Louis Ramirez, Jr. Email and Phone Number
• 10 years of field experience in construction management in heavy civil, luxury and multi-family• Managing the onsite project team and all trades, consultants, and vendors to meet schedule, and scope of project• Creating a healthy team environment and implementing company values on the project level with employees, subcontractors and vendors • Leading project planning, OAC meetings, inter-office coordination meetings, and construction site walks• Fluent in Spanish and English (written & oral) and excellent in business communication• Proficient in Buildertrend, Microsoft Office Suite, and certified in Procore, Bluebeam, OSHA and First Aid/CPR
Boyd Contracting Inc
View- Website:
- boydcontractinginc.com/about
- Employees:
- 6
-
SuperintendentBoyd Contracting IncLos Angeles, Ca, Us -
SuperintendentGary Drake Construction Jan 2023 - PresentBrentwood, California, United StatesSupervise the restoration, remodeling and retrofitting of a Paul Williams residence in Brentwood. Site walks with subcontractors, confirm contract scopes are accurate to what is required in the field, and schedule mobilization of subcontractors. Coordinate subcontractors and vendors for intricate constructability conditions such as Architect, lighting consultant, electrician, framer, fire sprinkler contractor and plumber for proper alignment of elements. Clarify concerns and questions for trades, or create RFI’s with potential solutions. Supervise, guide and direct five employees to assist and support subcontractors and vendors in fulfilling their scope. Walk site with city inspector and discuss scope inspected. Analyze plans and design sketches for constructability issues. Maintain plans, sketches, and room printouts updated. Maintain a daily log. Coordinate logistics for the delivery and movement of oversized equipment. Ascertain all activities related to the project follow city and safety ordinances. Assure QA and QC processes are being adhered to. Assure project is ultra clean and finished surfaces protected during construction and whilst owner occupies residence. Projects:Roxbury Dr.Westgate Ave.
-
Superintendent/ Project ManagerNwgc, Inc. Jun 2022 - Jan 2023La Verne, California, United StatesOverlook the day-to-day duties for the restoration of the Hafif House, a midcentury modern 8,000 sqft (50% existing/ 50% new construction) home designed by Foster Rhodes Jackson (fine carpentry by Sam Maloof). Supervise 12 employees to self-perform concrete, electrical, rough and fine carpentry, and waterproofing. Do historical research as to the restoration, recreation and add addition of more Desert Masonry walls, conceptualized by Frank Lloyd Wright. Work with Architects, Subcontractors and exotic materials Suppliers to recreate samples of original details. Procure difficult-to-locate sample materials. Created relationship with Owners to have samples approved. Pick up materials in personal truck for company scope. Describe scope and show site to pricing Subs and observing techs. Walk site and describe scope to County Inspector. Coordinate with Subs for complex details such as radiant flooring within interior concrete floors (subbed out): meet clients’ desired finish while avoiding cracks. Create RFI’s, and draw construction details for crew to better understand. Lead Monday morning “Jump-Off Meetings”. Review subs’ invoices. Do takeoffs and estimates. Create rain protection plan for open areas and rainy day schedule of interior scope.
-
Superintendent/ Project ManagerOcean Point Development, Inc. Jun 2021 - Jun 2022Malibu, California, United StatesAnalyzed, organized, updated and requested completion of all plans. Did takeoffs. Created scope for individual trades and bid packages. Invited contractors to bid. Created and presented Project Budget. Coordinated with Architects, Engineers, City Planning and Owners to complete permits. Created and executed contracts. Coordinated with Designers to complete schedules and placed orders for fixtures. Prepared site for mobilization. Had pre-con, pre-mob, weekly and intermittent meetings. Lead City inspection meetings with all levels of project concerned. Kept Owners abreast and assisted with design during changes. Requested pricing from contractors, vendors, priced work to be self-performed to fulfill Owner’s request and created change orders. Maintained cost-per-unit and man-hour production rates database. Lead team of 10 in self-performing framing, finish carpentry, drywall and masonry. Updated schedule with changes. Approved invoices. Created daily logs. Types of projects: new construction, remodel, restoration and retrofitting of hillside and high-end residences. Types of structures: slab-on grade foundations, raised foundations, basement/cast-in-place concrete podium decks. Moments of recognition: worked with County Planning and led Architect, Engineer, Trades, GC and Owner to receive permits and have plans approved after an arduous and complex process due to project being in a protected habitat and under protected trees; analyzed and worked with original equipment manufacturers to correct deficiencies with hillside on-site wastewater treatment system by subcontractor.Projects include:6300 Sycamore Meadows Dr.;25631 Timpangos Dr.;29685 Cuthbert Rd.;6935 Grasswood Ave.;28861 Selfridge Dr.; and7119 Fernhill Dr. -
Superintendent/ Project ManagerRoman James Design Build, Inc. Jun 2017 - Jun 2020Beverly Hills, California, United StatesAnalyzed deficiencies by previous GC and met with Grader and Concrete to resolve prior to continuation of new construction. Created schedules. Requested RFI’s with suggested solutions. Takeoffs, invited contractors to bid and reviewed proposals. Scheduled contractors and vendors. Maintained contact with upcoming trades as to the project's schedule and their availability. Conducted weekly meetings. Provided value-engineering options. Lead team of seven in self-performing pool. Made certain best managed practices were followed per erosion control plans. Created daily logs. All projects were high-end hillside residential buildings built on caissons and retaining walls, with concrete basements and cast-in-place podium decks. Moments of recognition: located a drill rig for concrete contractor to purchase when in high demand and difficult to locate, shortening time of project; built and maintained relationship with neighbors and LADBS City Inspectors.Projects include:9259 Robin Dr.;2034 Sunset Plaza Dr.;8365 Sunset View Dr.; and7729 Granito Dr. -
Estimator/ Project ManagerSuperior Gunite Oct 2016 - Jun 2017Los Angeles, California, United StatesProvided timely, cost-effective shotcrete estimates, and oversaw union/ prevailing wage projects to completion. Built relationships while coordinating field and office personnel, vendors, contractors, Architects, Engineers and Owners regarding on- and off-site activities. Reviewed and revised contracts and created subcontracts. Maintained organized files of official and internal documents. Projects included: multi-unit/mixed-used/high-rise/office space buildings (cast-in-place single and multi-story podium concrete structures), parking structures, bridges, dams, public/private schools, hospitals, government buildings, stadiums, retrofitting, subways, tunnels, airports, fountains, highways, landfills, hotels and aquariums. Moments of recognition: won projects for SpaceX and Disneyland.Sample projects include :SoFi Stadium;Kaiser Hospitals;Big Tujunga Dam;One World Trade Center Fountain;Santa Barbara Museum; andDodger Stadium. -
Site Manager/ Asst. Project ManagerJasco Enterprise, Inc Jul 2014 - Sep 2016Los Angeles, California, United StatesAssisted in managing projects through design, engineering, permitting and construction of multi-unit residential projects. Scheduled contractors, deputies and inspections. Invited to bid and assisted in the awarding of contracts to subcontractors and material providers. Collaborated with contractors for value-engineering options. Created punch lists. Assisted in creation and design of website and marketing material. Provided tours to future tenants of units and complex. All projects were concrete podium structures with wood framing.Projects include:12871 San Fernando Rd. - 18 Units;5338 Cartwright Ave. - 31 Units; and11721 Runnymede St. - 43 Units.
Louis Ramirez, Jr. Education Details
-
Bachelor Of Arts - Ba
Frequently Asked Questions about Louis Ramirez, Jr.
What company does Louis Ramirez, Jr. work for?
Louis Ramirez, Jr. works for Boyd Contracting Inc
What is Louis Ramirez, Jr.'s role at the current company?
Louis Ramirez, Jr.'s current role is Superintendent.
What schools did Louis Ramirez, Jr. attend?
Louis Ramirez, Jr. attended University Of California, Los Angeles.
Not the Louis Ramirez, Jr. you were looking for?
-
Louis Ramirez jr
Bakersfield, Ca -
-
Louis Ramirez Jr
Austin, Tx
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial