Khaled Seada work email
- Valid
Khaled Seada personal email
- Valid
A Qualified Engineer with 16+ years’ experience in EPIC Construction Industry in every high and low-end aspect of MEP Construction Field, and project management, seeking a challenging role in a dynamic organization to develop my expertise in achieving company objectives.Site based experience in handling Projects, engineering, procurement, quality control, installation, pre-commissioning and commissioning.Gained exposure in fields like Infrastructure, Roads and Utilities, Power Substations, Malls, Stadiums &High Rise Buildings Projects. .Deft in Providing Leadership and direction for managing multiple concurrent projects, handling complete project lifecycle from initial concept through to construction by adopting a variety of project management tools and techniques. Excellent leadership and managerial skills with a focus on integrating quality with business objectives and practical requirements.
Hassan Allam Technology
-
Electrical Construction ManagerHassan Allam Technology Nov 2021 - PresentCairo, EgyptProject: Bashteel Train Station Client: MOT (GOVERNMENT)Consultant: Diaa Consult (Engineering Consulting &Services) Location: Imbabah,Giza, Egypt Project Value: 750 Million USDResponsibilities:Supervision of all the Electrical installations on site (including Infrastructure Scope, Tunnels, MV Network, Switchgear, TX’s, MDB’s Etc.)• Coordination meetings with main-contractor and client• Progress monitoring, review and verify subcontractor(s)… Show more Project: Bashteel Train Station Client: MOT (GOVERNMENT)Consultant: Diaa Consult (Engineering Consulting &Services) Location: Imbabah,Giza, Egypt Project Value: 750 Million USDResponsibilities:Supervision of all the Electrical installations on site (including Infrastructure Scope, Tunnels, MV Network, Switchgear, TX’s, MDB’s Etc.)• Coordination meetings with main-contractor and client• Progress monitoring, review and verify subcontractor(s) monthly invoices• Defining project constraints & key milestones based on the approved masterwork plan• Assigning different tasks and work activities to the project team based on their skills/experience & capabilities with productivity monitoring• Checking and reviewing all shop drawings, coordinated/composite services drawings and material appraisals in line with the project specifications, E&M design.• Reviewing all design changes, monitoring and approving variation work orders for subcontractors• Planning and scheduling material deliveries and monitoring the overall work progress against the approved work program and look-ahead schedules and preparing weekly project report for the management meeting• Coordinating and following up with the engineering dept. for all the site technical related issues, managing and supporting the draughtsman/CAD operators in preparing the shop drawings for the different trades, builders work, services coordination & As-built drawings• Planning and scheduling material deliveries and monitoring the work progress against the approved main contractor’s program and look-ahead schedules• Attending scheduled meetings with the internal staff as advised by the project manager and ensuring adherence to the planned or programmed works and company quality and HSE policies• Responsible for the day to day work execution progress in coordination with the site engineers, supervisors and foremen to achieve the planned clearance dates, initial and final fixes Show less
-
Mep Construction ManagerAdvanced Technology Services (Ats) Oct 2020 - Jul 2021Cairo, EgyptKey Projects: Project: Cairo Festival City- Podium-1Client: Al Futtaim GroupConsultant: RMC (Raafat.Miller. Consulting) Location: New Cairo City, Cairo, EgyptProject Value: 150 Million USDResponsibilities:•Handling the installation of the overall E&M works executed in Three buildings out of Six through our E&M subcontractor’s workforce and a group of company direct workers and other subcontractors•Prepare take-off material quantities and… Show more Key Projects: Project: Cairo Festival City- Podium-1Client: Al Futtaim GroupConsultant: RMC (Raafat.Miller. Consulting) Location: New Cairo City, Cairo, EgyptProject Value: 150 Million USDResponsibilities:•Handling the installation of the overall E&M works executed in Three buildings out of Six through our E&M subcontractor’s workforce and a group of company direct workers and other subcontractors•Prepare take-off material quantities and material requisitions comparative statements•Responsible for the day to day work execution progress in coordination with the site engineers, supervisors and foremen to achieve the planned clearance dates, initial and final fixes•Ensure that the works are completed on time, notifying the client of any delays and valuing the costs associated with the delays, with QS coordination.•Coordinating and following up with the engineering dept. for all the site technical related issues, managing and supporting the draughtsman/CAD operators in preparing the shop drawings for the different trades, builders work, services coordination & As-built drawings•Checking, reviewing and preparing shop drawings and material submittals in line with the project specifications and incorporating consultant’s comments for obtaining final approval•Planning and scheduling material deliveries and monitoring the work progress against the approved main contractor’s program and look-ahead schedules•Reviewing all design changes, monitoring and approving variation work orders for subcontractors•Preparing monthly payment interim invoices application based on work progress percentages and submit it for approval and payment follow up•Preparing variation claims/cost sheets based on site modification and client additional requirements subject to consultant approval•Coordination meetings with main-contractor and client•Progress monitoring, review and verify subcontractor(s) monthly invoices Show less -
Mep Site Project ManagerAdler Eg Jan 2020 - Sep 2020EgyptADLER, Egypt Designation: MEP Site Project Manager Project: ACA-Administrative Control Authority Project, ,Ministry Of Justice ,Parliament Project, Olympic Sport CityClient: Government- Ministry of Defense (Armed Forces Engineering Authority) Main Contractor: Concord-Arab Contractors Consultant: ECG-Precision Consulting Engineering Location: New Capital City Cairo– Egypt. Project Value: 350 Million USD Responsibilities: Fully in-charge of Electro/Mechanical… Show more ADLER, Egypt Designation: MEP Site Project Manager Project: ACA-Administrative Control Authority Project, ,Ministry Of Justice ,Parliament Project, Olympic Sport CityClient: Government- Ministry of Defense (Armed Forces Engineering Authority) Main Contractor: Concord-Arab Contractors Consultant: ECG-Precision Consulting Engineering Location: New Capital City Cairo– Egypt. Project Value: 350 Million USD Responsibilities: Fully in-charge of Electro/Mechanical Projects Reviewing design, installation & implementation processes of all MEP system (HVAC, Electrical (MV, LV), Fire Protection, Plumbing & Sanitary, FCU’s, AHU’s, Chillers, security, structured cabling system, control systems, etc., Management of testing and commissioning processes Responsible for planning and scheduling of all major activities of the Project to achieve timely completion of the Project. Fully responsible for all contractual issues related to the day-to-day running of the Project& determine all Project requirements (Technical and General). Interface daily with multiple contractors, including general contractors, electrical contractors, mechanical contractors. Regularly troubleshoot and eliminate construction and design roadblocks. To ensure the timely submittal of all project submittals and obtaining approvals. (Samples, Shop Drawings, Design Details, Work Procedure, Method Statements, Schedules, Programs etc.) To schedule and plan all project activities in line with Master Program in co-ordination with the Planning Engineer. To receive all project related instructions from the Client, Engineer, Main Contractor, etc. and transmit, communicate and arrange effective action in co-ordination with the deputy general manager. To attend all project related meeting with Client/Engineer/Main Contractor and reporting back to the Division Manager on the proceedings. To evaluate the requirement of all project resources (materials, machinery, manpower) as per schedule . Show less -
Section Head EngineerConsolidated Contractors International Company Feb 2017 - Nov 2019Almaza,Cairo-Egypt-Consolidated Contractors Company (CCC), Egypt February 2017 - Present Designation: Section Electrical Engineer Key Projects: Project: City Center AlmazaClient: Majid Al Futtaim Properties (MAF)Consultant: Archimid- RTKL-WSP -Shaker Consultancy Group Location: Cairo– Egypt.Project Value: 450… Show more Consolidated Contractors Company (CCC), Egypt February 2017 - Present Designation: Section Electrical Engineer Key Projects: Project: City Center AlmazaClient: Majid Al Futtaim Properties (MAF)Consultant: Archimid- RTKL-WSP -Shaker Consultancy Group Location: Cairo– Egypt.Project Value: 450 Million USDResponsibilities:•Generally responsible for implementations and monitoring of all electrical related works at site.•Installation of Low Voltage and Medium Voltage Networks including Step Up & Down Transformers ,Switch Gears , RMU’s, Generators , indoor and outdoor Bus Way, MV/LV Cables etc.•Monitoring and controlling project execution with respect to time, cost and quality.•Review & submit weekly progress valuation of MEP work, Daily work report, inspection requests and all applicable monitoring reports on regular basis•Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc, required for all electrical and related works prior to execution.•Ensures that all the works done are in accordance with the approved construction drawings, contract documents, project specifications, and all applicable standards whether local or international standards.• Directly responsible for the safety of all electrical groups’ personnel of the project by ensuring that the project execution will be done according to all applicable health, safety, sanitary and environmental standards.•Participate in client Progress meetings & Interface with other disciplines within the MEP team for coordination. •Assigns work tasks/ activities to Site Engineers, foremen & subcontractors.•Liaising with QC Engineers & Owner representative regarding work progression and hold point inspections. Show less -
Section Head Engineer - ElectricalConsolidated Contractors International Company Aug 2011 - Nov 2016Key Projects: Project: Dukhan Highway Project (DHP)Client: AshghalProject Management: KBRConsultant: Atkins Location:Dukhan – Qatar.Project Value: 400 Million USD.Responsibilities:Site surveys, preparation of shop drawings, finalizing sub-contractors and suppliers for various electrical items for Kahramaa and Ashghal approval.Interface & coordination works between Kahramaa various departments. Preparation and installation of temporary road lighting… Show more Key Projects: Project: Dukhan Highway Project (DHP)Client: AshghalProject Management: KBRConsultant: Atkins Location:Dukhan – Qatar.Project Value: 400 Million USD.Responsibilities:Site surveys, preparation of shop drawings, finalizing sub-contractors and suppliers for various electrical items for Kahramaa and Ashghal approval.Interface & coordination works between Kahramaa various departments. Preparation and installation of temporary road lighting including design.Material take-off and work procedure preparations.MAR, TQ’s, QCP-ITP for client approval etc.Preparation of Street Lighting system & indoor and outdoor substations technical packages for material approval, method statements, site engineering drawings, as-built etcSupervision for installation of kahramaa indoor and outdoor substations including 11 KV , Transformers ,Switch Gears ,Ring Main units (RMU’s),Feeder Pillar’s etc.Installation of 11 KV cables, pilot cables, street lighting poles, high mast columns, street lighting feeder Pillars , Earthing networks etc.Demolition & diversion of existing high voltage over headlines, cables &high masts etc. Show less -
Testing & Commissioning EngineerConsolidated Contractors Int. Company At Ras Laffan Port Expansion Project (Rlpep) Aug 2010 - Aug 2011Ras Laffan – QatarKey Projects: Project: Ras Laffan Port Expansion Project (RLPEP)Client: Qatar Petroleum (QP)Consultant: CCC/EPSOLocation: Ras Laffan – Qatar.Project Value: 2.2 Billion USD.Responsibilities:Testing and pre-commissioning of Electrical Systems (lighting &small power distribution boards, grounding & lightning system, Transformers, LV & HV Switch Gear, RMU, UPS & Batteries) according to inspection test plans specified to meet the full compliance of the existing… Show more Key Projects: Project: Ras Laffan Port Expansion Project (RLPEP)Client: Qatar Petroleum (QP)Consultant: CCC/EPSOLocation: Ras Laffan – Qatar.Project Value: 2.2 Billion USD.Responsibilities:Testing and pre-commissioning of Electrical Systems (lighting &small power distribution boards, grounding & lightning system, Transformers, LV & HV Switch Gear, RMU, UPS & Batteries) according to inspection test plans specified to meet the full compliance of the existing Electrical Power systems in the project prior to commissioning. Organize and follow-up commissioning activities in the project with various system vendors and Client.Analyze, investigate the areas of concern and monitor the course of corrective action upon the delay in progress. Reviewing all Electrical Engineering drawings and vendor documents to confirm and clarify the system’s parameter, specifications, ratings, and tagging…etc for all earthing, lightning, lighting, electrical ring grid, RMUs-if applicable, transformers, switch gears, distribution panels, UPS and batteries, switch boards...etc.Preparing the Pre-commissioning/commissioning documents for the pre-commissioning & commissioning activities after Construction works are completed Show less -
E&I Site EngineerConsolidated Contractors International Company Sep 2008 - Aug 2010Highlights:Nominated as Field Interface coordinator with Ras Laffan owners and Operations (QP,Rasgas,RLIC,CSF)for all the permits work, site visits ,presentation of our scope of work in the common working areas.Received an award and letter of appreciation in recognition of applying high level safety procedures of an equally hazardous free workspace.Key Projects: Project: Common Cooling Sea Water Cat2 (CCW2) Client: Qatar Petroleum (QP)Location: Ras Laffan –… Show more Highlights:Nominated as Field Interface coordinator with Ras Laffan owners and Operations (QP,Rasgas,RLIC,CSF)for all the permits work, site visits ,presentation of our scope of work in the common working areas.Received an award and letter of appreciation in recognition of applying high level safety procedures of an equally hazardous