Engineer
CurrentPreparing cost-effective design layouts based on construction specifications and requirements.Analysing design issues and recommend corrective actions.Using BIM 360, revit architecture and auto cad to develop effective designs.Determining construction cost and material estimates based on civil designs.Review project plan and determine the design feasibilities and constraints.Managing design projects within allotted timelines and budgets.☛ Managing the projects and ensuring that the provided estimate is effective☛ Preparing detailed records of the estimate with a break-up, including material requirements and material cost as per the project requirement☛ Compiling the cost of the subcontractors and all the indirect cost that occurred in the project☛ Coordinating with the other departments and preparing technical proposals for the organization☛ Assisting the accounts department and preparing the billing documents.☛ Handling and preparing a list of all indirect cost that were incurred in the project such as the manpower, temporary facilities, and the other running expenses☛ Collecting and reviewing the inquiry documents