Manager Nw Planning And Optimization
Current• LTE Design E2E for 14 markets achieving expecting KPI, all 14 markets got acknowledged by Sprint. Started with Initial design build baseline with Preliminary Design, optimize design with capesso/manual and then submitted final design. • CDMA and LTE Post processing analysis and provide optimization recommendations for Sprint network.• LTE ATP/SSV report creation and provide optimization recommendations.• LTE parameter audit for NE region, LTE Tracking area code audit for DC,LTE 2500 MHz RET malformed analysis, Best in class end to end data compilation/analysis using NCV for BAWA and Norfolk markets, daily tracker of BAWA High ECSFB blocking cells.• High runner’s analysis CDMA, EVDO and provide recommendations to improve retain-ability and accessibility.• Public Safety Mobile Broadband (PSMB) link budget computation for 850 & 450Mhz bands & RF planning and design optimization for New South Wales (NSW) Australia.• Completed PSMB radio network planning with agreed set of parameters to meet specified performance criteria defined in the requirements specification. The radio network plan submitted with minimum plots for coverage (signal strength and quality) and performance (throughput). • RNP 3G ETISALAT NIGERIA, Neighbor and primary scrambling code plan.• Worked on RFDS and CD verification, preparing RF analysis package for fallout sites.• Training team members on Mentum plannet tool with planning concepts. • Worked on IBS design AT&T US and IBS optimization for ABU DHABI Etisalath.• Active participant in RFP, Effort estimation preparation for 2G, 3G & LTE.