Facilities Study, Project Documentation And Design Standards Manager
Current> Manages the technical review and approval of Transmission Customer’s Facilities Study reportby providing inputs and recommendations on the connection requirements in order to secureconnection to the Grid system and comply with Philippine Grid Code and Grid Connection Requirements under Energy Virtual One-Stop Shop (EVOSS) Law.> Oversees the preparation of detailed project components of substation and transmission lineprojects for ERC application during the planning stage that includes substation and transmissionline electromechanical equipment and materials, structural/civil/architectural works, protection,control, and communication components.> Manages Engineering Design Standards, Procedures, Guidelines, Philosophies, Policy, IMS Procedure, by identifying and updating new and existing documents to adopt the current needs and comply with the International Standards (ANSI and IEC), Philippine Grid Code, Philippine Electrical Code I and II, Regulatory Commission and Corporate IMS policy.