Over all experience in construction 33 years+ and Elevated Metro 10 Years+. Major Project successfully completed as mention below:1. Construction of (6.5 Km long) and five station building for Bangalore Metro Rail Corporation.2. Construction of Elevated Viaduct in reach 4.3 Km long or Bangalore Metro Rail Corporation.3. Construction of two level grade separator with improvement to junction on ORR at intersection of Mysore Bangalore Road.
Dilip Buildcon Ltd.
View- Website:
- dilipbuildcon.com
- Employees:
- 1924
-
Project HeadDilip Buildcon Ltd. Nov 2019 - PresentMadhya Pradesh, IndiaProject: The Design And Construction Of Elevated Viaduct Of Length 5.290 Kms From Chainage 25+565 To 31+755, Between ISBT/MR10 Flyover And Mumtaj Bag Colony (Excluding Stations) For Indore Metro Rail Project Phase-1, Line 2A.Responsibility: Contact Control entire project encompassing, quality, effective performance, Safety, Health and Environmental aspects of project execution, Planning of construction program for timely completion, Design drawings progress review with DDCs and GC counter parts, Utility shifting works and contractual communications with Client/GC as Contractor’s Representative, attending review meetings with client. Take accountability for the effectiveness of the quality management system. Collate the shortcomings in existing work methods at sites and resolve. -
Deputy General ManagerNcc Limited Mar 2008 - Aug 2019IndiaProject Details:1. Bangalore Metro Rail Corporation-R4b.2. Bangalore Metro Rail Corporation- Design and Construction of Elevated Viaduct in Reach- 4, 3.61 KM Excluding Station.3. Construction of Two level Grade separator with Improvements to Junction at the intersection of ORR and Bangalore– Mysore road at Nayandahalli, Bangalore. Construction of fly over and under pass at Kalyannagar, Verannapalya and Hennur.Responsibility: Contact Control entire project encompassing, quality, effective performance, Safety, Health and Environmental aspects of project execution, Planning of construction program for timely completion, Design drawings progress review with DDCs and GC counter parts, Utility shifting works and contractual communications with GC/Client as DGM, attending review meetings with client. Take accountability for the effectiveness of the quality management system. Collate the shortcomings in existing work methods at sites and resolve. Pier arm at concourse, Track and platform level of Station Buildings, Deck slab at concourse, Track and platform level of station buildings. Structural steel roofing and Sheeting works of Station buildings. Segment Launching, Gluing, stressing, span alignment and Bearing fixing works. Erection and Dismantling of Launching Gantry (Four box erection at a time for first span) Execution of Composite bridge for 53 mtr span at a height of 30 mtr from existing Road level. RE wall approach works, Expansion joints, Pot PTFE bearings. -
Senior Project ManagerM/S Suryodaya Infrastructures Jan 2005 - Jan 2008IndiaProject Details:1. Construction of PSC Railway over Bridge at Tumkur at LC 40-41 consisting of 24 nos. 20 mtr spans of PSC I girders, 4 spans 40 mtr obligatory spans and approaches 400 mtr.2. Construction RCC Railway over bridge consisting of 6 spans of 25 mtr NHAI ( Lanco) at Kunigal.3. Construction of Bangalore – Magadi – Huliyur state highway 40 km including all Minor bridges and structures.4. Expansion of Magadi road till Nice Corridor for BBMP BangaloreResponsibility: Identify construction and maintenance costs on materials, equipment and labor. Create, review and manage project schedules to identify progress, lead times and project sequences. Allocate the resource for activities as per the schedule Contact with the employer on matters relating to the project. Casting and Prestressing of I Girders. Erection of I Girders Construction of approaches using RE panels in embankment. Parapet walls, POT – PTFE bearings and Expansion joints Approach Road works Mobilization of all resources required Client coordination with Infrastructure development Department. Client and subcontractor billing works
-
Project ManagerM/S Semac Pvt. Ltd Aug 2001 - Sep 2004IndiaProject Details: Construction of TVS breaks division at Chennai in collaboration with WABCOS Germany. Executed Main Production Block, utilityBuilding panel room, Generator room, Canteen building, Kit unit, Structural steel works, HVAC works and Firefighting works.Responsibility: Monitor the progress & the cycle times for different activities of work – highlight variances. Ensure completion of activities to meet the project time schedules. PMC group head Planning of civil, Mechanical, Electrical and HVAC works. Coordination between different agencies involved and client Client and subcontractor billing works Coordination with Semac Design wing for required drawings and details.
-
Project EngineerM/S. Parijat Constructions Dec 1984 - Aug 2000Maharashtra, IndiaProject Details: Building Construction ProjectFor Telecom and Kirloskar brothers.Responsibility: Execution of building works. Prepare work specifications Plan and control manpower ,equipment and materials according to Construction schedule. Control activities and manpower required on time. Arranging required resources.
Manjunath Sv Education Details
Frequently Asked Questions about Manjunath Sv
What company does Manjunath Sv work for?
Manjunath Sv works for Dilip Buildcon Ltd.
What is Manjunath Sv's role at the current company?
Manjunath Sv's current role is Project Head.
What schools did Manjunath Sv attend?
Manjunath Sv attended Walchand College Of Engineering(A Govt. Aided Autonomous Institute),sangli-M.s, The National Institute Of Engineering, Mysore.
Who are Manjunath Sv's colleagues?
Manjunath Sv's colleagues are Gaurav Bajpai, Suraj Das, Sunil Kumar, Jayprakash Pal, G. R. Somanath Revankar, Achintya Jana, Khemchand Ahirwar.
Not the Manjunath Sv you were looking for?
-
1orbenergy.com
-
1dell.com
-
2igate.com, gmail.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial