Koray Uzunoğlu
AeroLeads people directory · profile

Koray Uzunoğlu Email & Phone Number

MSc.Geotechnical Engineer - Engineering Geologist at Gülermak Heavy Industries Construction & Contracting Co. Inc
Location: Türkiye, Turkey 12 work roles 4 schools
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
MSc.Geotechnical Engineer - Engineering Geologist
Location
Türkiye, Turkey
Company size

Who is Koray Uzunoğlu? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Koray Uzunoğlu is listed as MSc.Geotechnical Engineer - Engineering Geologist at Gülermak Heavy Industries Construction & Contracting Co. Inc, a with 528 employees, based in Türkiye, Turkey. AeroLeads shows a matched LinkedIn profile for Koray Uzunoğlu.

Koray Uzunoğlu previously worked as Geotechnical Engineer at Gülermak Heavy Industries Construction & Contracting Co. Inc and Geotechnical Site Engineer at Trevi S.P.A.. Koray Uzunoğlu holds Bachelor'S Degree, Geological Engineering from Istanbul Technical University.

Company email context

Email format at Gülermak Heavy Industries Construction & Contracting Co. Inc

This section adds company-level context without repeating Koray Uzunoğlu's masked contact details.

Gülermak Heavy Industries Construction & Contracting Co. Inc

Review company-level records connected to Koray Uzunoğlu before choosing the right outreach path.

Profile bio

About Koray Uzunoğlu

• Experienced engineering geologist and geotechnical engineer with progressive experience of soil and rock mechanics, ground improvements and diverse of significant projects within the EPC, oil&gas industry, open mine pit TSF (Tailing Storage Facility) , Reclamation and marine works, tunnel and the other types of civil construction projects.•Implemented various geotechnical site applications such as : Bored piles (Secant, contiguous and CFA ),Driven Pile, Diaphragm wall (Trench Cutter and Grab) ,Draining Systems, Earthworks-Slope Stability, Settlement Analysis, Anchor, Jet Grouting, Rigid Inclusion, Grouting Injections.• Slope Stability Analysis with LEM, Kinematic and FEM.•Geological description of the soil, rocks and the formations. Rock mass classification (RMR, Rock Tunnelling Quality Index Q , GSI )•In depth knowledge of theorically and practically about Osterberg (O-cell) Load Test, Cross Hole Tests, Pile Integrity Tests, Inclinometer Tests, Static Load Test, Piezometer test and other types of in-situ soil tests.•Remarkable knowledge of quality and safety management concepts related to construction•Strong communication skills with successful technical negotiations, •Fully supportive team environment; excellent team player

Listed skills include Rock Mechanics, Ground Instructor, Geotechnics, Engineering Geology, and 14 others.

Current workplace

Koray Uzunoğlu's current company

Company context helps verify the profile and gives searchers a useful next step.

Gülermak Heavy Industries Construction & Contracting Co. Inc
Gülermak Heavy Industries Construction & Contracting Co. Inc
MSc.Geotechnical Engineer - Engineering Geologist
gölbaşı, ankara, turkey
Website
Employees
528
AeroLeads page
12 roles · 12 years

Koray Uzunoğlu work experience

A career timeline built from the work history available for this profile.

Geotechnical Site Engineer

Bölgesi Roghun, Districts Of Republican Subordination, Tacikistan

Roghun HPP Dam Project• Managing dam gallery tunnels injection grouting applications (consolidation, curtain grouting) according to project design and milestone schedule that arranged by contractor.• Micropile implementation for slope stability .• Preparing the daily geotechnical execution reports about site .• Managing operations compliant with the design documents, QA/QC procedures and standards (drilling,grouting,micropiling), liaising with contractor and arranging the site conditions according to milestone schedule.• Curtain grouting with GIN method upstage grouting, consolidation grouting with downstage and upstage methods.

Jan 2024 - Sep 2024

Earthworks Project Engineer

Erzincan, Turkey

Çöpler Sulphite Expansion Project - Tailings Storage Facility ( TSF )• Organizing whole site construction activities such as drainage systems, excavation, fillings, concreting and backfilling • Managing earthworks and rockfill embankment ( 2 million m3 rockfilling )• Managing 2 km drain system on 5 creeks works with alluvial deposite scraping, granular filter protection ( 5-35 mm ) with geotextile connect to the under drain system.• Supervising the -200 mm material filling above under drain system according to project elevations.• Controlling impoundment excavations and scraping complying with lower clay layer elevations and provide gravity flow under-drain system and collection pond.• Liaising with subcontructor in order to make a schedule and progression for clay placement - compaction, GCL and Geomembrane placement according to the Technical Specification and QA/QC requirements.• Installation under drain and foundation piezometers and readings.• Supervising the excavation of construction access roads.• Inspecting the materials ( fine filter, coarse fill, rock fill and filling materials ), rock mass classification at the excavated zones.• Supervising the water monitoring well drillings and ground water level.• Maintained safe, secure, and healthy work environment by following and enforcing standards and procedures complying with legal regulations

2018 - 2021 ~3 yrs

Geotechnical Civil Supervisor

İzmir, Türkiye

STAR Refinery Construction Marine Works and Reclamation.● Supervising , controling and liaising with subcontractor about operations at reclamation area and marine works off shore for Jetty construction.● Managing the bored pile, driven pile within marine works, jet grout and rigid inclusion operations at site, arranging schedule and programme according to site conditions.●Supervising the bored pile drilling , installation reinforcement steel cage and concreting compliance with respect to QA/QC requirements, standarts, safety codes and other regulations.●Bored pile manufacture is carried out with 2 Bauer 28, 1 Bauer BG 25 and 1 Bauer BG 36; jet grout with 8 jet grout rigs and rigid inclusion with 2 machines. Bored piles according to project consist secant and contiguous piles change the deepness 15m to 35 mt . Temporary casing can reach 28m according to ground conditions.• 800 nos (btw 1000mm to 1600mm diameter) pile driving (Water depth: -10m up to -45m)• Offshore pile boring works with the help of WIRTH PBA 612• Steel pile manufacturing works in various lengths as per design and piles driven to expected hard stara elevation• Pile static load test (compression,tension and lateral load test) executed on 3 piles of each jetty.●Inspecting and supervising the Cross hole ( CSL ) and pile integrity tests ( PIT ) for Bored piles.●Supervision and controlling the slope excavation, checking the slope stability designs and provide comply with site conditions.●Supervising of jetty steel pile installation and approval of all as built sections related to marine works such as Dredging,reclamation sections, piles, superstructure and offshore works.● Responsible for development,optimize and application of method statements in the office and on project sites.● Maintained safe, secure, and healthy work environment by following and enforcing standards and procedures complying with legal regulations

2015 - 2017 ~2 yrs

Geotechnical Senior Site Engineer

Moscow, Russian Federation

Planirovky Project Contractor : ( LSR Group ) Diaphragm wall construction :● The scope of the work included that reinforcement of the ground for deep excavation before construction.● Managing operations compliant with the design documents ( excavation, installaion steel cage, concreting), liasing with contractor and arranging the site conditions according to milestone schedule.● Prepared of installationand concreting records and report activities directly to site manager● Calculation and verification payments according to drilling values , submit to the site manager and contractor.● Scheduled material and equipment purchases and delivery.● Managed team consisted of at least 50 people.● Used by the geotechnical method of diaphragm wall construction that 15mt excavation along sandy silt, sand and clay lithologies with two drilling machines ( Bauer GB30 - Casagrande C400 ) .

Jun 2015 - Nov 2015

Geotechnical Site Engineer

Moscow, Russian Federation

Patriotichesky complex Patriot Project ( Government ) Contractor : ELSET / BUR SPETS STROY Bored pile execution Φ1200mm and Φ1000mm● ( Full temporary case oscillator, bentonite and CFA )● That project conducted by the government for an huge military camp and multi-functional complex . In order to strengthen the foundation Φ1200 mm and Φ1000mm bored piles were made 11m casing and approximately 30 m drilling with bentonite, full casing with Oscillator and CFA system ( continuous flight auger ) .● The organizing of the whole technical and personel the issues were contained inside the work definition and the team had more than 40 people.

Feb 2015 - May 2015

Project Engineer

Moscow, Russian Federation

Skolkovo Hub Project Contractor : Procons Construction Bored Piles Φ1200mm● The project which was conducted by Procons Construction, include that strenght the bridge pier with Φ1200mm bored piles. Bridge provides the connection with two office buildings that are● seperated by motorway and railway. Bored piles was made with using 17m casing and airlifting approximately 38m drilling with bentonite.● Managing operations compliant with the design documents ( excavation, installaion steel cage, concreting ), liasing with contractor and arranging the site conditions according to milestone schedule.● Prepared of installationand concreting records and report activities directly to site manager● Calculation and verification payments according to drilling values , submit to the site manager and contractor.● Scheduled material and equipment purchases and delivery.● Appliying Cross hole test to whole piles examined with Cross hole tests and reporting these files to contractor.

Aug 2014 - Mar 2015

Site Engineer

Moscow, Russian Federation

Moscow City Project Plot 17 – 18 Contractor : Renaissance Constraction● Diaphragm (Slurry) Wall : Cutter Trench Machine (Bauer BG 25/ BC 32 )● Bored Piles : ( Bauer BG 36 ) Φ1500mm● Anchor : ( Casagrande C6 ) 4 rowsRenaissance Construction conducted the project that was existed at Moscow City. The project was intend to strengthened foundation with Φ1500mm bored piles and also diaphragm wall, anchor bolt before deep excavation. Cutter Trench Machine ( Bauer BG 25/ BC 32 ) was used for diaphragm wall excavation two Bauer BG 36 drilling machines was used for bored piles. ● Managing all geotechnical technics according to project design and milestone schedule that arranged by contractor at night shift with a team almost 80 people.● Concucted that the inclometer tests at diaphragm wall and submitted to contractor.● Conducted the anchorage tests.● Prepairing the daily geotechnical execution reports about site and submitting to the contractor.● Applied Osterberg O- Cell to two test pile , The multi-level tests achieved combined loads of up to 131 MN, a European record for a 1500 mm diameter bored pile.

Dec 2013 - Feb 2015

Site Engineer

Saint Petersburg, Russian Federation

Western High Speed Diameter Project Contractor : IC Ictas / Astaldi Diaphragm wall : Bauer GB 30, Casagrande C400, Casagrande B180●The project which is a motorway project in St. Petersburg , conducted by IC Içtaş and Astaldi. Diaphragm wall construction was implemented in order to resist the water for not to leak towards to motorway excavation area. 4 diaphragm excavation machines ( Bauer GB 30, Casagrande C400, Casagrande B180 ) were used. ● Managing at least 60 people and the operations coordination with contractor, reporting daily working documents .

Sep 2013 - Dec 2013

Site Engineer

Esta Jeoteknik

İstanbul, Türkiye

Marmaray Rail Tube Tunnel Project : Soil improvement works at Marmaray, contact grouting injection at Marmaray.(Yenikapı - Sirkeci zone)At the line between Sirkeci and Yenikapı stations the tunnel segments were reinforced with using injection. • Water drainage controlling and supervising at tunnel segments. • Geological description of the soil, rocks and the formations. Rock mass classification. • Managing the team and coordinating with contractor.

Mar 2011 - Apr 2012
Team & coworkers

Colleagues at Gülermak Heavy Industries Construction & Contracting Co. Inc

Other employees you can reach at gulermak.com.tr. View company contacts for 528 employees →

4 education records

Koray Uzunoğlu education

Master'S Degree, Civil Engineering - Geotechnical Engineering

Dissertation subject : Determination of the pile behaviour and load distrubution by means of O-cell load test and strain gage.

Fen Bilimleri

Ordu Anadolu Lisesi
FAQ

Frequently asked questions about Koray Uzunoğlu

Quick answers generated from the profile data available on this page.

What company does Koray Uzunoğlu work for?

Koray Uzunoğlu works for Gülermak Heavy Industries Construction & Contracting Co. Inc.

What is Koray Uzunoğlu's role at Gülermak Heavy Industries Construction & Contracting Co. Inc?

Koray Uzunoğlu is listed as MSc.Geotechnical Engineer - Engineering Geologist at Gülermak Heavy Industries Construction & Contracting Co. Inc.

Where is Koray Uzunoğlu based?

Koray Uzunoğlu is based in Türkiye, Turkey while working with Gülermak Heavy Industries Construction & Contracting Co. Inc.

What companies has Koray Uzunoğlu worked for?

Koray Uzunoğlu has worked for Gülermak Heavy Industries Construction & Contracting Co. Inc, Trevi S.P.A., Yıldız Teknik Üniversitesi, Ssr Mining Inc., and Saipem.

Who are Koray Uzunoğlu's colleagues at Gülermak Heavy Industries Construction & Contracting Co. Inc?

Koray Uzunoğlu's colleagues at Gülermak Heavy Industries Construction & Contracting Co. Inc include Hamdullah Turğut, Patryk Celej, Olga Wnętowska, Bikram Singh, and Fehmi Cinar.

How can I contact Koray Uzunoğlu?

You can use AeroLeads to view verified contact signals for Koray Uzunoğlu at Gülermak Heavy Industries Construction & Contracting Co. Inc, including work email, phone, and LinkedIn data when available.

What schools did Koray Uzunoğlu attend?

Koray Uzunoğlu holds Bachelor'S Degree, Geological Engineering from Istanbul Technical University.

What skills is Koray Uzunoğlu known for?

Koray Uzunoğlu is listed with skills including Rock Mechanics, Ground Instructor, Geotechnics, Engineering Geology, Structural Geology, Anchor And Rock Bolt, Diaphragm Wall Construction, and Bored Piles.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.