AeroLeads people directory · profile

Mahmoud Sayed Email & Phone Number

Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP at Siemens Riyadh Metro Project
Location: Riyadh, Saudi Arabia 13 work roles 3 schools
LinkedIn matched
✓ Verified Jul 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP
Location
Riyadh, Saudi Arabia
Company size

Who is Mahmoud Sayed? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Mahmoud Sayed is listed as Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP at Siemens Riyadh Metro Project, a with 721 employees, based in Riyadh, Saudi Arabia. AeroLeads shows a matched LinkedIn profile for Mahmoud Sayed.

Mahmoud Sayed previously worked as Senior System Engineering at Siemens Ag and Station Handover Manager at Siemens Riyadh Metro Project. Mahmoud Sayed holds Bsc, Architecture from Helwan University Cairo.

Company email context

Email format at Siemens Riyadh Metro Project

This section adds company-level context without repeating Mahmoud Sayed's masked contact details.

Siemens Riyadh Metro Project

Review company-level records connected to Mahmoud Sayed before choosing the right outreach path.

Profile bio

About Mahmoud Sayed

Mahmoud Sayed is a Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP at Siemens Riyadh Metro Project. They is proficient in English and German. Colleagues describe them as "I Found Mahmoud hassan, a real professional, hard worker, honest and caring person. regard AGHA SAJID" and "Dear Mahmoud, Mahmoud was a very productive person,support his team, well oriented manager,I enjoyed working with him on the various projects we took on.""

Current workplace

Mahmoud Sayed's current company

Company context helps verify the profile and gives searchers a useful next step.

Siemens  Riyadh Metro Project
Siemens Riyadh Metro Project
Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP
saudi arabia
Website
Employees
721
AeroLeads page
13 roles · 27 years

Mahmoud Sayed work experience

A career timeline built from the work history available for this profile.

Senior System Engineering

Current
Siemens Ag

Riyadh, Saudi Arabia

Jul 2016 - Present

Station Handover Manager

Current

Al-Riyadh Governorate, Saudi Arabia

civil work JV interface Civil work integration design coordination'sSiemens LOTS coordination'sCivil & Electro mechanical (signaling , Rail, PSD , SIM&OCC ,Rolling stock )

Jul 2016 - Present

Station Access Manager

Current

Riyadh, Saudi Arabia

Jul 2016 - Present

Cme Project Manager - Implemetaion Manager

Riyadh-Ksa

 Assigned responsibility of all engineering documents, recourse plan for the projects and evaluation of the consultants and contractors progress. Involved in the follow up of the projects activity and supporting from engineering point of view for all the running projects.  Reviewing sites surveys report and approval (TSSR) Putting sites solutions and review sites configuration Contractor managements  Survey responsible team and approval and check list  Responsible to develop Sourcing Business Plan before SDP 2 & during SDP 0 & 1 and working closely within PA NRO Teaming Tendering phase. Key person for the follow up with CW & RF & TCC team and arranging for the documents need to start the rollout with the approvals process.  Assigned responsibility of putting the SOW for the contractors as per the executing plans within the time and budget approved and the follow up of STC work documents system (SOW, SOC, MOP’s, NE, NETFS) Follow up with OSP project south area rollout as per STC standard  Arranging all documents needed for pat’s and scope closing and evaluating the consultants and contractors work. Responsible for the engineering in STC wireless project 852 sites + 425 sites LTE1800+400 LTE2300 swap for the

Jul 2014 - Jul 2016

Engineering Construction Manager

Counluting Office (Dewan )

Riyadh -Ksa

 Assigned responsibility of all engineering documents, recourse plan for the projects and evaluation of the consultants and contractors progress. Approving materials with costumer specs and costumer process  Involved in the follow up of the projects activity and supporting from engineering activity running in the projects.  Team lead managements & resources plan  Reviewing sites surveys report and approval  Putting sites solutions and review sites configuration Contractor managements  Survey responsible team and approval and check list  Contractors managements and time plan regular meeting to follow project time plan & milestones  Responsible to develop Sourcing Business Plan before SDP 2 & during SDP 0 & 1 and working closely within PA NRO Teaming Tendering phase. Key person for the follow up with construction and arranging for the documents need to start the construction with the approvals process.  Assigned responsibility of putting the SOW for the contractors as per the executing plans within the time and budget approved and the follow up of costumer work documents. Arranging all documents needed for pat’s and scope closing and evaluating the consultants and contractors work. Follow on construction drawings, schedules and specifications plus tender documentation Supporting the installation problems in electro mechanical

Jan 2014 - Jun 2014

Engineering Manager

Etisalat - Abu Dhabi-Uae

Abu Dhabi

 Assigned responsibility of all engineering documents, recourse plan for the projects and evaluation of the consultants and contractors progress. Involved in the follow up of the projects activity and supporting from engineering point of view for all the running projects.  Reviewing sites surveys report and approval (TSSR) Putting sites solutions and review sites configuration Contractor managements  Survey responsible team and approval and check list  Responsible to develop Sourcing Business Plan before SDP 2 & during SDP 0 & 1 and working closely within PA NRO Teaming Tendering phase. Key person for the follow up with CW & RF & TCC team and arranging for the documents need to start the rollout with the approvals process.  Assigned responsibility of putting the SOW for the contractors as per the executing plans within the time and budget approved and the follow up of STC work documents system (SOW, SOC, MOP’s, NE, NETFS) Arranging all documents needed for pat’s and scope closing and evaluating the consultants and contractors work. Responsible for the engineering in STC wireless project 852 sites + 425 sites LTE1800+400 LTE2300 swap for the 2G/3G and checking tower calculation and approving towers safety on approved codas.  Follow on construction drawings, schedules and specifications plus tender documentation Development the STC site for the clean power (solar power) Deployment for the new power solution especially for fare sites in the remote areas  OSP implementation project support  Supporting the installation problems

Jul 2013 - Dec 2013

Engineering Manager

Riaydh

 Assigned responsibility of all engineering documents, recourse plan for the projects and evaluation of the consultants and contractors progress. Involved in the follow up of the projects activity and supporting from engineering point of view for all the running projects.  Responsible to develop Sourcing Business Plan before SDP 2 & during SDP 0 & 1 and working closely within PA NRO Teaming Tendering phase. Key person for the follow up with CW & RF & TCC team and arranging for the documents need to start the rollout with the approvals process.  Assigned responsibility of putting the SOW for the contractors as per the executing plans within the time and budget approved and the follow up of STC work documents system (SOW, SOC, MOP’s, NE, NETFS) Arranging all documents needed for pat’s and scope closing and evaluating the consultants and contractors work. Responsible for the engineering in STC wireless project 852 sites + 425 sites LTE1800+400 LTE2300 swap for the 2G/3G and checking tower calculation and approving towers safety on approved codas.

Dec 2012 - Jun 2013

Technical Facility Specialist

Riyadh

• Responsible of keep update zain-KSA specs to cover the GSM solutions. • Share of ZAIN blue print specs of all zain Group • Review all materials (towers-shelters- fences) for approval that is as per zain specs• Responsible of the passive area in all cores of the KSA• Monitor vendor & contractors performance through the relevant project managers to ensure compliance with all contractual terms and conditions Attend to the tendering process including Request for Proposals, Request for Quotes and oversee evaluation of tender submissions• Follow closely with legal, and finance departments in arriving at contracts which further business objectives and protect the Company from a financial and commercial perspective. • Follow up the data centers with O&M of zain KSA • Monitor prospective changes to regulations and ensure compliance with contract's SLAs &Monitor vendor performance through the relevant project managers to ensure compliance with all contractual terms and conditions • Provide on-going management and maintenance of vendor contracts• Ensure timely renewal/ replacement of contracts• Carry out contract management activities once a contract has been approved, including monitoring progress, recommending escalations and/or amendments• Ensure timely renewal/ replacement of contracts after doing the evaluations • Tanning responsible developer for technical team by arranging with vendors & training centers • Support procurement by providing CW Models Costs• Handling Subcontractor manager Activities for all existing Services Providers• Doing Regular Assessment for Contractors Performance on site• Generating Analysis Report regarding Service Providers Performance according to their Capacity• Leading Switch over from Technical Assistance to Services via providing Cost of Services• Supporting Standard RFQ developing with all its Sourcing Business Models

Nov 2011 - Nov 2012

Implementation Project Manager

Damam

• Has overall responsibility over the timely roll out of sites in the region as per Zain specs • Manage and administer regional staff as needed and make sure that all available resources are appropriately used to achieve Zain objectives• Supporting acquisition team to finalizes sites and solve problems • Report periodically to the Regional Manager (RM) on status of deployment, progress, issues, roadblocks...and perform RM responsibilities whenever delegated by the RM.• Following the SCECO status Zain accounts and sure to be updated • Identify any lack of resources impacting the progress of the project and recommend solutions to the RM.• Support all field staff including Zain ksa 3-rd party and Motorola staff.• Make sure that Zain ksa’s standards and KPIs are fully achieved.• Supervise all aspects of works performed by Motorola in the eastern province and provide field instructions as needed.• Perform regular auditing of sites to include quality of installation, marking, BOQ, acceptance testing, accuracy of documentation.• Coordinate implement solutions in conjunction with the regional technical staff on issues such as RF, transmission, optimization and acceptance issues.• Coordinate and implement the plans for the new Technological of data like (I-HSPA & LTE-HSPA+ )

Feb 2009 - Nov 2011

Line Manager

Scope of work managing the resources for construction and implementation and acquisition and the subcontractors to achieving the targets during the time plan Follow up projects resources problems• Budget for local transportation • put the budget for the resources • put the training plans • put the IPM for all the resources and the targets and objective• follow up with resources managers the status of the resources in the function roll • making the appraisal for employee • put the training plans to develop the resources

Nov 2006 - Feb 2009

Civil

telecom part in metro cairo egypt

2000 - 2004 ~4 yrs
Team & coworkers

Colleagues at Siemens Riyadh Metro Project

Other employees you can reach at bacsrmp.com. View company contacts for 721 employees →

3 education records

Mahmoud Sayed education

Bsc, Architecture

Activities and Societies: urban plan & construction AREAS OF EXPERTISE •Vision, Mission & Strategic Planning • Project Planning &.

Project Management, Project Management, 3

Pmp

Activities and Societies: PMI PMI project managements

FAQ

Frequently asked questions about Mahmoud Sayed

Quick answers generated from the profile data available on this page.

What company does Mahmoud Sayed work for?

Mahmoud Sayed works for Siemens Riyadh Metro Project.

What is Mahmoud Sayed's role at Siemens Riyadh Metro Project?

Mahmoud Sayed is listed as Senior System Engineering @ Siemens AG | PMI, PMP, PMI-ACP at Siemens Riyadh Metro Project.

Where is Mahmoud Sayed based?

Mahmoud Sayed is based in Riyadh, Saudi Arabia while working with Siemens Riyadh Metro Project.

What companies has Mahmoud Sayed worked for?

Mahmoud Sayed has worked for Siemens Ag, Siemens Riyadh Metro Project, Siemens, Huawei Technologies, and Counluting Office (Dewan ).

Who are Mahmoud Sayed's colleagues at Siemens Riyadh Metro Project?

Mahmoud Sayed's colleagues at Siemens Riyadh Metro Project include Ahmed Sumon, Shaik Peerulla, Mohammad Abdul Jaweed, Ferdinand Navia, and Ahmed Medhat.

How can I contact Mahmoud Sayed?

You can use AeroLeads to view verified contact signals for Mahmoud Sayed at Siemens Riyadh Metro Project, including work email, phone, and LinkedIn data when available.

What schools did Mahmoud Sayed attend?

Mahmoud Sayed holds Bsc, Architecture from Helwan University Cairo.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Mahmoud Sayed you were looking for.

View similar profiles