free workspace.Key Projects: Project: Common Cooling Sea Water Cat2 (CCW2) Client: Qatar Petroleum (QP)Location: Ras Laffan – Qatar.Project Value: 700 Million USD.Responsibilities:Supervision during installation of various Electrical and Instrumentation equipments like MV Package substation, MCC, DCS, F&G system, MOV’s, UPS, HVAC Controls, Lighting, Field Instrumentation, Ultrasonic Flow meters, Analyzers, Fiber optic network etc Site survey for existing facilities and clashes identification and preparing reports for engineering consultant (Technip).Pre-Commissioning and testing activities and Commissioning follow-up with various vendors on site.Overall responsible for site planning, material availability, manpower & equipment control.Monitoring project quality plan and ensuring operational activities are in line with the safety objectives. Communicating safety polices standards, and procedures to the operational staff and advising them on practical solutions to minimize risks.Plan and execute works according to project schedules; prioritizing activities; forecasting, evaluating, monitoring and submitting weekly progress reports of the same to the senior management.Material take-off, sourcing, preparation of comparison sheets and placing order along with procurement department.Preparation of various project documentation like Work procedures, MAR, TQ’s, QCP-ITP, updating drawings for client approval etc.Punch lists clearance, as-built documentation and final handing over to client.All electrical power works for site facilities including design for fire alarm system and its interface. Show less -
Electrical Site EngineerPetrojet At Pdh/Pp Project Apr 2008 - Sep 2008Petrojet, Port Said- Egypt Electrical Site Engineer Key Projects: Project: PDH/PP ProjectClient: UHDE ThyssenKrupp Project Value: 100 Million USD.Responsibilities:All electrical and Instrument installation supervision with sub-contractors.Quantity surveying based on engineering drawings and material issuance in liaison with the client.Actively associated with preparation of… Show more Petrojet, Port Said- Egypt Electrical Site Engineer Key Projects: Project: PDH/PP ProjectClient: UHDE ThyssenKrupp Project Value: 100 Million USD.Responsibilities:All electrical and Instrument installation supervision with sub-contractors.Quantity surveying based on engineering drawings and material issuance in liaison with the client.Actively associated with preparation of invoices as per work done and budgeting.Applying all aspects of earthing and lightning works of the project.Temporary project site facilities, PDH camp work related to supply of electrical power. Show less -
Electrical Site EngineerPetrojet At Bani Ebid Grain Silos Jun 2007 - Apr 2008Petrojet, Bani Ebid – Dakahlia – Egypt Electrical Site Engineer Key Projects: Project: Bani Ebid Grain Silos 30000 TonsClient: Holding Company for Silos and Storage (EHCSS)Project Value: 9 Million USD.Responsibilities:•Installation of Medium and low Voltage Switch gear (ABB UNIGEAR), MCC Panel, 1 MVA Transformer, earthing , lightning system, telecom and wireless system.•Leading Fire Alarm and Fire… Show more Petrojet, Bani Ebid – Dakahlia – Egypt Electrical Site Engineer Key Projects: Project: Bani Ebid Grain Silos 30000 TonsClient: Holding Company for Silos and Storage (EHCSS)Project Value: 9 Million USD.Responsibilities:•Installation of Medium and low Voltage Switch gear (ABB UNIGEAR), MCC Panel, 1 MVA Transformer, earthing , lightning system, telecom and wireless system.•Leading Fire Alarm and Fire Fighting System (FM 200, CO2) & Fire Fighting Water Pump (Firetrol) installation and commissioning.•Preparation of technical bids, comparison sheets and finalizing work orders based on best offer•Supervising and following up with many vendors and subcontractors during commissioning, documentation, material delivery, warranties and maintenance issues.•Responsible for clearing the Punch list and handing of the project. Show less
Khaled Seada Skills
Khaled Seada Education Details
-
The Higher Technological Institute (10Th Of Ramadan City) EgyptElectrical And Computers Engineering -
Saint Fatima Language School
Frequently Asked Questions about Khaled Seada
What company does Khaled Seada work for?
Khaled Seada works for Hassan Allam Technology
What is Khaled Seada's role at the current company?
Khaled Seada's current role is MEP Site Project Manager.
What is Khaled Seada's email address?
Khaled Seada's email address is kseada@ccc.gr
What schools did Khaled Seada attend?
Khaled Seada attended The Higher Technological Institute (10th Of Ramadan City) Egypt, Saint Fatima Language School.
What skills is Khaled Seada known for?
Khaled Seada has skills like Commissioning, Inspection, Electrical Engineering, Construction, Instrumentation, Power Distribution, Procurement, Switchgear, Dcs, Mep, Project Estimation, Substation.
Not the Khaled Seada you were looking for?
-
-
-
1gmail.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial