Sole Proprietor
CurrentI assist in the design and maintainability aspects of copper solvent extraction / electrowinning operations.Consulting for BHP Billiton Minera Spence project on commissioning the Mesco #1 stripping copper machine. Successfully completed start up a month earlier than the Mesco timeline had shown which allowed production to commence.Consulting for Frontera Copper – Piedras Verdes oxide project to assist in commissioning their Mesco stripping machine plus assisting M3 Engineering with miscellaneous on site projects. Assisted the plant maintenance crews in writing preventive maintenance schedules for the Mesco Stripping machine. Consulting for Nord Resources on a Mesco copper stripping machine. Traveled to Kuala Lampur, Malaysia for the factory acceptance testing. Specified the initial spare parts listing.Consulting for Newmont Mining on their Battle Mountain Nevada Phoenix Project. Operations / maintenance oversight, design and specifications review on the owners behalf at M3 Engineering. Feasibility through Detailed engineering. Vendor visits and factory acceptance testing. Participated in commissioning and successful start upConsulting for Newmont Mining on their Yanacocha leach demonstration project. Operations / maintenance oversight, design and specifications review on the owners behalf at M3 Engineering. Feasibility through Detailed engineering.Design changes and tune up of the copper stripping machine at Minera Maria, Mexico.HAZOP safety review participant.