I have rich working knowledge in the construction of Highways, Roads, Bridges and Tunnel and possessing a total of nearly 14 years of experience.
Joint Venture Of Dasan, Kunhwa And Ict
-
Assistant Resident EngineerJoint Venture Of Dasan, Kunhwa And Ict Jun 2015 - PresentHo Chi Minh City, VietnamADB fundedThe project is part of Northern – Southern Expressway Project, starting at Ben Luc, LongAn Province - ending at Dong Nai Province, across Ho Chi Minh city in Vietnam. Length of the Expressway: 57.8 km grade-separated and access-controlled Expressway (carriageway from 4-8 lanes, speed 120 km/h), including 09 interchanges with toll booths and 06 Toll gate and systems of electric, communications, tolling and associated facilities. The Project includes 02 cable stayed Bridge are Binh… Show more ADB fundedThe project is part of Northern – Southern Expressway Project, starting at Ben Luc, LongAn Province - ending at Dong Nai Province, across Ho Chi Minh city in Vietnam. Length of the Expressway: 57.8 km grade-separated and access-controlled Expressway (carriageway from 4-8 lanes, speed 120 km/h), including 09 interchanges with toll booths and 06 Toll gate and systems of electric, communications, tolling and associated facilities. The Project includes 02 cable stayed Bridge are Binh Khanh with length 3.78 Km and Phuoc Khanh 3.79 Km. The construction period from 2015 to 2018Assistant Resident Engineer in performing the contractual duties on site:Scheduled the project in logical steps and budget time required to meet deadlines; liaised with the Employer, Engineer and Sub-contractors; determined labor requirements and dispatch workers to construction sites; inspected and reviewed projects to monitor compliance with building and safety codes, and other regulations; interpreted and explained plans and contract terms to administrative staff, workers, and clients, representing the owner or developer; prepared contracts and negotiate revisions, changes and additions to contractual agreements with, consultants, clients, suppliers and subcontractors; obtained all necessary permits and licenses. In additional, cooperation with highway Engineer to review and approve shop drawing, method statement documents for vary technical as soft soil treatment by PVD, compacted sand pile, deep mixed method (soil cement column), Variation order technical documents and as built drawing also. Coordinate with Quantity Surveyor to review and approve IPCs. Preparation of weekly, monthly report to submit Employer and Resident Engineer; Support Resident Engineer to organize and manage weekly and monthly meetings. Show less
-
Civil EngineerObayashi Corporation (Japanese Corp) Oct 2014 - May 2015Bolikhamxay Province, LaosProject is Nam Nghiep 1 Hydro power Project in LaosThe capacity 272 MW power, Construction Contract: 366 million US$,Tunnel length is 6781m, diameter 12m.Civil Engineer in charge for Diversion Tunnel in performing in duties on the site:- Tunnel construction method was followed the new Austria tunnel method (NATM)- Inspection for construction structural included deep excavation for portals in Inlet and Outlet.- Inspection subcontractor to construct tunnel in underground… Show more Project is Nam Nghiep 1 Hydro power Project in LaosThe capacity 272 MW power, Construction Contract: 366 million US$,Tunnel length is 6781m, diameter 12m.Civil Engineer in charge for Diversion Tunnel in performing in duties on the site:- Tunnel construction method was followed the new Austria tunnel method (NATM)- Inspection for construction structural included deep excavation for portals in Inlet and Outlet.- Inspection subcontractor to construct tunnel in underground by method statement blasting combine drilling Jambo.- Inspection and management for Construction Wire Mesh, shotcrete, rock bolt,Grouting and tunnel lining- Inspection, checking and acceptance with representative’ the Engineer also the Employer for constructed items Show less -
Chief Site EngineerDoosan Heavy Industries & Construction Aug 2012 - Sep 2014Yên Bai Province, VietnamADB fundedThe project is part of Kunming- HaiPhong Transport Corridor, starting at Noi Bai, Hanoi - ending at Lao Cai Province, across 4 big cities in Vietnam: Vinh Yen city, Viet Tri city, Yen Bai city and Lao Cai. Length of the highway: 265km grade-separated and access-controlled highway (carriageway from 2-6 lanes, speed 80-100 km/h), including 10 interchanges with toll booths and 5 service areas and systems of electric, communications, tolling and associated facilities; 119 viaducts… Show more ADB fundedThe project is part of Kunming- HaiPhong Transport Corridor, starting at Noi Bai, Hanoi - ending at Lao Cai Province, across 4 big cities in Vietnam: Vinh Yen city, Viet Tri city, Yen Bai city and Lao Cai. Length of the highway: 265km grade-separated and access-controlled highway (carriageway from 2-6 lanes, speed 80-100 km/h), including 10 interchanges with toll booths and 5 service areas and systems of electric, communications, tolling and associated facilities; 119 viaducts and a 530-meter tunnel; Total earthworkis 32,346,932 m3 and 45,528,025 m3 of excavation; The total quantity of piles 90,600 linear meters.in performing the contractual duties on site:Scheduled the project in logical steps and budget time required to meet deadlines; liaised with the Employer, Engineer and Sub-contractors; determined labor requirements and dispatch workers to construction sites; inspected and reviewed projects to monitor compliance with building and safety codes, and other regulations; interpreted and explained plans and contract terms to administrative staff, workers, and clients, representing the owner or developer; prepared contracts and negotiate revisions, changes and additions to contractual agreements with architects, consultants, clients, suppliers and subcontractors; obtained all necessary permits and licenses. Show less
-
Assistant Resident Engineer/Highway EngineerJv Of Meinhardt International Pte & Vjec Apr 2011 - Jun 2012Hai Phong City, VietnamForeign loanStarting on ring road No. III of Hanoi City, 1,025m away from the Northern abutment of Thanh Tri bridge towards BacNinh province, in Thuong Hoi hamlet, Thach Ban commune, Gia Lam district, Hanoi City and ending at Dinh Vu dam, Hai An district, HaiPhong city. The expressway is designed in conformity to expressway Class A standards with the total length of about 105.5km; 7 separate interchanges at intersections with national highways; 17 large bridges, 24 medium bridges, 22… Show more Foreign loanStarting on ring road No. III of Hanoi City, 1,025m away from the Northern abutment of Thanh Tri bridge towards BacNinh province, in Thuong Hoi hamlet, Thach Ban commune, Gia Lam district, Hanoi City and ending at Dinh Vu dam, Hai An district, HaiPhong city. The expressway is designed in conformity to expressway Class A standards with the total length of about 105.5km; 7 separate interchanges at intersections with national highways; 17 large bridges, 24 medium bridges, 22 flyovers (the total length of the bridges is about 14km); Design speed is 120km/h. The average width of the cross section is 100m, with six travel lanes (each travel lane is 3.75m wide), 2 emergency lanes, median strip, greenery strips on both sides of the expressway, frontage roads where necessary. The total investment of the Project is about VND46,900 billion. Show less
-
Deputy Resident EngineerConstruction Quality Assesment And Supervision Consultant., Jsc Oct 2009 - Mar 2011Vinh Phuc Province, VietnamWorld Bank funded Component A - Rehabilitation and improvement of about 3,100 km of the core rural roads network supports the rehabilitation of district, commune and village roads and bridges in 32 provinces in northern and central Vietnam to allow all-weather motorized vehicle access. Rehabilitation of Dai Tu - Trung Cam road link in Yen Lac District and Thai Hoa - BacBinh road link in Lap Thach District, VinhPhucProvince :This package include 17km length and 3.5m width.
-
Highway EngineerVietnam Institute Of Techlonogy Science And Transport (Itst) Oct 2006 - Sep 2009Hanoi, VietnamState FundedThe road intersecting NH3 at Km9+900, crossing NguHuyenKhe Canal and Duong River at Dong Tru Ferry, and passing Thuong Cat Commune, Gia Lam District, Hanoi and intersecting with Chui Bridge. Road class I - Urban, width 65m, speed 60-80km/h; 3 bridges including, Dong Tru Bridge is 55m in width and Dong Hoi Bridge 47m in length, Phuong Trach Bridge 35m in length. Total cost of the Project was VND6,700 billion
-
Supervisor EngineerMontgomery Watson Harza Co., Ltd (Mwh) Jul 2005 - Oct 2006Thanh Hoa Province, VietnamADB FundedRehabilitation about 1,666 km of provincial roads for 92 routes, largely of grade V (81 routes), grade IV (8 routes), grade III (3 routes), and a number of small bridges (not exceeding 6 meters long) of 18 northern provinces, including Son La, Lai Chau, Lao Cai, Yen Bai, BacKan, Thai Nguyen, PhuTho, VinhPhuc, Cao Bang, Lang Son, TuyenQuang, Ha Giang, QuangNinh, HoaBinh, Ha Tay, BacGiang, ThanhHoa and Ha Nam. Total cost investment was USD 100 million.
-
Site EngineerCivil Engineering Construction Corporation No.1 (Cienco1) Jun 2003 - Jul 2005Thai Nguyen Province, VietnamADB FundedRehabilitation about 1,666 km of provincial roads for 92 routes, largely of grade V (81 routes), grade IV (8 routes), grade III (3 routes), and a number of small bridges (not exceeding 6 meters long) of 18 northern provinces, including Son La, Lai Chau, Lao Cai, Yen Bai, BacKan, Thai Nguyen, PhuTho, VinhPhuc, Cao Bang, Lang Son, TuyenQuang, Ha Giang, QuangNinh, HoaBinh, Ha Tay, BacGiang, ThanhHoa and Ha Nam. Total cost investment was USD 100 million
Luan Ngo Van Skills
Luan Ngo Van Education Details
-
Ha Noi University Of Transport And CommunicationGood -
University Of Transport And Communication VietnamExcellent
Frequently Asked Questions about Luan Ngo Van
What company does Luan Ngo Van work for?
Luan Ngo Van works for Joint Venture Of Dasan, Kunhwa And Ict
What is Luan Ngo Van's role at the current company?
Luan Ngo Van's current role is Assistant Resident Engineer at Joint Venture of Dasan, Kunhwa and ICT.
What schools did Luan Ngo Van attend?
Luan Ngo Van attended Ha Noi University Of Transport And Communication, University Of Transport And Communication Vietnam.
What are some of Luan Ngo Van's interests?
Luan Ngo Van has interest in Internet, English, Sport, Economic Empowerment.
What skills is Luan Ngo Van known for?
Luan Ngo Van has skills like Primavera P6, Project Control, Epc, Project Estimation, Civil Engineering, Construction Management, Project Engineering, Cpm Scheduling, Construction, Quantity Surveying, Road, Ms Project.
Not the Luan Ngo Van you were looking for?
-
Ngô văn luân Ngô văn luân
Vietnam -
Luân Ngô Văn
Hanoi Capital Region -
1gmail.com
-
luan ngo van luan
Taiwan
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial