Kevin Morya Email and Phone Number
Kevin Morya work email
- Valid
- Valid
Kevin Morya personal email
Total 23 years, including 15.5 years in Oil&Gas engineering design, and several years in plant troubleshooting & Operational Risk Asessment (ORM)- Lead/Senior process engineer for major projects such as gas-oil separation plant, major tie-in for degassing stations, oil terminal improvement, offshore wellhead platform, onshore oil field development ,and water treatment plant modification.- Experienced in Hydraulic calculation, equipment sizing (separators, sumps, pumps, vents, tanks, stabilizers, flares etc.), H&MB, relief system study, dispersion & radiation, hazardous area classification- Proficient in simulation softwares such as HYSYS-steady state/dynamic, UNISIM, PIPESIM, FLARENET, FLARESIM, PHAST, SHELLFRED, TLNET, HTRI, PIPENET-steady sate/sprinkler/transient, and OLGA. - Officially trained HTFS, PROMAX, and short course for FPSO.- Conversant with Shell DEP, TOTAL GS, API, Saudi Armaco, ADNOC, NFPA. IP15, Exxon GP- Participated in Design review, HAZOP, HAZID, SIL review, 3D model review, ALARP, Safety Critical Element review, constructability review and PEER review.- Estimated process man-hour of projects for bid proposal- Mentoring graduate process engineers and young engineers - Experienced as Technical Authority for approval of engineering deliverables - Experienced in Operational Risk Assessment (ORM)
Black Cat Engineering & Construction W.L.L
View- Website:
- blackcat.com.qa
- Employees:
- 673
-
Senior Process EngineerBlack Cat Engineering & Construction W.L.LDoha, Qa -
Senior Process EngineerTechnip Energies Mar 2022 - PresentDoha, QatarProcess / safety engineering projects:1. FEED for PWM B location (Client : NOC)2. FEED / EPIC for Common Cooling Water Project (Client :QatarEnergy)3. Water Injection Pig CD line modification (Client : NOC)4. Engineering service for detailed technological risk assessment (Client : NOC) -
ConsultantDupont Sustainable Solutions Mar 2021 - Mar 2022Bangkok, Bangkok City, ThailandConsultation for industrial safety management and Operational Risk Asessment (ORM) and Asset Integrity Management (AIM) -
ConsultantConsultants Of Technology Co., Ltd Jan 2021 - Feb 2021Bangkok, Bangkok City, Thailand1. Assessed the Project - "The application of Energy Solution Company (ESCO) in Thai governmental buildings” funded by Energy Conservation and Promotion Fund Office Responsibilities:2. Reviewed previous progress reports and TOR – Progress tracking of north-eastern hi-speed train in Thailand (Bangkok – Nakorn Ratchasima route) in 2021
-
Senior Process EngineerChina Petroleum Engineering & Construction Corporation (Cpecc) Jul 2019 - May 2020Dubai, United Arab Emirates1. Participated in the endorsement of EPC tender documents of KM500 project & Mirshift Qurainat New Trains projects2. Participated in Yemen pipeline projects : Surge studies using Olga software, relief studies, Operating Manual, pigging philosophy, Pre-commissioning & Commissioning3. Participated in HOTS2 projects : Pre-commissioning/Commissioning manual, Cause & Effect diagrams, Operating Manual, Alarm & Trip setting4. Qatar Petroleum - new production separators : As-built P&IDs 5. EPC for BAB Integrated Facilities Project (BIFP) - Additional 17 wells : H&MB, process simulation, steady state studies using Pipesim software and transient studies using Olga software6. EPC for BAB 485 MBD Sustainable Facilities : H&MB, Process simulation, blowdown studies of remote dewatering station and BAB central dewatering station, flare network study of remore dewatering station, sizing flare knockout drum and pumps, BFD, PFD & UFD, inputs to instrument datasheets and study reports -
Senior Process EngineerWorley Dec 2018 - Jun 2019Abu Dhabi, United Arab Emirates1. Metering system on Das Island (ADNOC Offshore)The Zakum, Umm shief, Banduq plant on Das artificail Island receive reservoir fluid from Zakum West Super Complex (ZWSC) and Zakum Central Super Complex (ZCSC). It was required to install new flow meters on the strategic locations of plants on Das Island for better plant monitoring. ADNOC offshore is the client2. Emergency Diesel Generator replacement on Zirku IslandEmergency Diesel Generator (EDG) is the backup units for Gas Turbine Power Generators for the processed plants on Zirku Island. The scope includes installation of 4 EDGs and connection with existing utility systems. ADNOC offshore is the client3. Long Term Development Plant Phase 1 Lower Zakum field requires the two new artificial island to cater for the drilling centers, processing center & dewatering and expansion of facilities on Das Island. Four reservoirs at the peak year of 2028 produced well fluid to these artificial islands. The project is in the SELECT phase which will determine the most feasible option for the next CONCEPT phase. My responsibility is to check the basis of subsurface design, Hysys simulation files of well models and issue request for information. ADNOC offshore is the client4. LP Flare header replacementLP flare header of Gas Processing Platform (GPF) of Zakum West Super Complex (ZWSC) requires the new route of LP flare with minimum elblows and other fittings to avoid blockage by heavy hydrocarbons. The scope includes the ping option study and pressure drop calculation with objective to finalize the optimum route of piping. ADNOC offshore is the client5. Heat Exchanger Thermal Rating Heat exchangers, 3 nos, in a Zakum West Super Complex require the upgrade of material of contruction to prolong their service. The scope includes the use of HTRI to confirm the performance of exchangers with respect to the new internal materials. ADNOC offshore is the client -
Senior Process EngineerKentz - Member Of The Snc Lavalin Group Jun 2015 - Nov 2018United Arab Emirates1. New Gas-Oil Separation Plant (GOSP) in Abu Ali and modification scope in Khursaniyah (Owner is Saudi Aramco) The project is the Front End Engineering Design (FEED) to cater for the expansion of 250 MBCD of crude oil from Berri field. The scope of new Gas Oil Separation Plant (GOSP) at Abu Ali includes the installation of High Pressure Production Trap (HPPT) and low pressure degassing tank, crude charge pump and crude stabilizer, dehydrator/desalter and gas dehydration and dew point control. 2. Major tie-in for three degassing stations (Owner is Exxon Mobile Iraq)The project is the residual Front End Engineering Design (FEED) and detail design to provide the pipe system to connect the new dehydrator/desalter, crude storage tanks, booster pumps, shipping pumps, wet/dry crude separators. -
Senior Process EngineerPetrokon Utama Sdn Bhd Jan 2011 - Jun 2015Brunei Darussalam1. Muara Terminal Loading Gantry ProjectThis project is the engineering design for the installation of new loading gantry and new loading pumps (for gasoline, diesel, jet oil, MTBE etc ) at Muara oil terminal (Owner is Brunei Shell Marketing). 2. Maharaja Lela South MLJ-3 Wellhead Platform This project is the conceptual design of wellhead platforms to cater 8 wells which comprise 10K API wells and 15K API wells. The platform produces at 6 MMSm3/d gas with associated liquid. The well fluid is transferred via 85 km subsea pipeline from the MLJ3 platform to Onshore Production Plant (OPP) (Owner is Total E&P Borneo, Brunei). 3. Well tie-in projects (Owner is Brunei Shell Petroleum). -
Process EngineerWorleyparsons Mar 2007 - Jan 2011Sultanate Of Oman1. Al-Khlata Infield Development-Phase II The scope of the project – Installation of 15 Multi-Selector Port valves, 9 Multi-Phase Flow Meters, 3, 10"x1.7 km GRE pipelines and three drain pits. All new facilities are located in Al-khlata oil field.2. Marmul Water Treatment Plant Phase B The scope of the project – Installation of 3 Induced Gas Floatation units, 1 nutshell filter, 2 booster pumps, 1 Water Injection and piping modification inside the battery limits of Water Treatment Plant. After the project finish, the production capacity of the plant will be 128,000 m3/d treated water.3. Budour North East to Birba Pipeline (Early Development Facilities from Budour NE) & Remote Manifold StationThe scope of the project – Installation of two remote manifolds to gather well fluid from Bud NE oil field, multi-phase flow meter, vent and drain facilities and 21 km 10”pipelines and replacement of existing 4 nos of 6”x 2 km CS flowlines from the Budour North East oil field with GRE flowlines. -
Process EngineerThai Nippon Steel Engg & Construction Jan 2005 - Feb 2007ThailandVarious engineering works were done for 6 offshore wellhead platforms of Bongkot fields (3E,3F projects)Provide engineering deliverables including process flow scheme, P&ID, SAFE chart, ESD diagram, hazardous area classification, operating pholosophy, control & safeguarding narrative, hydraulic calculation, process simualtions (HYSYS, FLARENET, FLARESIM), equipment & instrument sizing, equipment design conditions, process design criteria, plant operating manual. -
SpecialistTpt Utility Co., Ltd. Mar 2003 - Dec 2004ThailandMonitor input/output of plant operation, liason with consultants, vendors and contrators, follow up QC activities, execute conceptual design, provide solution to daily plant troubleshootings, coordinate with other disciplines and top management, prepare proposals to improve the production. Major project comprised- Installation of HP heater- By Product 3 Staged Screw Conveyors Installation- Cooling Tower Fill and Demister Replacement
-
Energy EngineerConsultants Of Technology Co., Ltd Apr 2001 - Feb 2003ThailandAssessment of renewable/energy saving project. Major project comprised- Assessment of Energy Conservation Plan 2001-2004" funded by National Energy Policy Office (NEPO)- Feasibility of Use of Palm Oil Residue for Small Scale Power Production” funded by Department of Energy Development and Promotion (DEDP)- Market Cum Feasibility Study of Solar Water Heater in Thailand" funded by Danish Cooperation for Environment and Development (DANCED)
-
Energy EngineerExcellent Energy International Co., Ltd. Dec 2000 - Mar 2001Bangkok City, ThailandPerform a study of potential use of ozone for cooling tower efficiency enhancement and corresponding measurement and verification (M & V) at SCB Park Plaza.
-
Research AssociateAsian Institute Of Technology Oct 1998 - Dec 2000Pathum Thani, Thailand- A study of heat gain through windows using a numerical methods and visual basic programming tool- Coordinate a project related to education tools for energy conservation
Kevin Morya Skills
Kevin Morya Education Details
-
Energy Management And Systems Technology -
Electrical Engineering Technologies/Technicians -
Mechanical Engineering Related Technologies/Technicians -
Chemical Technology (Major In Chemical Engineering)
Frequently Asked Questions about Kevin Morya
What company does Kevin Morya work for?
Kevin Morya works for Black Cat Engineering & Construction W.l.l
What is Kevin Morya's role at the current company?
Kevin Morya's current role is Senior Process Engineer.
What is Kevin Morya's email address?
Kevin Morya's email address is ke****@****ntz.com
What schools did Kevin Morya attend?
Kevin Morya attended Asian Institute Of Technology, Mahidol University, Kasetsart University, Chulalongkorn University.
What skills is Kevin Morya known for?
Kevin Morya has skills like Process Engineering, P&id, Aspen Hysys, Epc, Factory, Commissioning, Piping, Pumps, Equipment Sizing, Engineering, Oil And Gas, Feed.
Who are Kevin Morya's colleagues?
Kevin Morya's colleagues are Jerry Francis, Gouthamendra Awari, Vijay Nath, Ramnarayanan Pmp®, Teby Terance, Takieddine Bousmina, Eufracio Cabanatan.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial