Construction Manager
CurrentDesign, schedule and HSE reviews for Rio Tinto Gove Bauxite mine sediment pond rehabilitation project works year four of project contract. B2B role with site based Project Manager with responsibilities including scheduling Day / Night shift works requirements, HSE site compliances, daily cost control reviews, HR / IR management, control of site support mechanical workshop, subcontractor management, daily & weekly client interface and internal company meetings, HSR committee meetings… Show more Design, schedule and HSE reviews for Rio Tinto Gove Bauxite mine sediment pond rehabilitation project works year four of project contract. B2B role with site based Project Manager with responsibilities including scheduling Day / Night shift works requirements, HSE site compliances, daily cost control reviews, HR / IR management, control of site support mechanical workshop, subcontractor management, daily & weekly client interface and internal company meetings, HSR committee meetings, design review meeting with design houses, QA review, ongoing daily staff management of engineering team, surveying team, workshop supervision team, administration team, project schedulers, site HSE team, contract administrators and field superintendents and supervisors of civil works.Bulk and detailed earthworks cut to spoil and reclaiming / capping / subsoil and open drain with check / rock box and formed cause way / spill ways to ocean outlets, dam wall remediations and lowering by 23 meters, shaping lowering and reinforcement works. Detailed installation of three FRP / Box culvert concrete causeway outlet works to Gove peninsular seaway with strict EPA concessions management required. Extensive caustic mud enclosure capturing liner works with full topsoil and rehab works and installation of internal roadways with burrow pit creation and management. Multiple deep well and pump installations with poly pipe welding distribution network (upto 500DN)for caustic pond transfer and potable irrigation / construction water requirements.Project Mile stones to date include: Project 94% complete @ Oct 24 with 1.4 Million cubic metres of caustic red mud reprofiling & cut to spoil works, 92,000 Hectares of capping liner deployed, 260,000 cubic metres of wall lowering and reprofiling works, 260,000 cubic metres of rock placement, 7 kilometres of sub soil drain networks, 8 kilometres of internal road networks and road crossings installed and maintained. Show less