Consultant Mechanical Engineer
CurrentDesigning and building manufacturing tooling and manufacturing processes which will reduce manufacturing cost and add to the bottom line.Designed a pressure decay leak test fixture for Woodward which they are using to test throttle bodies for leakage. Turned the project around in 6 weeks which allowed them to move into production ahead of schedule.Did an.