Dedicated millwright with experience installing, repairing and performing routine maintenance on mechanical and industrial machinery. Expert reader of drawing and schematic designs. Striving to further develop skills related to PLCs and automation tools and techniques
-
MillwrightPower City Electric Aug 2022 - Presentworking as an Electrician at City power Pty (Ltd) under contract doing with the following:• Cable termination poles meter box ,high must, street light ,LV switch gear • Electrical reticulation electrical repair faulty inspiration and installation and maintenance• DB wiring, single and three phases transformer HT join 11kv 220v • Circa Design• Solar Light, solar Guyer,solar touch• Refilling of Gas• Wiring of fault indicators• Pasting warning and destination labels• Fitting of Enclosures• Fitting of Cable Claps high voltage plugs • 3phase motor and single phases motorCable joining terminations HV switch gear Repair or replace wiring, equipment and fixtures using hand or power tools; work from ladders, scaffolds and roofs to install, maintain or repair electrical wiring, equipment and fixtures -
MillwrightEskom Rotek Industry Jan 2022 - PresentASSEMBLING AND DEASSEMBLING GEARBOX &PUMPSREMOVE THE SELECTOR SHAFT INTERLOCKING PLUNGESUNBOLT THE HOUSING COVER PLATEREMOVE STH GEAR SELECTOR PIN FROM SHAFTWITHDRAW STH COMPLETE WITH SYNCHRONIZERREMOVE 5TH GEAR DRIVING GEAR FROM INPUT SHAFTDETACH THE 5TH GEAR CASINGSPLIT THE MAIN GEARBOX CASINGREMOVE THE TWO LOCKING RINGS THAT LOCATE THE MAIN & INPUT SHAFT BEARINGSREMOVE THE MAGNETIC DEBRIS DISCREMOVE SELECTOR SHAFT GUIDE SLEEVEREMOVE THE COMPLETE MAIN & INPUT SHAFT REVERSE GEAR&SELECTOR, FORKSREMOVE THE SELECTOR SHAFT LOCKING PLATEREMOVE THE DIFFERENTIAL GEARS& SHAFT ARE RE-ASSEMBLING WITH NEW BEARINGS FITTED.ALL SHAFT ARE CHECKED FOR DIMENSIONAL ACCURACY,CONCENTRICITY,QUALITY ANDSTRAIGHTNESSCHECK MAIN DRIVE SHAFTT BEARINGS & THRUST BEARINGS FOR WEAR & REPLACE IFREQUIREDCENTRIFTUGAL,PUMPSOPEN PUMP SECTION & DISCHARGE PIPEDRAIN VALVES TO BILGE AND WHEN WATER CEASES TO FLOWCRACK OPEN THE PIPES/PUMP FLANGEJOINTS CAREFULLY TO ENSURE THAT PUMP HAS DRAINED OFF &IS SAFE FOROPENINGUSE A CENTER-PUNCH TO MARCH,MARK COUPLING &CASINGTHEN REMOVE THE COUPLING BOLTSDISCONNECT ALL EXTERNAL FITTING FROM PUMPS CASING E.G COOLINGPIPES,PRESSUREGAUGES,OIL RESERVOIRSREMOVE BOLTING FROM TOP COVER&REMOVE COVERSCRAPE OFF OLD GASKET& CHECK MATING SURFACESREMOVE PUMPS SHAFT WITH IMPELLERDISMANTLE THE IMPLELLER & REMOVE THE WEAR RINGREMOVE GIAND PACKING&DISREGARDCUT ENDS OF PACKING AT 45° AND STAGGER JOINTS WHEN REPACKING GIAND CHECK IMPLELLER/SHAFT KEY&KEYWAYS FOR DAMAGETURN THE SHAFT COUPLING & ENSURE THAT SHAFT IS FREE TO ROTATE
-
Mechanical Fitter Team LeaderGrey Matter Engineering And Construction Projects Aug 2019 - Dec 2021Use CNC machine to machining bolt and tapper lock and etcUse hand tools and power tools Rebuild pumps and replacementReplace slurry pipelines to ash damAlign motor and motor testing Rebuild Actuator and serviceing valvesInstall v-belt and coupling Open pump section & discharge pipelineOpen NRV and check blockage and worn out ballAssembly slurry pipeline to flush blockage Test and replace sludge motor Replace seized pumps Test and Connect submersible pump Fabrication of parts required during overhaul, maintenance or set-up of machineriesWorking on mill sectionConveyors systemTo unblock stuck feeder Open drum door and do inspection Inspect drive pins and replace if it's necessary Service of bearings And pulley Install new bearings on plumber block Inspect and replace pumps Open and close classified doors Assist with ball loading Service of gearbox and Actuator Replace of Actuator -
Millwright Semi SkilledNnt Engineering Industry Mar 2018 - Jul 2019I was working as a millwright artisan semi skilled responsible person for unit 1/6 at Majuba power station Eskom March 2018 until 25 July 2019 i was appointed as a Team leader name of company NNT engineering for shutdown unit 1 doing commissioning unit supervisor mechanical work an MED an C/I ) doing the following activities: as a responsible person millwright semi skilled artisan for unit 1/6 inspection of the plant inside plant and outside plant Commercial and Industrial Wiring, Geyser Maintenance & Installation, DB Wiring Single phase & Three phase, Motor Testing, Installation of Borehole Motors, Fault Findings, Motor Starter Maintenance, Pole replacement, Cable Ranking, UPS,Standby Generators, motor Maintenance & installation, Solar Street Lights Installation & Maintenance, Float switch Installation, doing such as HT join LV, MV & HV transmission lines, Transformer Wiring, Post Connections, Metering,maintainance , PLC Prune, motor pump ,modifications, standby system , Cut-offs, Sub-Station maintenance, cable joining & termination of old wiring . And Rail bonding, Changing of Switches, Changing of Railway Transmission Lines (3KVDC, 22KV, 132kv, & 11KV),Maintaining & Installing of Street Lights ,Connection of bundle conductor, High Masterlights Installation & Maintenance, water plant Sub-Station, Panel Wiring, Fault Finding, Installing Anti Climbing Devices and Kiosk . Inspection motor test MV Switching ,inspection transformers, OHS ACT, writing Risk Assessments and Apply Permit to Work, HV Switchgear, MV Switchgear LV Switchgear, inspection Plant , Diagnose Malfunction system, Prepare Sketches ,inspection and test components, Switchboard,and Electrical system including transformers. Reason for leaving contract ended
-
MillwrightSindizela Phezulu Trading Apr 2016 - Mar 2018Diagnose malfunctioning systems, apparatus and components, using test equipment and hand tools to locate the cause of a breakdown and correct the problemIdentifying and repairing problematic parts of a machine by running tests,making temporary repairs or installing new parts Motor test on single phase and three phase motor. Fault finding on three phase penal. Trace and locate single phase and three phase penal. Using machinery or equipment,such as forklift,to move mechanical parts Assembling and installing machines then testing them to make sure they are working correctly. Overseeing preventive maintenance by identifying and correcting potential issues remove worn out pieces and lubricanting mechanical parts. Test electrical systems and continuity of circuits in electrical wiring, equipment and fixtures, using testing devices such as ohmmeters, voltmeters and oscilloscopes to ensure compatibility and safety of systemManaging the layout and placement of equipment and machinery in factory settings to ensure minimum downtime Must work in full compliance with the approved safety regulations
-
Mechanical FitterNortham Eland Platinum Mine Jan 2014 - Feb 2016Pressure testReplacement of pumps Open and close of flanges Replace Lance and front roll Assembling and dessembling gearbox Conveyor belt system Gun blowerDo preventative maintenance Set fault blower mechanical limit and Lance limitDo fault finding on plant equipment Identification of defects and repaired defects Adhere to safety of the company positive feedback will always be given as requested by foreman To do alignment and installation of bearings
Life Mhlongo Education Details
-
CollegeN3 -
Olifantsfontein IndlelaHigher School
Frequently Asked Questions about Life Mhlongo
What company does Life Mhlongo work for?
Life Mhlongo works for Power City Electric
What is Life Mhlongo's role at the current company?
Life Mhlongo's current role is Millwright.
What schools did Life Mhlongo attend?
Life Mhlongo attended College, Olifantsfontein Indlela.
Not the Life Mhlongo you were looking for?
-
LIFE MHLONGO
Nelspruit -
-
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial