Associate Civil Engineer
Current- Project Engineer for a capital improvement project (Planning, Design and Construction phases) which constructs 36-inch to 54-inch RCP combined sewer pipelines via open-cut and trenchless tunneling methods. Scope also includes 8-inch DIP water distribution main replacement and construction of a new high pressure 36-inch WSP water transmission main as well.