Kit Rama Email and Phone Number
Kit Rama work email
- Valid
- Valid
- Valid
Kit Rama personal email
- Valid
12-years’ experience in telecommunication industry in technical fields and engineering project administration support. Which include site built programs and deployment, Project coordinator, Document Q/A controller and support for site handover pack documentation. Knowledgeable and experience in wireless mobile project rollout for Optus and VHA for the last 7-years in Australia. With exceptional 8-years in broadcasting operation and in engineering department when in the Philippines and presently 6-years and counting in TX Australia.
-
Broadcast Field Operation And MaintenanceTx AustraliaArtarmon, Nsw, Au -
Broadcast Field Operation And MaintenanceTx Australia Sep 2018 - PresentAustralia -
Project AssistantEnersys Jul 2018 - Sep 2018Sydney, New South Wales, AustraliaUpdate Salesforce milestone, facilitate site access, prepare handover pack and QA. Attend weekly meetings with stakeholders. Assist field staff in warehouse material request. -
Q/A Document Controller AssistantVasp Group Aug 2017 - Apr 2018Sydney, New South Wales, AustraliaCoordinate project activities related to the document procedure, including technical documents, drawings and commercial correspondence. Process final handover pack submission- by checking quality of documents and monitoring processes and compliance. Input document data into the standard registers ensuring that the information is accurate and up to date. Make sure that controlled copies of latest approved documents and drawings are given to the appropriate field staff, subcontractors and suppliers as applicable. Focused on timely submission of handover documents using client’s data base system for uploading in Huawei- ISDP and Nokia- IPM system. -
Telstra L6 Hop Q/A SupportVentia Jul 2016 - Aug 2017Sydney, New South Wales, AustraliaAssisted in the preparation and submission for Telstra level 6 documentation by compiling and verifying technical site reports, capturing as-builts, certificates, photos and overall final hand over package for all sites to comply and in adherence to Telstra co-location procedure. Coordinate and support various groups in OWP-Optus Wireless Project , in filing, sorting and retrieval of electronically stored or hard copy documentation in a timely, accurate and efficient manner. -
Wireless Communication Field Technician (Level5)Visionstream Pty Ltd Feb 2014 - Jun 2016Sydney, New South Wales, AustraliaStudy and analyse FC (For Construction) drawings and associated work permits/induction, mobile plants and OH&S procedures, Installation of mobile BTS (Base Transceiver Station) and transmission, Troubleshooting of BTS or Ancillary hardware related to RF performance issue, Upgrade existing BTS configuration and provision/integrate new technology system, Perform call/data testing for 2G, 3G and LTE. Locate and diagnose hardware electronic faults on BTS/TX alarms, Upgrade BTS capacity module hardware and software, Hybrid and Coax feeder testing and analysis using site master, optical power meter and light source, Undertake complex data cable re-wiring and arrangements, Interpret related engineering design plans and judge appropriate methods, Conduct and report technical investigations, Liaise with field managers and projects engineers for site survey and inspection, Carry out site diary report and data entry to IT system (Mobile Z), Undertake site outage planning management schedule in Citrix system- raising a PTW (Permit to Work), Conduct field test – ITP, Installation and maintenance of network assets, Supervise external contractors, Site update and upload appropriate database in OWP- VisZ systems with site completion.Projects Involved:• OPTUS Regional LTE/Green Field Projects Roll-out Huawei Base Station 3900L- New install/Swap/Upgrade • OPTUS Metro SU Only Projects Roll-out Nokia Base Station 3900L- New install/Swap/Upgrade• OPTUS lead eJV/Green Field Projects Roll-out Nokia & Huawei Base Station- New Install/Swap/Upgrade -
Tech/RiggerGundry'S Telco And Rigging Pty Ltd Sep 2013 - Feb 2014Sydney, New South Wales, AustraliaCarry out rigging techniques to install customer premises equipment and technical works- Swap new antenna, Run coax feeders, terminate coax connectors, test coax feeders for distance to fault, return loss, cable loss, PIM test and other ancillary equipment. Install, test and commission DC power system, Complicated overhead and underground installation service, Bonding and earthing of all cables including measurements, Locate plant of other utilities prior for construction, Interpret plans and diagrams in order to plan works, Antenna assembling- erecting, positioning and labelling all related equipment, Complete documentation or as-built.Projects Involved:• Vodafone Apollo LTE Projects (November 2013 to January 2014)Huawei & Nokia RRU-New installation• Vodafone lead eJV Projects (September 2013 to October 2013)Huawei 3900L base station-New installation/Swap/Upgrade -
Field Telecommunication EngineeringSoon Poh Technologies Mar 2011 - Aug 2013Singapore, SingaporeInvolves in end to end project implementation position in various contracting projects- RFQ preparation, project management and site deployment, design analysis, project documentation, technical site support, on-site engineering and supervision (Equipment Installation, Testing, Provisioning and Integration), EHS site coordinator.Projects Involved:• STARHUB NETWORK SINGAPORE (MARCH to AUGUST 2011)HUAWEI BTS3900 2G/3G SWAP PROJECT, TEAM LEAD FIELD ENGINEER -
Telecommunication Engineer, SupervisorAsia Regional Telecommunication Services, Inc. Aug 2006 - Feb 2011PhilippinesDelivery of engineering services as project engineer for local and overseas projects– Equipment installation, provisioning and integration, site logistics, site coordination, deployment and management, design analysis, project documentation, technical site support, site troubleshooting, rectification and site acceptance.Deployment Projects Overseas: • PTSMART TELECOM, Indonesia (Jan 12-17, 2009)TEKELEC SS7, STP Project- Installation and Hardware Verification Testing• MOBILE ONE TELECOM, Singapore (Oct 27 – Nov. 01, 2008)TEKELEC SS7, STP Expansion Project- Installation • PTSMART TELECOM, Indonesia (Aug. 11- Oct. 21, 2008)TEKELEC SS7, STP Project- Installation• VIETTEL, Vietnam (May 27 – June 27, 2008) TEKELEC SS7, STP Expansion Project- Installation and Hardware Verification Testing• PTSMART TELECOM, Indonesia (March 05-20, 2008) TEKELEC SS7, STP Project- Site Survey • SRR TELECOM- Societe Reunionnaise de Radiotelephone, Mayotte (Jan. 23 - Feb. 03, 2008) TEKELEC SS7, STP Project- Installation• MOBILE ONE TELECOM, Singapore (Dec. 10, 2007 – Jan. 05, 2008) TEKELEC SS7, STP Project- Installation and Hardware Verification Testing• VIETTEL, Vietnam (Aug. - Oct. 2007) TEKELEC SS7, STP Project- Installation• FIJITEL, Fiji Island (Sept. 2006) HUAWEI, BTS CDMA Project- Roll-out- Installation and Commissioning • SAMOATEL, Western Samoa (Sept. - Nov. 2006) HUAWEI, BTS GSM Project- Roll-out- Installation and Commissioning
-
Transmission And Network Operations EngineerZoe Broadcasting Network, Inc. Jun 1998 - Nov 2006PhilippinesMaintenance and monitoring of VHF & UHF solid state TV Transmitter, supervised network TV operation and network signal coverage, participated in a task group for planning and implementation of special technical projects and network expansions, Maintain studio to transmitter link, Facilitate TVRO Satellite systems, Integrate simulcast on-air operation and web-casting via internet live streaming, On board control operation of “On-air” master continuity switcher and Support SNG/ENG remote ‘Live’ coverage broadcast.Construction of Studio Transmitter and Tower Projects: (Nov. 2005 to March 2006)• ZOE TV UHF Channel 33, Antipolo City Philippines - TOSHIBA, 40kW Solid State UHF TV Transmitter- Installation, Testing, On-Air. - ANDREW TRASAR UHF TV ANTENNA- VSWR Testing - TV Transmitter Designing and Project Implementation - Site Acquisition and Permitting- NTC, KBP, BOI, NEDA. - LINEAR STL TV Microwave, Installation and Commissioning.
Kit Rama Skills
Kit Rama Education Details
-
Information Technology -
Electrical, Electronics And Communications Engineering
Frequently Asked Questions about Kit Rama
What company does Kit Rama work for?
Kit Rama works for Tx Australia
What is Kit Rama's role at the current company?
Kit Rama's current role is Broadcast Field Operation and Maintenance.
What is Kit Rama's email address?
Kit Rama's email address is ki****@****.com.au
What schools did Kit Rama attend?
Kit Rama attended Technological University Of The Philippines, Technological University Of The Philippines.
What are some of Kit Rama's interests?
Kit Rama has interest in Field Engineering, Project Roll Out Coordinator, Document Controller.
What skills is Kit Rama known for?
Kit Rama has skills like Telecommunications, 3g, Gsm, Nsn, Transmission, Integration, Rollout, 2g, Microwave, Commissioning, Pdh, Umts.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial