Senior Engineer
CurrentProject: NLEX Project Extension Segment 10.1 – 5.7 Km Horizontal Project (Road extension for the existing NLEX)Duration: March 2015 to PresentPosition: Senior Engineer for Temporary Steel Bridge and Beam Launching Works- Assigned to Beam Launcher Team and Temporary Steel Bridge- Supervises the movement and transferring of the beam launcher to the next.