Operation Engineer (Degassing Stations)
CurrentCNOOC International Ltd, Buzurgan oil field, IraqPosition: Operation Foreman (Degassing Station)Oil Production Capacity: Total 9 Degassing Stations ( Each 45000 to 85000 bbl/day )During this tenure, I drive continuous process improvements and optimize parameters to maximize operational output. I review and redesign systems, implementing internal controls and quality checks to boost efficiency, cut costs, and streamline resources. I ensure precise documentation and develop best practices and standard operating procedures to achieve excellence. I manage project documentation, prepare monthly reports, and support research and development. I commission and start up new wells, prepare punch lists, and align operations with project timelines. I enhance production by commissioning flow lines and testing equipment, ensuring system reliability. I monitor and report daily production parameters, taking corrective actions to maintain operational integrity and optimize resource use. I record data for decision-making, analyze wellhead samples for quality control, conduct well tests, and adjust choke sizes as needed. I monitor equipment for abnormalities, manage well transitions between service rigs, and collaborate on calibrations to uphold safety standards. I adhere to Safe Work Permit Systems, report near misses, and comply with HSE policies to ensure a safe working environment. I maintain well sites and assist with PTW approvals, overseeing maintenance projects to optimize production and resource allocation.