Pavements Engineer
CurrentMy work at Geosolve includes the following projects:June 2020: Timaru Airport FWD Pavement Survey, ACN-PCN Classification and Overlay requirementsJan 2020 to Present: Stabilisation of true right bank of the Clutha River in the reach upstream of the Albert Town Bridge. My role included project and design management, client liaison, report writing, site investigation, drawing sketches/markups for drafting review.Dec 2019 to March 2020: Landfill cover verification via field trial. Shear strength testing, field trial design and execution.Dec 2019 to Present: Landslide drainage remediation in DunedinNov 2019 to Present: Research and development of new pavement testing technology, the Multi Speed Deflectometer (MSD)