLeads found 1 current-domain work email signal for Keith Callow. Compare company email patterns before reaching out.
About Keith Callow
Accomplished Project Director with 20 years of experience in the civil engineering industry within the roads, rail and water sectors. Proven record of successful end to end project delivery on high profile, complex infrastructure projects across Australia. A passionate leader with years of experience fostering high performing teams and workplaces. A unique skillset obtained working with both clients and contactors and an appreciation of the expectations and drivers of both.
Listed skills include Civil Infrustructure/Earthworks, Civil Engineering, Earthworks, Road, and 18 others.
Keith Callow's current company
Company context helps verify the profile and gives searchers a useful next step.
Keith Callow work experience
A career timeline built from the work history available for this profile.
Senior Project Manager
Managed projects in development which include the Warrnambool Line Upgrade and Geelong Line Upgrades stage 2 & 3. Both projects require extensive stakeholder engagement, negotiations with State and Federal governments and agreement on project requirements with V Line.Warrnambool Line Upgrade - $260mThe Warrnambool Line Upgrade consists of rail and signaling upgrades to level crossing and end of line stabling required to deploy VLocity rollingstock on the line.Geelong Line Upgrade Stages 2 & 3 - $2bThe Geelong Line Upgrade is a staged improvement approach duplicating the existing single-track line between Geelong and Waurn Ponds. Stage 2 involves two station upgrades, 3 grades separations, viaduct structure through the Barwon River floodplain and signaling upgrades between Waurn Ponds & South Geelong. Stage 3 requires track and existing structures duplication with signal upgrades but also the construction of 1km of twin tunnels between Geelong and South Geelong Stations.
Senior Construction Manager
The Princess to Western M80 upgrade was a highway widening project constructed under a live traffic environment to increase lane capacity in each direction on one of Melbourne’s most conjected highways. This included the widening and strengthening of existing bridges and barriers, drainage and pavements widenings, including extensive retaining walls and integration of an ITS system into the existing network. During the tender, I was the Delivery Manager responsible for all direct and functional team reports including managing a large design team. Negotiations of this project to award were complex due to the WGT & OSAR interface at the Princess Hwy interchange and also due to Lend Lease withdrawing once nominated as 1 of 2 proponents. We successfully addressed the clients concerns and mobilized to site after undertaking the tender and design packages.
Senior Project Manager
The North East Program Alliance consisted of two grade separations at Lower Plenty Road, Rosanna (inclusive of station rebuild) and Grange Road, Alphington whilst also duplicating single track between Heidelberg and Rosanna stations.The project was split into the 3 areas mentioned above with a dedicated project team at each site.During the ToC phase, I was responsible for 2 out of the 3 locations with a combined responsibility of $260m. Upon finalizing negotiations for contract award, I led both areas through project mobilization, to then focus on the Lower Plenty Road Grade Separation and Rosanna Station build.
Area Manager
The CityLink Tulla Widening (CTW) Project added additional lanes, boosting capacity by up to 30%. The project delivered the works between Bulla Road and Power Street and was completed in 2018. I was predominately responsible for managing the section of the project between the Flemington/Mt Alexander Road Intersection through to Brunswick Road Interchange.The majority of the works were undertaken in a very challenging environment within the concrete viaduct of the Moonee Ponds Creek and catchment areas during winter which were subject to regular flooding and also at night and weekends during regular shut downs to minimize disruption to the travelling public.
Senior Project Manager
During my time at VicRoads Metro Western Projects & M80 Projects I was responsible for reworking and refreshing multiple business cases focusing on ensuring the full scope was captured, creating cost estimates, detail programming and generation of project specifications. I was also responsible for the detailed construction and cost plans for the three remaining M80 sections (Princess to Western, Sydney to Edgars and Plenty to Greensborough) and constructability and estimate reviews on O’Herns Road, Doherty’s Road & Plenty Road. I assisted on preconstruction activities for West Gate Distributor and Chandler Hwy which were about to go to market.
Civil Manager
During my time at Balfour Beatty Australia I was involved in the Sydney Light Rail Tender which was a PPP and JV with our construction partner McConnell Dowell. On completion of the tender my role involved investigating various potential grade separations on the Melbourne Metro Rail network earmarked for release to the construction market sometime later this year.
Area Manager
Considered a critical component of Melbourne’s rail network, the Regional Rail Link separated regional trains from metropolitan trains for the first-time giving Geelong, Bendigo and Ballarat trains their own dedicated tracks - increasing capacity and reliability. The Footscray to Deer Park Alliance involved seven organizations, multiple complex stakeholders and constant ministerial involvement. The project delivered: 7.5 km of new regional track and associated new rail bridges; two road / rail grade separations at level crossings; one new station, and three station upgrades together with construction of train control systems for the metropolitan lines and improvements to level crossings. The Alliance achieved all Project milestones.On this project I was responsible for the 1B Section (Downside of Footscray Station to Downside of West Footscray Station).
Construction Manager (Civil )
The Seaford Rail Extension Project involved a 5 km extension of the rail alignment from Noarlunga to Seaford. The project comprised of bulk earthworks of 750,000 BCM, 2 new stations, local road grade separations, a 1.3 km incremental launch bridge across the tidal flood plain, extensive lime stabilized fills, over 1 km of soil nail and shotcrete on both sides of a large cut and 5 km of rail formation and associated infrastructure.As Civil Construction Manager I was responsible for the delivery of bulk earthworks/fills, Station Car Parks, Retaining Walls/Soil Nails & Shotcrete, Local Roads, Lime Stabilised Rail Formation, Rail Formation, Service Relocations and Drainage.
Project Manager
During my time at John Holland I had the opportunity to work on a range of large complex multi discipline projects.These included -Sugar Loaf PipelineSpringvale Road Grade Separation Project (Road & Rail)Western Highway Realignment (Anthony's Cutting)GASP Rail
Senior Project Engineer
While working for McConnell Dowell in Brisbane I worked on SRWP & NPI which delivered 2 major sections of large diameter water pipelines and associated infrastructure to draught proof south east Queensland. These projects with large diameter GRP & MSCL (1450mm & 1290mm) delivered over 200 km of pipeline through challenging terrain.My role involved the delivery of structures (bridges/pump stations) complex water crossings & crane lifts, large diameter dig/lay/bury and associated earthworks.
Senior Project Engineer
After completing the VicRoads Graduate Program, I worked across several regions delivery capital works road & road infrastructure programs and also involved in several Major Projects.These include -South West Region - Geelong, Road Improvement ProjectsMetro South West - Sunshine, Road Improvement ProjectsCraigieburn Bypass Project Northern Region - Bendigo, Bid Proposal & PlanningCalder Highway Upgrade - Kyneton, Delivery
Keith Callow education
Bachelor Of Engineering (B.Eng.), Civil Engineering
Education record
Frequently asked questions about Keith Callow
Quick answers generated from the profile data available on this page.
What company does Keith Callow work for?
Keith Callow works for Enginuite.
What is Keith Callow's role at Enginuite?
Keith Callow is listed as Director at Enginuite.
What is Keith Callow's email address?
AeroLeads has found 1 work email signal at @balfourbeatty.com for Keith Callow at Enginuite.
Where is Keith Callow based?
Keith Callow is based in Greater Melbourne Area, Australia while working with Enginuite.
What companies has Keith Callow worked for?
Keith Callow has worked for Enginuite, Rail Projects Victoria, Fulton Hogan, Cpb Contractors, and Vicroads.
How can I contact Keith Callow?
You can use AeroLeads to view verified contact signals for Keith Callow at Enginuite, including work email, phone, and LinkedIn data when available.
What schools did Keith Callow attend?
Keith Callow holds Bachelor Of Engineering (B.Eng.), Civil Engineering from Rmit University.
What skills is Keith Callow known for?
Keith Callow is listed with skills including Civil Infrustructure/Earthworks, Civil Engineering, Earthworks, Road, Drainage, Rail, Piling, and Earth Retaining Structures.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Keith Callow you were looking for.
View similar profiles