Production Manager / Plant Engineer
Constellation Operating Company
Panther Creek Energy Facility, Nesquehoning, Pa
Plant Engineer 1998 – 1999Coordinated engineering activities of an 80 MW net culm fired CFB facility. • Assumed direct supervision of the Plant Water Technician and Engineering Technician. Managed outage planning and scheduling, performance testing, thermography, zero discharge, water treatment, plant documentation, and management of special projects.• Assigned as the Transition Coordinator (summer 1998) to facilitate the transition of the East Syracuse Generating Station {80 MW CCCT (2- LM6000)} facility from US Generating Company to Orion Power that resulted in a smooth transition of Orion’s 1st acquisition. Production Manager 1991 – 1997Managed 25 Plant Technicians and acted as back up to the Plant Manager. Tracked and reported plant production information. Intimately involved with the start-up and commissioning of the facility, which included initial hiring of department personnel, development of operating procedures, initial training, system check-outs / start-ups, and working closely with turnkey contractor (Bechtel).