Project Engineer
CurrentThe project is located at Bukit batok nature park and the job scope for the project is Soil Nail installation and grid beam works. It is a slope stabilization works to prevent soil erosion. The Slope movement were monitored with settlement markers, water standpipe, Inclinometer and prisms which had been installed on site and weekly reading were taken and.