M. Sahlaa Email and Phone Number
I'm Sr. Electrical & Instrument Project Engineer & Supervisor with Physics Engineering background. I have been working in oil & gas construction both greenfield & brownfield projects. More than 14 years accomplished in the areas of Electrical & Instrument Engineering and Design, Electrical & Instrument Construction Supervision and Project Management in Multinational Oil and Gas Industries. Well knowledge and familiar with the recent electrical, instrumentation & control system technology, such as DCS, PLC, and SCADA, etc. Managed and worked on a diverse range of instrument engineering and design, construction, installation, pre-commissioning, commissioning and start-up, supply chain management, international code and standard implementation with all of it’s aspects to oil and gas facility, production and operation.
Pt. Asta Rekayasa Unggul
View- Website:
- ptarung.com
- Employees:
- 44
-
Engineering ManagerPt. Asta Rekayasa Unggul May 2022 - PresentKutai Kartanegara, East Kalimantan, IndonesiaProject - Pertamina Hulu Mahakam (ex. TOTAL E&P Indonesie): - Bekapai 3 – Surface Facilities Modification & Dogleg Installation (EPCIC) - Peciko 8B – Surface Facilities Modification & Booster Compressor Installation (EPCIC) - SWPG Debottlenecking – Surface Facilities Modification & Booster Compressor Installation (EPCIC) Job details:1. Planning, selecting, managing, provide clear & concise instructions, coordinating and supervising the work of multiple teams (the engineers, specialists and technicians) to execute the scope of work outlined in project proposal and completion projects on time 2. Collaborate with other management personnel and ensure the successful completion of projects on time and within budget 3. Monitor & review the work of multiple teams (the engineers, specialists and technicians) for technical accuracy, give the final approval of the design specification, drawing and others Engineering documents 4. Assist for implementation strategies and best practices during Construction activities according to Engineering Drawing and related documents 5. Assessment and finalization for Technical & Commercial proposal for Vendor’s and Sub-Contractor’s, and ensure all material bought as per project specification and scope of work document 6. Assist for negotiating contracts, additional and scope of project changing, securing permits and licenses7. Act as Project Manager to ensure the smooth progression of projects, when its necessary -
Senior Electrical And Instrumentation Field EngineerMedco E&P Indonesia Mar 2022 - Apr 2022Camplong, East Java, IndonesiaProject: New Instrument Air Compressor & Solar System InstallationResponsibilities:1. Prepare, check and final review for electrical and instrument documents project for construction2. Monitor all construction works (Schedules & execution) and make sure all materials installed asspec, P&ID, Isometric diagram, Single Line Diagram, Plot plant, ESD Logic Diagram, cause andeffect diagram and scope of work document3. Manage contractor project team/s on-site and off-site in line with the implementation strategies and best practices for construction activities according to Engineering Drawing and related documents (specification, requisition and datasheet)4. Review and manage Pre-commissioning procedures and equipment schedules; include calibration and installation of Electrical & Instrumentation in the construction site5. Review and manage Commissioning plans/additional plan procedures and schedules until the startup and can be operated by the operator6. Manage the troubleshooting plan during construction, pre-commissioning & commissioning, and also doing the modification, if necessary -
Senior Electrical & Instrumentation Field EngineerExxonmobil Indonesia Jun 2021 - Feb 2022Cepu, Central Java, IndonesiaProject: Jimbaran Tiung Biru (JTB) Tie-inResponsibilities:1. Prepare, check and final review for electrical and instrument documents project for construction2. Monitor all construction works (Schedules & execution) and make sure all materials installed asspec, P&ID, Isometric diagram, Single Line Diagram, Plot plant, ESD Logic Diagram, cause andeffect diagram and scope of work document3. Manage contractor project team/s on-site and off-site in line with the implementation strategies and best practices for construction activities according to Engineering Drawing and related documents (specification, requisition and datasheet)4. Review and manage Pre-commissioning procedures and equipment schedules; include calibration and installation of Electrical & Instrumentation in the construction site5. Review and manage Commissioning plans/additional plan procedures and schedules until the startup and can be operated by the operator6. Manage the troubleshooting plan during construction, pre-commissioning & commissioning, and also doing the modification, if necessary
-
Site Project ManagerPt. Wira Cipta Perkasa Oct 2020 - Jun 2021Bojonegoro Regency, East Java, IndonesiaProject: Power Plant Development PERTAMINA EP Asset 4 Sukowati Field Pad A & Pad B1. Managing, coordinating and supervising the construction team/workers2. Monitor all construction works (Schedules & executing) in-line with the time target and the budget3. Make sure all material installed as project specification & drawings (Single Line diagram, Equipment Layout, ESD Logic Diagram, cause and effect diagram and scope of work document)4. Checking & preparing site report (daily, weekly & monthly progress report), designs and drawings; and report it to the project manager & the client5. Ensure the safety of the construction, the team and site workers6. Troubleshoot & finding ways to prevent problems any issues that may arise and to solve any that crop up7. Maintaining quality control procedures8. Helping to negotiating contracts, additional and scope changing, securing permits and licenses
-
Senior Electrical And Instrumentation EngineerPt. Virama Karya Persero Nov 2017 - Sep 2020Jakarta, Indonesia1. Check & review all Electrical & Instrument document that used for bidding and unwishing wasin-line with the grand design of the plant2. Prepare, design & create all Electrical & Instrument Front End Engineering Design (Single LineDiagram, P&ID, General Electrical & Instrument Layout, ITP, Electrical & Instrumentation ProjectSpecification & Datasheet,) refers to Local & International standard while in bidding and unwishingdocument was not created.3. Supervise & final review for All Electrical & Instrumentation documents that detailed by Contractor4. Manage contractor project team/s on-site and off-site in line with the implementationstrategies and best practices for Construction activities according to Engineering Drawing andDocument5. Monitor all construction works (Schedules & executing) and make sure all material installed asspec, P&ID, Isometric diagram, Single Line Diagram, Plot plant, ESD Logic Diagram, cause andeffect diagram and scope of work document.6. Create (if necessary), review, and Manage Pre-commissioning procedures and equipment’sschedules; include calibration and installation of electrical, instrumentation, mechanical andpiping equipment in the field.7. Review and manage Commissioning plan/additional plan procedure and schedules until start-upand can be operated by the operator.8. Manage the troubleshooting plan during commissioning and modification, if necessary.Project:- Lamongan Oil Tank Terminal – HSD Oil sector – Constructed by PT. Wijaya Karya- Lamongan Oil Tank Terminal – LNG Plan sector – Basic Design Engineering -
Electrical & Instrument Site Engineer CoordinatorPertamina Ep Apr 2017 - Nov 2017Cirebon - Indonesia1. On Behalf PT. Pertamina EP, as consultant in charge, check & maintain all contractor materialavailability & needed during project started until finish2. On Behalf PT. Pertamina EP, as consultant in charge, do verification and/or approved ofengineering electrical & instrument documents and drawings3. Manage contractor and PMC Engineer team/s on-site and off-site in-line with theimplementation strategies and best practices for Construction activities according toEngineering Drawing and Document4. To manage, supervise, control and monitor the project construction works (Schedules &executing) until commissioning and start up in order to ascertain that the plant will be built asper drawings, specifications, procedures, quality and schedule, and make sure all materialinstalled as spec, P&ID, Isometric diagram, Single Line diagram, Plot plant, ESD Logic Diagram,cause and effect diagram and scope of work document5. To manage, supervise, control and monitor the troubleshooting plan during commissioningand modification, if necessary6. Maintain good relationships with Contractors, being flexible enough but also strict whennecessary to achieve the objectives of the projectProject:- Gas Turbine Generator Replacement and New Installation at Pertamina EP X-Ray FieldJatibarang (offshore) – PERTAMINA EP Asset 3 -
Instrument Supervisor & Project EngineeringTotal E&P Indonesie Sep 2014 - Dec 2016East Kalimantan Province, Indonesia1. Inspection survey/Site Survey before project plant started and before continues running plantfor make sure remaining item shall be completed.2. Prepare, check & maintain all material availablility & needed during project started until finish.3. Prepare & check all data project for construction using PRODOM access program.4. Modify and make new Hydraulic control wells system & Pneumatic control wells system.5. Monitor all works, Scheduled, executing and make sure all material installed as spec, P&ID,Isometric diagram, Plot plant, ESD Logic Diagram, coursed and effect diagram and scope ofwork document, from field instrumentation until to RTU (Remote Terminal Unit).6. Pre-commissioning equipments to makes sure the point ranges of equipments; includecalibration and installation of instrumentation equipment in the field.7. Commissioning plant/additional plant until can operated by operator.8. Trouble shooting during commissioning and modification if necessary then data will revise asactual installation.9. Coordinate with others department to connect to existing for operated production Teams.10. Scheduling, preventive, corrective maintenance after project.Project:- Well Connection Sisi Nubi 2B Project, TOTAL E&P Indonesie- Well Connection Tunu Development 13C Phase, TOTAL E&P Indonesie- Well Connection TATUN Development Phase, TOTAL E&P Indonesie -
Electrical & Instrument Project Lead EngineerPt. Meindo Elang Indah May 2013 - Sep 2014Handil, East Kalimantan1. Manage client interactions at all levels as the capital to achieve success2. Manage project team/s on-site and off-site in line with the implementation strategies and best practices for Checking and Reviewing Detailed Design from Sub-Contractor including Electrical Drawing and Documents (Single Line Drawing, Datasheet, Specification, Electrical Layout, etc), Instrument Drawings and Documents (Block Diagram, Schematic of Hydraulic Control Panel, RTU arrangement drawing, Datasheet, Instrument Layout, Instrument Detail Drawing, Specification, etc), request for quotation (RFQ), technical bid evaluation (TBE), and vendor review.3. Manage project team/s on-site and off-site in line with the implementation strategies and best practices for Construction activities according to Engineering Drawing and Document.4. Collaborate with other management groups on human resource, skill, and process deployments to uphold the quality hallmark on project deliverables5. Seek and implement continuous improvements to ensure success with assist all Vendor, Sub-Contractor and Client for Engineering, Installation & Commissioning phases. Project:- Detailed Engineering & Project Construction, PECIKO 7C ProjectTOTAL E&P Indonesie Duration: 12 month- Detailed Engineering & Project Construction, New Pipeline Installation NPU Area ProjectTOTAL E&P IndonesieDuration: 12 month
-
Project ManagerPt. Metrix Inspira Apr 2009 - May 2013Surabaya Area, East Java, Indonesia-Managing and leading the project team.-Define the scope of the project & detail work plan in collaboration with senior management-Determine the resources (time, money, equipment, etc) required to complete the project-Develop a schedule for project completion that effectively allocates the resources -Review the project schedule with senior management and all other staff that will be affectedby the project activities; revise the schedule as required-In consultation with the appropriate manager, recruit, interview, select and manage staff and/or volunteers with appropriate skills for the project activities-Contract qualified consultants to work on the project as appropriate-Final approval & execute the project according to the project plan-Develop forms and records to document project activities-Monitor the progress of the project and make adjustments as necessary to ensure thesuccessful completion of the project & meets business needs-Establish a communication schedule to update and working closely with the clients includingappropriate staff in the organization on the progress of the project-Recording and managing project issues and escalating where necessary.-Resolving cross-functional issues at project level.-Review the quality of the work completed with the project team on a regular basis to ensurethat it meets the project standards-Prepare financial reports and others reports on the project (include supporting documents) formanagement-Monitor and approve all budgeted project expenditures-Monitor cash flow projections and report actual cash flow and variance to senior managementon a regular basis (monthly/bimonthly)-Manage all project funds according to established company accounting policies and procedures-Ensure that all financial records for the project are up to date & deliverable are on time-Evaluate the outcomes of the project as established during the planning phase -
Project EngineerPt. Ks Technology Jan 2008 - Mar 2009Batam, IndonesiaResponsibility:1. Manage one or more project/s or parts thereof to successful completion2. Manage client interactions at all levels as the capital to achieve success3. Manage project team/s on-site and off-site in line with the implementation strategies and best practices4. Collaborate with other management groups on human resource, skill, and process deployments to uphold the quality hallmark on project deliverables5. Generate and keep current all documentation, including project and resource plans, commitment, risk and mitigation registers6. Adhere to and enforce project reporting procedures7. Preparation Man Hours Management and Planning Department Activities and estimate cost in globally and details8. Seek and implement continuous improvements to ensure success Project:- Design, Automation and Installation of Platform and Ship Lighting DistributionNorce Offshore Pte, Ltd.Duration: 9 months- Energy Saving Using 300kVAr Capacitor Bank And Inverter For Motors And PumpsPT. McDermott IndonesiaDuration: 6 months- Automation of Well Head Control Panel Using Redundant System Hot StandbyPT. PetroTech Indonesia.Duration: 4 month - Manual and Automatic Transfer Switch (ATS) System PT. McDermott IndonesiaDuration: 3 months (accomplish).- Automation of Chiller Control System and Integration of Power Management SystemPT. Panasonic Syikoku Electronics BatamDuration: 5 month- Automation of Natuna Sea Ship AHU SystemPT. McDermott IndonesiaDuration: 3 month- Power Management and Energy Savings System, Production Line Design and Setup, Make Quality Test Machine and Maintenance all Power and Instrument cables. PT. Schneider Electrics Manufacturing Batam Duration: 1 year
-
Instrument EngineerPt. Pura Green Energy Sep 2006 - Dec 2007Kudus, Central Java, IndonesiaResponsibility:1. Doing research to bio oil parameters, fossil fuel parameters and examination procedures so that get the accurate and simplest ways to measure, to detecting and identifying the parameters2. Collecting and maintaining, choosing instrument and data updates related to fuels for engines, burner or combustion engines that fossil fuel or bio oil used3. Preparation instrument datasheet, instrument index, request for quotation (RFQ), technical bid evaluation (TBE), and vendor review4. Review & check detail drawing i.e. P & ID, loop & wiring diagram, PLC I/O List, and instrument layout etcProject:- Bio Oil at Gunung Kidul DevelopmentPT. PURA GREEN ENERGY - PURA GROUP Development
M. Sahlaa Education Details
-
Institute Technology Of Sepuluh November SurabayaAutomation And Instrumentation Control -
Sman 5, SurabayaScience
Frequently Asked Questions about M. Sahlaa
What company does M. Sahlaa work for?
M. Sahlaa works for Pt. Asta Rekayasa Unggul
What is M. Sahlaa's role at the current company?
M. Sahlaa's current role is Sr. E&I Engineer Lead, Engineering Manager, Site Manager, Project Manager.
What schools did M. Sahlaa attend?
M. Sahlaa attended Institute Technology Of Sepuluh November Surabaya, Sman 5, Surabaya.
Who are M. Sahlaa's colleagues?
M. Sahlaa's colleagues are Lefriano Redo, Priska Std., Lukas Efrianto Lambe, Wahyu Abdillah, Maswen Muning, Zhafira Cantiq, Willy Saputra Sitompul.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial