Mahesh Acharya is a Design Engineer at EastConsult (P) Ltd. at EastConsult (P) Ltd.. He possess expertise in autocad, civil engineering, highways, earthworks, water supply and 12 more skills. He is proficient in Hindi and English.
Eastconsult (P) Ltd.
-
Design EngineerEastconsult (P) Ltd. Dec 2014 - PresentHumla, NepalNew Road Construction Supervision and Stage 2 Survey and Design of Salisalla – Darma Road (14.4 km) and Galphagad – Shreenagar – Kalika Road (12.2 km), Humla District (Total 26.6 km, hill road).Fixed the centerline of the alignment, assisted survey team in conducting detailed survey of the alignment area, performed horizontal and vertical design of the alignment in Smart Road 2011, quantity estimate, rate analysis and cost estimate of the project, prepared working drawings required for the second stage construction for Client: Rural Access Programme Phase 3 (RAP-3).
-
Team Leader/Design EngineerEastconsult (P) Ltd. Feb 2014 - Nov 2014Kathmandu, NepalDetailed Survey, Design and IEE for Road Improvement Works of Jhapa (20 km), Morang (14.8 km) and Sankhuwasabha Districts (25.5 km) (Total 60.3 km, hill and plain road), Jhapa, Morang and Sankhuwasabh Districts. Activities Performed: Overall management of the team, fixed the centerline of the alignment, assisted survey team in conducting detailed survey of the alignment area, conducted road inventory to assess the condition of existing structure, performed horizontal and vertical design of the alignment in Smart Road 2011, quantity estimate, rate analysis and cost estimate of the project, prepared working drawings required for the tendering of the work, prepared bid documents and necessary reports such as Inception report, Final Reports etc. Client: Rural Access Programme Phase 3 (RAP-3).
-
Team Leader / Highway EngineerEastconsult (P) Ltd. Sep 2013 - Jan 2014Kathmandu, NepalStage 1 Detailed Survey, Design and IEE of Gamgadhi – Dhaina - Dulachaur Road (21 km Environmental Friendly Rural Road), Mugu District. Activities Performed: Fixed the centerline of the alignment, assisted the survey team in conducting detailed survey of the alignment, prepared topographical map of the area, designed horizontal and vertical alignment, prepared plan, profile and cross section, conducted quantity estimate, rate analysis and cost estimate of the work and prepared necessary reports such as Inception report, Field report and Final report. Client: Rural Access Programme Phase 3 (RAP-3).
-
Road Design EngineerEastconsult (P) Ltd. Jul 2013 - Sep 2013Kathmandu, NepalConstruction Supervision of Improvement Work of Dolakha – Singati Public Access Road (35 km, hill road) for Upper Tamakoshi Hydro Electric Project, Dolakha District. Activities Performed: Horizontal and vertical design of the road for improvement works, quantity estimate, rate analysis and cost estimate of the work, assisted the team leader in preparation of various reports. Client: Upper Tamakoshi Hydroelectric Project.
-
Associate DirectorEastconsult (P) Ltd Nov 2010 - PresentKathmandu
-
Cad Specialist (International Expert)Snowy Mountains Engineering Corporation Limited Apr 2013 - Jul 2013South Tarawa, KiribatiSouth Tarawa Sanitation Improvement Sector Project, South Tarawa, Kiribati. Activities Performed: Supported the works of the Project Implementation Unit (PIU) consultants and prepared the plans and details for inclusion in the tender and contract documents and for implementation of the proposed civil works, provided on-the-job training to relevant government counterparts. Client: Ministry of Public Work and Utilities, Tarawa, Kiribati. -
Road Design EngineerEastconsult (P) Ltd. Dec 2012 - Mar 2013Kathmandu, NepalConstruction Supervision of Improvement Work of Dolakha – Singati Public Access Road (35 km, hill road) for Upper Tamakoshi Hydro Electric Project, Dolakha District. Activities Performed: Horizontal and vertical design of the road for improvement works, quantity estimate, rate analysis and cost estimate of the work, assisted the team leader in preparation of various reports. Client: Upper Tamakoshi Hydroelectric Project.
-
Cad Expert Cum Civil EngineerEastconsult (P) Ltd. Sep 2012 - Nov 2012Kathmandu, NepalAssessment of 3 Bridges from Khadichaur to Charikot Sector of Lamosangu – Jiri Road, Dolakha District. Activities Performed: Conducted field visit along with the team leader for visual inspection of the bridges, assisted the team leader in conducting measurements of the bridges, estimated the cost required for upgrading works and assisted the team leader in preparing various reports. Client: Upper Tamakoshi Hydroelectric Project.
-
Procurement SpecialistEastconsult (P) Ltd. May 2012 - Aug 2012Kathmandu, NepalDetailed Design of Ichchhuk Sanskritik Pratisthan Building, Kathmandu District. Activities Performed: Prepared bid documents, assisted in Client in preparing and publishing the tender notice, assisted the client in evaluation of tender documents (Technical and Financial Proposals) submitted by the Contractor, assisted the Client in preparation of various documents required for the award of the contract to the Contractor. Client: Ichchhuk Sanskritik Pratisthan, Kathmandu.
-
Cad Expert/Road Design Engineer/Quantity SurveyorEastconsult (P) Ltd. Feb 2012 - Apr 2012Kathmandu, NepalDetailed Design of Tadi Khola Bridge, Nuwakot District. Activities Performed: Prepared topographical map of the project area, prepared structural drawings of foundation, sub structures and super structures of the bridge, designed plan, profile and cross sections of the access road connecting bridge side on both ends, estimated quantity and cost required for the construction of the bridge and access road, assisted the team leader in preparation of reports and presentation. Client: Central Division Road Office No. 5, Department of Roads.
-
Road Design EngineerEastconsult (P) Ltd. Jan 2011 - Oct 2011Kathmandu, NepalDetailed Engineering Survey, Design and Estimate of Mangalbare – Dhuseni – Gajurmukhi Dham – Ivang Road (19.9 km, hill road) for Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP), Ilam District. Activities Performed: Conducted detailed design of the road, carried out quantity estimate, rate analysis and cost estimate, prepared working drawings for the construction work and prepared various reports and presentation. Client: Office of District Development Committee, Ilam.
-
Road Design Engineer And Cad ExpertEastconsult (P) Ltd. Jun 2010 - Dec 2010Rukum, NepalConstruction Supervision, Quality Control and Other Technical Support for Motorable Bridge Over Sani Bheri at Phalamegaunda, Rukum (Contract No. 01/SBP/065/66), Rukum District. Activities Performed: Assisted the survey team in detailed survey of the road, Conducted detailed design of the road, carried out quantity estimate, rate analysis and cost estimate, prepared working drawings for the construction work and assisted the Team Leader / Bridge Engineer in preparation of inception report, field report and monthly progress report. Client: Rural Road Bridge Programme, Department of Local Infrastructure Development and Agricultural Roads, Jawalakhel, Lalitpur.
-
Senior EngineerEastconsult (P) Ltd. Jul 2008 - Oct 2010Kathmandu
-
Cad Expert/Road Design Engineer/Quantity SurveyorEastconsult (P) Ltd. Apr 2010 - May 2010Kathmandu, NepalDetailed Engineering Survey and Design of Bheri River Bridge (77.4m span steel truss bridge), Jajarkot District. Activities Performed: Under the guidance of team leader selected appropriate bridge site with consideration of access road, guided the survey team for detailed survey of bridge site and access road to the nearest road head, prepared topographical map of the project area, conducted detailed design of access road, prepared structural drawings of foundation, sub structures and super structure of steel truss bridge, quantity estimate, rate analysis and cost estimate of the bridge and access road, assisted team leader in preparation of reports and presentation. Client: Bridge Project, Department of Roads.
-
Cad Expert/Road Design Engineer/Quantity SurveyorEastconsult (P) Ltd. Feb 2010 - Mar 2010Kathmandu, NepalDetailed Engineering Survey and Design of Tamor River Bridge (6X25m span RCC bridge) for Tamor Storage Hydropower Project, Panchthar District. Activities Performed: Under the guidance of team leader selected appropriate bridge site with consideration of access road, guided the survey team for detailed survey of bridge site and access road to the nearest road head, prepared topographical map of the project area, conducted detailed design of access road, prepared structural drawings of foundation, sub structures and super structure of RCC bridge, quantity estimate, rate analysis and cost estimate of the bridge and access road, assisted team leader in preparation of reports and presentation. Client: Engineering Services, Nepal Electricity Authority.
-
Cad Expert/Road Design Engineer/Quantity SurveyorEastconsult (P) Ltd. Jun 2009 - Jan 2010Kathmandu, NepalDetailed Engineering Survey and Design of 9 Bridges (Jum Khola Bridge 2X25m span RCC, Chaklighat Bridge 1X25m span RCC, Medha Bridge 6X25m span RCC, Rakam Karnali Bridge 6X25m span RCC, Rabatkot Bridge 2X25m span RCC, Devsthal Rakam Bridge 1X20m span RCC, Ghimni Khola Bridge 1X20m span RCC, Dumuwa Khola Bridge 3X22m RCC, Narayanpur Bridge 8X25m span RCC, bridge) in Banke, Salyan, Surkhet, Dailekh and Rukum Districts (Contract No. BU-DSD-23/065/66). Activities Performed: Under the guidance of team leader selected appropriate bridge site with consideration of access road, guided the survey team for detailed survey of bridge site and access road to the nearest road head, prepared topographical map of the project area, conducted detailed design of access road, prepared structural drawings of foundation, sub structures and super structure of RCC bridge, quantity estimate, rate analysis and cost estimate of the bridge and access road, assisted team leader in preparation of reports and presentation. Client: Bridge Project, Department of Roads.
-
Road Design EngineerEast Surveying Company (P) Ltd. Apr 2009 - May 2009KathmanduDetailed Engineering Survey, Design and Estimate of Namdu – Mabu – Kshetrapa – Jugu Road (20.2 km, hill road) for Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP). Activities Performed: Conducted detailed design of the road, carried out quantity estimate, rate analysis and cost estimate, prepared working drawings for the construction work and prepared various reports and presentation. Client: District Road Support Program.
-
Road Design EngineerEast Surveying Company (P) Ltd. Jan 2009 - Mar 2009Kathmandu, NepalDetailed Engineering Survey, Design and Estimate of Sunkhani – Kanpa Road (27.39 km, hill road) for Rural Reconstruction and Rehabilitation Sector Development Program (RRRSDP), Dolakha District. Activities Performed: Conducted detailed design of the road, carried out quantity estimate, rate analysis and cost estimate, prepared working drawings for the construction work and prepared various reports and presentation. Client: District Road Support Program.
-
Cad Expert/Road Design Engineer/Quantity SurveyorEastconsult (P) Ltd. Sep 2008 - Dec 2008Kathmandu, NepalDetailed Engineering Survey and Design of 9 Bridges (Chamati Bridge 2X17.6m span RCC, Salinadi Bridge 1X25m span RCC, Kankeshwori 2X20m span RCC, Manamati Bridge 1X16m span RCC, Ghatte Khola Bridge 1X16m span RCC, Manohara Bridge 2X20m span RCC, Bagmati Bridge 3X20m span RCC, Khani Khola Bridge 2X20m span RCC, Bhaluwahi River Bridge 3X20m span RCC in Kathmandu, Lalitpur and Parsa Districts. Activities Performed: Under the guidance of team leader selected appropriate bridge site with consideration of access road, guided the survey team for detailed survey of bridge site and access road to the nearest road head, prepared topographical map of the project area, conducted detailed design of access road, prepared structural drawings of foundation, sub structures and super structure of RCC bridge, quantity estimate, rate analysis and cost estimate of the bridge and access road, assisted team leader in preparation of reports and presentation. Client: Bridge Unit, Department of Roads.
-
Highway EngineerEastconsult (P) Ltd. Jul 2008 - Aug 2008KathmanduDetailed Engineering Survey, Design and Estimate of Access Road (10.5km, hill road) of West Seti Hydro Project, Doti District. Activities Performed: Conducted detailed design of the road, carried out quantity estimate, rate analysis and cost estimate, prepared working drawings for the construction work and prepared various reports and presentation. Client: West Seti Hydro.
-
Cad Design Engineer (Highway)Full Bright Consultancy (P) Ltd. May 2007 - Jun 2008KathmanduConsulting Services to the Road Sector Development Project (RSDP) the project to be implemented by Department of Roads (DoR), Government of Nepal. Activities Performed: Review and update on the road/highway design software including data input requirement, processing and outputs presentation; Prepared standard design and drawings templates for road and other structural and ancillary works; Input/import detailed topographic survey data and carry out processing works; Prepared and produced detailed design stage drawings (plan, profiles, sections etc.) and finalization of road design and other works; Assisted Highway Design Engineer in calculation of item quantities; Assist and take inputs of Engineers and specialists for optimal design and assist in Resettlement Plan preparation and Land Acquisition Plans. Client: Department of Roads. The project involved Detail Engineering Survey, Design and Construction Supervision of (i) Khodpe – Chainpur (107 km, hill road), Bajhang District; (ii) Satbanjh – Gokuleshwor (53 km, hill road), Baitadi, Darchula District; (iii) Satbanjh – Jhulaghat (37 km, hill road), Baitadi District; (iv) Surkhet – Kalikot – Manam (153 km, hill road), Surkhet , Dailekh, Kalikot District; (v) TalloDhungeshwor – Siyakot (8 km, hill road), Dailekh District.
-
Autocad Expert Cum Civil EngineerProject Engineering Consultancy And Research (P.) Ltd. Nov 2006 - Apr 2007Kathmandu, NepalPreparation of topographical maps and structural drawings for preparation of Master Plan of River Training Work of Biring River of Jhapa District. Activities Performed: Preparation of topographical maps and structural drawings required for river training works under the guidance of Team Leader Client: Department of Water Induced Disaster Prevention.
-
Civil EngineerEnvironmental Resources Group (P) Ltd. Jun 2006 - Nov 2006Kathmandu, NepalPreparation of Initial Environmental Examination report of Mai Khola Hydropower Project in Ilam District. Activities Performed: Assisted the team in preparation of Initial Environmental Examination Report by providing input of physical environment. Client: Mai Khola Hydropower Project.
-
Cad Expert Cum Civil EngineerTechnical Development Associates (P.) Ltd. Oct 2005 - May 2006Kathmandu, NepalJamuni Headworks Projects of Narayani Irrigation System of Bara District for Narayani Irrigation Project of Department of Irrigation. Activities Performed: Preparation of topographical maps and structural drawings, quantity estimate, rate analysis and cost estimate of various irrigation structures like headworks, slab culverts, drainage underpass, outfall etc. Client: Narayani Irrigation Project.
-
Civil Engineer Cum Autocad ExpertSilt Consultants (P.) Ltd. Jun 2005 - Oct 2005Kathmandu, NepalPreparation of standard drawings of superstructure of road bridges of various spans of Steel Truss Bridge, Prestressed Concrete Bridge and Arch Bridge for Bridge Unit of Department of Roads. Activities Performed: Preparation of standard drawings of superstructure of road bridges of various spans of Steel Truss Bridge, Prestressed Concrete Bridge and Arch Bridge Client: Department of Roads.
-
Cad Expert Cum Civil EngineerSilt Consultants (P.) Ltd. Jan 2005 - May 2005Lamahi, Dang, NepalPraganna Kulo Irrigation Project funded by Kuwaiti Fund for Arab Economic Development (KFAED). Activities Performed: Preparation of Construction Drawings of various irrigation structures like head regulator / cross regulator, aqueduct, pipe outlet, pipe culvert, foot bridge, slab culvert, super passage, box culvert, proportional divider etc. Client: Praganna Kulo Irrigation Project, Department of Irrigation.
-
Civil EngineerEnvironmental And Social Studies Department, Nepal Electricity Authority Oct 2001 - Dec 2003KathmanduIEE Study of Rural Electrification of Bara and Dhanusha Districts for Rural Electrification and Distribution System Reinforcement Project (REDSRP). Activities Performed: Assisted the team in preparation of Initial Environmental Examination Report by providing input of physical environment. Client: Rural Electrification and Distribution System Reinforcement Project. Field study for the preparation of Environmental Impact Assessment (EIA) report of Upper Tamakoshi Hydroelectric Project of Dolakha District. Activities Performed: Assisted the team in preparation of Environmental Impact Assessment (EIA) Report by providing input of physical environment. Client: Upper Tamakoshi Hydroelectric Project of Nepal Electricity Authority.Preparation of format and data entry in MS Access and analysis and preparing output table in MS Excel as required by sociologist for data entry of socio-economic questionnaire field survey for the Upper Tamakoshi Hydroelectric Project, Dolakha District (EIA Study).; Kali Gandaki "A" Hydroelectric Project, Syangja District (Environmental Audit); K-3 Substation Project, Kathmandu District (EIA Study). Activities Performed: Led the team for data entry, analysis and preparation of output tables as required by the sociologist. Client: Upper Tamakoshi Hydroelectric Project of Nepal Electricity Authority, Kali Gandaki “A” Hydroelectric Project and K-3 Substation Project. Preparation of Tender Document for the Construction of Goplingtar Lift Irrigation Project in Gorkha District Activities Performed: Conducted field survey for quantity estimate, prepared quantity estimate, rate analysis and cost estimate for the lift irrigation system, prepared tender documents for contracting the work and assisted the team in evaluation and award of the contract. Client: Marsyangdi Hydroelectric Project of Nepal Electricity Authority.
-
Civil Engineer Cum Autocad ExpertPyakurel And Associates Jun 2000 - Oct 2001Kathmandu, NepalDetailed Engineering Survey and preparation of topographical maps for Rural Electrification. Activities Performed: Preparation of topographical maps of scale 1:2,000 and 1:10,000 for the Rural Electrification work of Sunsari, Saptari, Siraha, Udaypur, Khotang, Morang, Ilam, Terhathum and Bhojpur Districts. Client: Rural Electrification and Distribution System Reinforcement Project, Nepal Electricity Authority.
-
Civil EngineerTechnical Development Associates (P.) Ltd. Nov 1997 - May 2000KathmanduDetailed feasibility study of Riu Bagahi (103 ha), Manahari Jyamire (80 ha), Amoa Khola (120 ha), Sukaura Phant (105 ha), Raja ko Bandh (700 ha), Thawa Khola (140 ha), Khuwa Khola (80 ha), Nibu Khola (50 ha) Irrigation Projects for Second Irrigation Sector Project (SISP) of Department of Irrigation.Detailed feasibility study of Singhe Ghat (3000 ha) Irrigation Projects for Department of Irrigation.Detail Engineering survey, design, drawing, detailed quantity estimate, rate analysis and cost estimate of Jiri – Solu Road (23 km, hill road) of Dolakha District. Detail Engineering survey, design, drawing, quantity estimate, rate analysis and cost estimate of Lumbini – Sishaniya Road (10 km) of Kapilvastu District. Detail Engineering survey, design, drawing, quantity estimate, rate analysis and cost estimate of Devdaha Link Road (7 km) of Rupandehi District. Detail Engineering survey, design, drawing, quantity estimate, rate analysis and cost estimate of Ramgram Link Road (7 km) of Rupandehi District. Detail Engineering survey, design, drawing, quantity estimate, rate analysis and cost estimate of Basdilawa – Padsara Road (7 km) of Kapilvastu District. Detail Engineering survey, design, drawing, quantity estimate, rate analysis and cost estimate of Thutepipal – Tikar Khataiya Road (8 km) of Kapilvastu District.
Mahesh Acharya Skills
Mahesh Acharya Education Details
-
Civil -
Martyrs Memorial
Frequently Asked Questions about Mahesh Acharya
What company does Mahesh Acharya work for?
Mahesh Acharya works for Eastconsult (P) Ltd.
What is Mahesh Acharya's role at the current company?
Mahesh Acharya's current role is Design Engineer at EastConsult (P) Ltd..
What is Mahesh Acharya's email address?
Mahesh Acharya's email address is sh****@****ail.com
What schools did Mahesh Acharya attend?
Mahesh Acharya attended Bangalore University, Martyrs Memorial.
What skills is Mahesh Acharya known for?
Mahesh Acharya has skills like Autocad, Civil Engineering, Highways, Earthworks, Water Supply, Bridge, Road, Water, Feasibility Studies, Geotechnical Engineering, Structural Engineering, Tunnels.
Not the Mahesh Acharya you were looking for?
-
-
Mahesh Acharya
Ilam -
-
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial