I have approximately 9 years of experience in the construction field as a construction supervisor in different companies and different site locations my areas of expertise are as: Marine ConstructionSupervising all the lifting operations including complex lifting, Super-lifts, Tendum liftsBreakwater construction core rock dumping, underlayer and armor rock placing.Site logistics handling as well as offshore logistic handling. Quay wall construction - Trench preparation, screeding & levelling, block placing.Offshore pipeline works – Seabed clearance work, pipe launching, slipway preparation, load out jetty construction, diving team co-ordinationBoat ramp construction, Pontoon assembling, Beach development.Tubular piling, Pre-Cast Block & In situ Block castingSecant pile construction. Onshore excavation & DredgingPrecast of ballast block & Installation on pipeline.Progress Monitoring Work force & Equipment management
-
Construction SupervisorPlc Contracting Llc Apr 2023 - Jul 2024Oman -
ForemanPlc Contracting L.L.C Apr 2023 - Jul 2024Assigned as Foreman for Marine project in Oman Project: New Sea Cooling Water Outfall Project Oman Client: Oman LNGRoles & Responsibilities:Oman LNG Authorized Permit HolderCertified Lifting Supervisor, handling all the lifting operations including complex lifting i-e tendum lifting etc.Onshore excavation & Dredging Secant pile construction. Precast of ballast block & Installation on pipeline.2.0m diameter HDPE… Show more Assigned as Foreman for Marine project in Oman Project: New Sea Cooling Water Outfall Project Oman Client: Oman LNGRoles & Responsibilities:Oman LNG Authorized Permit HolderCertified Lifting Supervisor, handling all the lifting operations including complex lifting i-e tendum lifting etc.Onshore excavation & Dredging Secant pile construction. Precast of ballast block & Installation on pipeline.2.0m diameter HDPE Pipe Welding & installation.Preparation of temporary bunds & launch platforms.Offshore pipe installationPlacement of different rocks, bedding & backfilling, under layers, 300-500Kg, 01T to 3T Armor rocks.Daily reporting about progress & implementing the work schedule as per work plan.Work force & Equipment management Show less
-
SupervisorJan De Nul Dredging And Land Reclamation Ltd. Apr 2021 - Apr 2022Preparation of the temporary jetty by pitching the sheet piles and backfilling the area. Loading and shifting the GRP pipes, pre-inspection of the GRP pipes before joining. GRP pipe joining using sea horse technology onshore and offshore, manual joining of the pipe on pipe joining bay consisting of rollers and mechanical jacks pushing mechanism Complete inspection of the jointed GRP pipes including the inspection of joining gaps.Fixing of saddles and mechanical jacks to… Show more Preparation of the temporary jetty by pitching the sheet piles and backfilling the area. Loading and shifting the GRP pipes, pre-inspection of the GRP pipes before joining. GRP pipe joining using sea horse technology onshore and offshore, manual joining of the pipe on pipe joining bay consisting of rollers and mechanical jacks pushing mechanism Complete inspection of the jointed GRP pipes including the inspection of joining gaps.Fixing of saddles and mechanical jacks to prepare the pipe for offshore joining, jetty logistics handling all of the lifting operations performed on jetty. Show less
-
FormanOverseas Ast Llc Co. Dubai Sep 2018 - Apr 2021Sharjah Emirate, United Arab EmiratesJetty logistics handling all of the lifting operations performed on jetty.GRP pipe joining using sea horse technology onshore and offshore.Manual joining of the pipe on pipe joining bay consisting of rollers and mechanical jacks pushing mechanism.Fixing of saddles and mechanical jacks to prepare the pipe for offshore joining.Aggregate loading using rock tray, rock loading using the ramp jetty on barges,breakwater construction. Precasting and… Show more Jetty logistics handling all of the lifting operations performed on jetty.GRP pipe joining using sea horse technology onshore and offshore.Manual joining of the pipe on pipe joining bay consisting of rollers and mechanical jacks pushing mechanism.Fixing of saddles and mechanical jacks to prepare the pipe for offshore joining.Aggregate loading using rock tray, rock loading using the ramp jetty on barges,breakwater construction. Precasting and erection of core loc. Precasting of intake head blocks and mobilizing them on barges. Stocking of offshore excavated material and then managing the loading of excavated material in dump trucks to send out of site. Show less
-
SupervisorDubai Harbour Sep 2018 - Apr 2021Stocking and handling of quay wall blocks in the stocking yard. Mobilising of the blocks from stock yard to jetty and loading them on the barges according to the placement requirment. Offshore screeding using the screeding frame with the help of divers for making the leveled bed to place quay wall blocks.Placing of quay wall blocks from the land with the help of super-lift cranes.Placing of quay wall blocks from the crane barges.In-situ caping beam… Show more Stocking and handling of quay wall blocks in the stocking yard. Mobilising of the blocks from stock yard to jetty and loading them on the barges according to the placement requirment. Offshore screeding using the screeding frame with the help of divers for making the leveled bed to place quay wall blocks.Placing of quay wall blocks from the land with the help of super-lift cranes.Placing of quay wall blocks from the crane barges.In-situ caping beam casting on top of quay wall.Anchor barge shifting and mobilising from one area to other.Handling all of the marine team and providing them the required machinery for shifting of the barges including 4nos of crane barges, 1no of excavator barge and 6nos of cargo barges.Site logistics handling as well as offshore logistic handling. Shifting of cargo barges from jetty to the required barge. Tublar piles shifting to offshore using the floating method by closing both of ends of the piles.Driving of the tublar piles from the barge for the placement of pier structure.Pier structure slabs loading on barges.Concrete pontoons placement in water, adjusting the pontoon's level by placing thermocole and mobilization of the pontoon in water using the boat and fixing of the pontoons. Show less
-
FormanDubai Creek Sep 2018 - Apr 2021HDPE pipe allignment on the rollers and joining them with the help of butt fusion welding machanism.Sinkage of pipeline into the water and joining to the other onshore end.Collar blocks casting for HDPE pipe line and fixing of those blocks on the pipelin.Driving of tublar piles for the pontoons in the marine through the crane barge.Offshore excavation of sand using excavator barge.
-
ForemanZkb Jan 2016 - May 2018Reviewing and adjusting specific workface activities and task schedules to meet established production schedules.Identifying, verifying and reporting any scheduling conflicts with other crews and contractors to the appropriate persons.Assisting site management for required resources.Controlling form work, concreting and steel fixing job for bridge abutments, piers, and superstructures.Handling precast concrete beams and panels for bridges.Earth work… Show more Reviewing and adjusting specific workface activities and task schedules to meet established production schedules.Identifying, verifying and reporting any scheduling conflicts with other crews and contractors to the appropriate persons.Assisting site management for required resources.Controlling form work, concreting and steel fixing job for bridge abutments, piers, and superstructures.Handling precast concrete beams and panels for bridges.Earth work cutting and filling for road works.Controlling infrastructure storm water and services alongside the road.Protection for existing services in road work.Quality toolbox talk with site teams.Identification of safety associated risk and mitigation plan for different activities.Daily and monthly progress report for assigned areas.Material reconciliation for reinforcement and concrete.Handling sub-contractors for paving blocks and services.Supervision of concrete repairing and finishing work.Overseeing the execution of the work, including quality and production, by ensuring that the crews work to job specifications and follow drawingsCompleting quality control reports when requiredReviewing time cards for plant and manpower. Show less
Maaz Asad Education Details
-
Hazara University (Government Post Graduate College Abbottabad)Physics -
Hazara University (Government Post Graduate College Abbottabad)Electronics, Mathematics, Physics -
Modern School System And College, AbbottabadSecondary School
Frequently Asked Questions about Maaz Asad
What schools did Maaz Asad attend?
Maaz Asad attended Hazara University (Government Post Graduate College Abbottabad), Hazara University (Government Post Graduate College Abbottabad), Modern School System And College, Abbottabad.
Not the Maaz Asad you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial