Ken Su

Ken Su Email and Phone Number

Rel-TEE at Apple Inc @ Apple
cupertino, california, united states
Ken Su's Location
Shanghai, China, China
About Ken Su

1. For team management: at least 8 years ‘experience for team management, lead test team to finish KPI for NPI and mass production phage2. For project management: at leat 4 years' experience for project management, lead team mumber to finish new project(200+) from NPI(EVT->DVT->PVT) to MP 3. For professional skill: more than 14 years of work experience for FCT/ICT/ Rel test and analysis on EMS Company. Meanwhile lead TE team to set up FCT& ICT fixture (Including program &burn-in &Hi-pot, etc.) and build >200 testing automation projects successful. 4. For instrument and equipment: being able to use the kind of tooling, such as Multimeter, oscilloscope, AVI, ICT hp3070, TR518, etc.…...5. For SMT process: Being familiar with the manufacture process of PCBA and the testing process.6. For test software: Being able to use the software of Jabil test/ Teststand/Labview Minitab/CAD and ProE /C language/VBA/office/Matlab/Python/Tableau. 7. For Languages: Being good at reading the document of English and communicating with customer by the email of English. The oral English is general.

Ken Su's Current Company Details
Apple

Apple

View
Rel-TEE at Apple Inc
cupertino, california, united states
Website:
apple.com
Employees:
218112
Ken Su Work Experience Details
  • Apple
    Rel-Tee
    Apple Feb 2022 - Present
    Shanghai, China
    1. For region(each Site): Mainly take charge of Asia where includes China/Korea/Vietnam/India. Leading CM vendor to set up Rel lab (FVT/ICT tester/chamber room).2.For NPI(Dev-P1-DB-P2-EVT-DVT): mainly take charge of MPO/TSP/PMT/DTR/DTXT/Ophs tester bring up from 0 to 1, meanwhile make sure these testers to be ok2test for every build to meet Rel input plan. --Buyoff fixture (GRR data report analysis and review)--CPK data collection to check whether test spec is reasonable or not?--Troubleshooting for Tester NG 3. For GH system: Co-work with GH team and CM vendor to create REL GH station, make sure GH station to work normally, meanwhile upload overlay to REL GH station.4. For Insight system: Co-work with insight team to make sure that the testing data can be uploaded to insight system, make sure Cpto Rel team can check and get the testing data from insight system.5. For onsite support: Co-work with PPO team/CM vendor/ tester vendor to solve the testing issue quickly for each build, so that tester is smooth to be set up.--Business travel for each build to make sure FVT tester to be ok2test for meeting Rel input. --Cross function team to communicate for solving test issue. --Summarize lesson learn for delaying form each build, and provide improvement in the future.6. For Tableau system: requiring CM vendor to provide the related data to upload to tableau system, so that Cpto REL team can review the current REL status.7. For failure data analysis: checking test log and data to do analysis base on the kind of validation, meanwhile work with the function team (EE & PPO) to update test spec, and send the latest spec to CM vendor for using.
  • Flex
    Test Expert
    Flex Apr 2021 - Feb 2022
    Jiangsu, China
    Testing expert
  • Mflex
    Assistant Test Manager
    Mflex Aug 2020 - Apr 2021
    Suzhou, Jiangsu, China
    1. For management, at least 8 years ‘experience for management, lead test team to finish KPI for NPI and mass production. 2. For project management, base on customer requirement date to list test plan and schedule for set up test system and test fixture, meanwhile provide LT to customer for customer's requirement2. For RFQ phage, lead test team to finish automatic test solution for ICT and FCT, meanwhile provide quotation and DFT report3. For NPI phage, lead NPI engineer to communicate with customer for resolving test bug-- Provide Test solution to build ICT &FCT base on test spec -- Give out feedback and suggestion for how to improve test coverage after communicating customer-- Provide Poka-Yoke method for testing -- Provide test plan for setup ICT and FCT fixture -- List schedule for how to meet shipment on NPI phage 4. For MP phage, lead engineer to optimize test FPY and cycle time-- Training engineer and technician for test principle -- Provide WI for how to operate tester -- Training technician for how to maintain test fixture and troubleshoot testing-- Effective communication and cross functional collaboration -- Provide calibration plan for test instrument and equipment 5. To take charge of recruiting work for TE, and optimize engineer for assignment work6. Study informatization and automation for test system, and expect testing intelligence development in the future. study test method to saving fixture cost and manpower cost.Report Directly to: Test engineering managerNumber of Subordinate: 30
  • Hana Semiconductor (Ayutthaya) Co.,Ltd.
    Test Supervsior
    Hana Semiconductor (Ayutthaya) Co.,Ltd. Dec 2017 - Aug 2020
    Jiaxing, Zhejiang, China
    RF - Analog - Digital Testing (PCBA / Box Build)1. For management, at least 8 years ’experience for management, lead test team to finish KPI for NPI and mass production. 2. For RFQ step, assisting BU to finish ICT&FCT fixture's quotation for RFQ and NPI stage, and providing low cost solution for FCT and FVT test--According to customer's test spec & Gerber file & schematic to provide test solution and test proposal for FVT and ICT fixture on NPI step, and ICT DFT report. Meanwhile preparing testing plans to meet test schedule. 3. For NPI step, TE will work with customer(global) and third –part supplier (local) to solve test issue, meanwhile to finish hardware and test system.--Leading TT to set up fixture of ICT&FCT on NPI step, Meanwhile for FVT& ICT fixture to do GRR and buyoff 4. For mass production step, to maintain and diagnose FVT& ICT when fixture cannot work. dealing with issue of test on mass production step, reducing downtime, improving FPY--Monitoring PM of test fixture and spare part & FPY & downtime& OTD & test issue &WIP from every engineer--Taking charge of dealing with issue of production, tracking progress of production, meanwhile communicating with customer and supplier to finish test fixture and test system (FVT &ICT &Program &burn-in &Hi-pot). So that the production line is running smoothly from NPI to mass production.--Taking charge of test of mass production, improving and optimizing tests for FVT&ICT, meanwhile training TT for maintenance and test works5. For test software, being able to use Minitab/CAD and ProE& C language& Labview &Jabil test & Teststand,etc.......6. For RMA board returned from customer, lead RMA team to repair failure board, finding root cause, giving FA report.7. For ECN from customer, which will be implemented and controlled by usReport Directly to: Test engineering managerNumber of Subordinate: 12
  • Jabil
    Senior Test Engineer
    Jabil Jun 2010 - Dec 2017
    Guangzhou, Guangdong, China
    1. For cost saving from RFQ: Assisting BU to finish ICT&FCT fixture's quotation for RFQ and NPI stage, and providing low cost solution for ICT and FCT test.2. For test solution: according to customer’s test spec to provide test solution and test proposal for FVT and ICT fixture, preparing testing plans to meet NPI schedule.3. For quality control: based on test spec and Gerber file to provide DFT report, so that improve test coverage.4. For NPI phase: to deal with issue of production, tracking progress of production, meanwhile communicating with customer and supplier to finish test fixture and test system (FVT &ICT &Program &burn-in &Hi-pot). Meanwhile for test fixture to be buyoff with GRR, so that the production line is running smoothly from NPI to mass production.5. For MP phase: improving FPY , reducing downtime, optimizing cycle time, control WIP for fail PCBA , focus OTD fail,--Training TT how to troubleshoot for ICT and FVT--Monitoring and management spare part--Cross function to communicate with other department6. For RMA board customer returned: lead RMA team to repair failure board, finding root cause, giving FA report.7. For ECN from customer: which will be implemented and controlled by system8. For test software: being able to use Jabil test, Minitab/CAD and ProE& C language& Labview.Report Directly to: Test engineering managerNumber of Subordinate: 15
  • Quanta Computer Inc. 廣達電腦
    Electronics Engineer
    Quanta Computer Inc. 廣達電腦 Oct 2007 - Jun 2010
    Shanghai City, China
    1. For NPI: Taking charge of trial-produce of new products and testing status, work with RD to resolve issue of production together2. For MP: Improving FPY, meantime, analysis test issue and process issue to find the root cause for resolving this issue that avoid this issue happening once again.-- cycle time tested, provide SOP, Layout test line-- based on customer’s forecast to estimate capacity of tester3. For failure analysis: based on schematic to analysis and repair failure board.4. For quality control: Taking charge of tracking and setting up goal of quality, meantime, taking charge of quality issue of production, push supplier to give improvement plan for this quality issue5. For SMT process: Being familiar with flow chart of SMT and F/T (function testing).Subordinates:9people|Reporting:Technical engineering manager
  • Compal
    Assistant Electronics Engineer
    Compal Oct 2005 - Oct 2007
    Suzhou, Jiangsu, China
    Industry: Electronics/Semiconductor/IC Engineering project Assistant electronics Engineer 1. For failure board analysis: Mainly analyzing the circuit《Understanding of analog, digital and microprocessor circuits.》 and repaired PCBA2. For tools and instrument used: Being able to use tools of all kinds for repairing failure board3. For SMT process: Being familiar with flow chart of SMT and F/T (function testing).4. Reliability Study, Failure Tree Analysis, Safety Hazard Analysis

Ken Su Education Details

Frequently Asked Questions about Ken Su

What company does Ken Su work for?

Ken Su works for Apple

What is Ken Su's role at the current company?

Ken Su's current role is Rel-TEE at Apple Inc.

What schools did Ken Su attend?

Ken Su attended Soochow University (Cn).

Who are Ken Su's colleagues?

Ken Su's colleagues are Guy Kushtai, Ahmed. R, Vikas Gujar, Steffi Jose, Phraephan Thupjan, Krishna Vishwanathan, Jagdish Suthar Suthar.

Not the Ken Su you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.