Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® Email and Phone Number
PMP® Certified (Project Management Professional) , PMI-RMP® Certified (PMI Risk Management Professional) and able to Management Construction Projects) With Very Good knowledge of civil engineering and performing according plan (Architectural, Structure, Mechanic & electrical). Site Managing with excellent understanding of Negotiating change orders. Managing information on changes in the work; Preparing an independent analysis, as required; obtaining and checking Estimates for the changes from subcontractor; obtaining approval of The architect and owner.Developing reports such as General Conditions Items, labor, safety, Change order logs and quality control. and resolving any conflicts. Overseeing and making decisions related to contract drawings and Subcontract information, and specifications Properly relate to the estimate, Scheduling the Project Activities and managing subcontractor trade coordination Meetings, Preconstruction meetings and submittal review meetings.Able to Estimate the project Time, Managing the project budget Estimate the project Cost, Managing submittals and shop drawings. Assessing conformance to Contract specifications, resolving any conflicts in interpretation.Having Software Experience related to Constructions Project Management such as Primavera 6 (P6), Pert master (V8) Primavera Risk Analysis, Mind View Programs and Easy Plan Programs. Ensuring that all drawings Acting as liaison with architects, subcontractors, consultants, Suppliers, inspectors, other Turner job staff and owner’s representatives In resolving issues related to plans and specifications.Overseeing the close-out process. Preparing final records for the project Such as-built, Operation and maintenance manuals, attic stock, and Spare parts, and evaluating information to ensure compliance with contract documents.
-
General Projects ManagerAkm Saudi ArabiaRiyadh, Sa -
Deputy General Manager ProjectAkm Oct 2022 - PresentRiyadh, Saudi Arabia• (The Project of developing Forensic Sciences Lab and Project of developing of first floor of B11 and B44 @ Riyadh, Saudi Aribia, 1200 m2 /Floor, 25 million SAR / 2 floor) • (The Project of Installing clean rooms for a blood bank at the King Abdullah International Medical Research Center @ Riyadh, Saudi Aribia ,130m2 ,4.5 million SAR)• (The project of establishing and equipping a stem cell and marrow transplant laboratory in King Abdullah Medical City @ Makkah, Saudi Aribia, 100 m2 , 2.7million SAR )
-
Project ManagerThe Arab Contractors Dec 2020 - PresentTanta, Al Gharbiyah, EgyptThe project of developing and establishing the new factories of Misr spinning and weaving company in El-MahallaDEVELOPMENT OF El-MEHALLA SPINNING FACTORY (6) ( 18000m2 - 220 million LE )Project definition 1-The existing spinning Factory No. (6) is being developed within the borders of Misr El-Mahalla company 2-The approximate area of the existing building is 18000 M2 3-The structural System of the building is concrete 4-the factory is a ground role for the production area With Service Buildings and a mezzanine role for electromechanical services.5-The number of new A/C stations is Six Units with different dimensions and heights -
Project ManagerThe Arab Contractors Jul 2018 - Dec 2020Tanta, Al Gharbiyah, EgyptConstruction of a fence to secure stations and workshops of National Railways Authority of Egypt in Central, East and West Delta areas with a length of 39 km and lines up a fence with a length of 8 km and the closure of openings with a length of 1 km( 157 million LE) -
Senior Site EngineerThe Arab Contractors Dec 2017 - Jul 2018El Zaqaziq, Sharjah, EgyptRepairing 1st stage Zagazige treated wastewater sta4on (80 m3/day, 50 million) -
Senior Site EngineerThe Arab Contractors Dec 2016 - Dec 2017El Zaqaziq, Sharjah, Egypt2nd stage Zagazige treated wastewater sta4on (172 m3/day - 360 million LE) -
Site Civil EngineerThe Arab Contractors Sep 2015 - Dec 2016Hihya, Sharjah, EgyptHihya Siloes (12 Silo - 60000 Tone - 120 million LE) -
Site Civil EngineerThe Arab Contractors Jul 2014 - Sep 2015Fakous, Sharjah, Egypt3rd stage Fakous treated water sta4on (2400 Litre/Second - 250 million LE) -
Junior Civil EngineerMustafa Khalifa Constructions Oct 2012 - Jul 2014Tanta, Al Gharbiyah, EgyptPlanner (during study as apprentice)Road structure : ( 18 km / Pavement ,3 /Bridge , 11/ Walking Tunnel , 6/Culvert and 250 million LE/ total cost )
Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® Education Details
-
Excellent With G.P.A : 3.81 -
Project Management InstituteAbove Target -
Above Target -
Excellent
Frequently Asked Questions about Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp®
What company does Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® work for?
Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® works for Akm Saudi Arabia
What is Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp®'s role at the current company?
Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp®'s current role is General Projects Manager.
What schools did Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® attend?
Mahmoud Sadaka , Mba , Pmp® , Pmi-Rmp® attended Arab Academy For Science, Technology And Maritime Transport, Project Management Institute, Project Management Institute, Tanta University.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial