Technical Engineer, Process
Current- Involved in the construction, commissioning, and startup of LNG Train modification project “LPG Production Booster System” (LPBS) that has turned a net-negative LPG production to a 192,000 m3-LPG production in 2022 (as per KPI). Worked in 12-12 hours shift during the commissioning and startup phase.- Presented the LPBS innovation and achieved platinum award in Pertamina Hulu Energi innovation program.- Drafted a patent for the LPBS innovation (submitted to and granted by DJKI).- Estimated the capital cost (conceptual, AACE class-5/4) of a 7-mmscfd Mini-LNG Plant.- Estimated the capital cost (conceptual, AACE class-5/4) of a 4.5-mmscfd Mini-LPG Plant.- Conducted the conceptual design study for a bnrownfield 120-MT/day LPG Filling Station.- Assigned in the development of LNG Cold Storage Prototype; heat load estimation; process design; equipment fabrication and assembly; Work Instruction (WI or SOP), Task Risk Assessment (TRA), HAZID, What-If Analysis, and PSSR; commissioning & testing; and evaluation.- Strategic planning: defined company-wide SWOT analysis, external factor evaluation (PESTEL & Porter's 5 Forces analysis), VRIO analysis, LNG Market Intelligence, Marketing Strategy (QSPM), determining prospective global LNG Projects for revenue forecasting.- Involved in other projects including LNG Regasification (Conceptual) and LPG Hub (FEED & Pre-FID).- Prepared documents related to business development and business support activities: SOW/TOR and contract, technical and commercial evaluation in procurement process, and marketing & other slide decks.