Construction Manager
CurrentConstruction of Six Lane Main Carriage way with both side service roads for 39km with several major and minor structures starting from km 17+200 (Thalapady) to km 56+200 (Chengala).▪ Main Carriage way + service road has a total width of 45.00m. It consists of paved outer shoulder of 2.00m on outer side of both Main carriageway, 6 number of 3.50m wide lanes and a Crash barrier median having width of 0.50m with both side 0.50m Shyness. Service road consists of 1.50m wide foot path, 2 number of 3.5m wide lanes, a Crash barrier of 0.50m separates it with Main carriage way.▪ Typical section of carriageway consists of BC, DBM, WMM, GSB, SG & Embankment fill.Construction of Retaining wall up to 7.00m and Earth Retaining wall up to 10.00m height on various locations along the 39.00 km stretch.▪ Construction of 08 no’s: of Vehicular underpasses @ following major junctions.Manjeswer (Ch 20+591), Arikady (Ch 36+098), Kumbala (Ch 38+400), Mogral (Ch 40+951), Chowki (Ch 45+108), Viddyanagar (Ch 52+463), Collectorate junction (Ch 52+871) & Cooperative hospital junction (Ch 54+963)▪ Construction of 02 no’s: of Vehicular overpasses @ following major junctions.Hosangadi (Ch 24+188) & Bandiyod (Ch 32+204)▪ Construction of 12 no’s: of Light Vehicular underpasses at various minor junctions.▪ Construction of a Flyover having 1.160 Km length at location Ch 49+350. ▪ Construction of Major bridges @ following locationsUppala (Ch 25+408), Shiriya (Ch 35+223), Kumbala (Ch 37+612) & Mogral (Ch 41+990)▪ Construction of Minor bridges @ following locationsManjeswer (Ch 20+856), Posat (Ch 23+185), Mangalpady (Ch 30+941) & Eriyal (Ch 46+854)▪ Construction of 81 numbers of RCC Box Culverts for Stormwater drainage at various locations.