Marco Andrini
AeroLeads people directory · profile

Marco Andrini Email & Phone Number

Head of Project Control, Organization and ICT Departments at KCOI LLP at KCOI LLP
Location: Aktau, Mangystau Region, Kazakhstan 10 work roles 2 schools
1 work email found @kcoi.kz 1 phone found area 338 LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email · 1 phone

Work email m****@kcoi.kz
Direct phone (338) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Head of Project Control, Organization and ICT Departments at KCOI LLP
Location
Aktau, Mangystau Region, Kazakhstan
Company size

Who is Marco Andrini? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Marco Andrini is listed as Head of Project Control, Organization and ICT Departments at KCOI LLP at KCOI LLP, a with 687 employees, based in Aktau, Mangystau Region, Kazakhstan. AeroLeads shows a work email signal at kcoi.kz, phone signal with area code 338, and a matched LinkedIn profile for Marco Andrini.

Marco Andrini previously worked as Head of Project Control, Organization & ICT Departments at KCOI LLP at Kcoi Llp and Project Manager at Kcoi Llp. Marco Andrini holds Bachelor'S Degree, Management from Russian State University For The Humanities.

Company email context

Email format at KCOI LLP

This section adds company-level context without repeating Marco Andrini's masked contact details.

{first}.{last}@kcoi.kz
89% confidence

AeroLeads found 1 current-domain work email signal for Marco Andrini. Compare company email patterns before reaching out.

Profile bio

About Marco Andrini

Skilled, Professional and Experienced in the Oil and Gas Industry with a good knowledge of Project Management, planning and scheduling, progress monitoring and cost control, change order management (MOC), R&O, Organization and ICT.I grew my professional experience working over 19+ years in the Oil and Gas Industry for main EPC Contractors in Project Management and Control.Extremely versatile and adaptable to new challenges, my strengths can be summarized as follow:• strong ability to make critical decisions under pressure and solve strategic issues related to jobs of relevant technical importance;• effective and efficient with deadlines and schedules;• promptly responsive and capable of focusing on the right priority if overloaded;• enthusiastic team-leader. • determined on achieving given targets.I am highly determined and I acquired a professional level of English getting in touch with new cultures, having experience in different international working environments and people of different countries.

Listed skills include Epc, Primavera P6, Project Control, Project Management, and 33 others.

Current workplace

Marco Andrini's current company

Company context helps verify the profile and gives searchers a useful next step.

KCOI LLP
Kcoi Llp
Head of Project Control, Organization and ICT Departments at KCOI LLP
Aktau, Mangystau Region, KZ
Website
Employees
687
AeroLeads page
10 roles

Marco Andrini work experience

A career timeline built from the work history available for this profile.

Head Of Project Control, Organization And Ict Departments At Kcoi Llp

Aktau, Mangystau Region, Kz

Head Of Project Control, Organization & Ict Departments At Kcoi Llp

Current

Aktau - Kazakhstan

Head of Project Control Department at KCOI LLP (Rosetti Marino Group) at “Temir at” Yard – Kazakhstan (Aktau): Lead and motivate a team of 35+ engineers, managing Costs, Revenues, Time & Schedules, Quantities, Contracts and Risks, submitting periodic (monthly and quarterly) reporting detailing budget, costs, estimate at completion analysis, revenues and claims analysis, schedules, progress and forecasts (Progress Measurement System), earned value analysis.Conducting meetings with management and clients addressing current project status including engineering, procurement, construction, commissioning and logistic.Working closely with corporate top management and specialists as required in the development and implementation of corporate procedures, change management and continuing appraisal and improvement of the project controls elements and tools (SAP / PRIMAVERA P6 / Microsoft Office, 1C) to ensure adequacy and efficiency.Head of Organization & ICT Departments at KCOI LLP (Rosetti Marino Group) at “Temir at” Yard – Kazakhstan (Aktau): Lead and motivate a team of 8 engineers, managing IT Support (Desktop, Help Desk and Telecommunication), Upgrade of Equipment and Infrastructures assets management, IT Inventory, Application Support (SAP, 1C, etc…), Corporate standards, procedures and policy, System, Information and Data Security, Optimization of Company Storage System, Hardware and Software, Turnstiles & Access Control System and related interface with Payroll and QMS system. Implementation of Corporate Intranet and Improvement of Cybersecurity aspects. Developing Corporate AOP and Change Management procedure.

Dec 2018 - Present

Project Manager

Aktau, Mangghystaū, Kazakhstan

Project Manager at KCOI LLP (Rosetti Marino Group) at “Temir at” Yard – Kazakhstan (Aktau): Responsible for the successful delivery of assigned project on time and on budget, meeting client expectations and satisfaction in terms of Safety and Quality.Responsible for monitoring and control, monthly project reviews, financial and labor forecasting.Create a positive and winning culture, through effective Teamwork, by establishing trust and credibility at all levels.Ensure that all project deliverables are produced, maintained, made available to all parties concerned and effectively used.Managing the process of change (MOC), including estimating and negotiations of contract variations .Establish and execute detailed plans to ensure that risks are mitigated and opportunities are realized (R&O).Successfully Completed Project:• Procurement of n.3 Temporary Refuge, stand-alone secure environmentally controlled enclosure.It is designed for installation in Hazardous area with associated risk of flame exposure, jet fire and explosion (blast rate of 0.3 Barg for 200 msec, i.e. A60, H120, J45). The TR allow safe conditions for people (100 Pax each) during emergency situations in operating areas in case of release of toxic gases (H2S). The TR will provide two (2) hours survivability, and is composed of two shelters where 1 it is dedicated to accommodate the personal during emergency situation, including AIRLOCKs and Control Room, while the 2nd it is accommodating all equipment as Compressors, Air storage bottles and filtration unit. The environmental conditions inside T.R. are constantly monitored to avoid the presence of contaminated air through HVAC & Ventilation system.The certificate of origin of the goods (CT-KZ) issued by the territorial divisions of the National Chamber of Entrepreneurs of the RoK. (Client: NCOC (North Caspian Operating Company N.V) – Destination: Kashagan Offshore/Onshore Process facilities, Kazakhstan).

Feb 2020 - Dec 2022

Head Of Project Service Department & Project Control Manager

Aktau

In charge of the activities related to time and costs, revenues, planning, engineering, procurement, analysis of the budget variance in order to indicate the areas of intervention, Work Schedule (Primavera P6), work progress (Progress Measurement System), change management, for the following projects:• Fabrication, E&I Fit‐Out, Supply, and delivery on a Free Carrier “FCA’’ (INCOTERMS 2010) basis for the five (5) MWP‐Injection RIEs (Multi Well Pad Injection Remote Instrument Enclosure) and Free on Board “FOB” (INCOTERMS 2010) for the four (4) LSA (Large Standalone Remote Instrument Enclosure LSA):(Client: TCO LLP (TENGIZCHEVROIL), Company: PSNKazStroy JSC – Destination: TENGIZ Field , western Kazakhstan).• Provision of Engineering, Procurement, Fabrication and Installation (EPFI) works for Well Conversion:(Client: NCOC (North Caspian Operating Company N.V) – Destination: Kashagan D-Island Complex , Kazakhstan).• Procurement, Fabrication, Load Out & Transportation of Topside for EP Cluster 4 (EPC4):(Client: NCOC (North Caspian Operating Company N.V) – Destination: Kashagan Island Complex , Kazakhstan).• TCO FGP/WPMP (Future Growth Project – Wellhead Pressure Management Project), Fabrication of n. 17 PARs (Pre-Assembled Pipe Racks) – about 5500 tons:(Company: TCO LLP (TENGIZCHEVROIL), Contractor: ERSAI LLP (SAIPEM) – Destination: Tengiz field, western Kazakhstan.• Early Works, Site Preparation, Load-in, Installation, Hook-up, Mechanical Completion, Pre-commissioning and Commissioning of Topsides for EP Cluster 3 & 4: Engineering, Procurement, Construction (Fabrication and Installation), Commissioning:(Contractor J.V.: Enka Insaat ve Sanayi A.S. & JS Company “MontazhSpetsStroy” Client: NCOC (North Caspian Operating Company N.V) – Destination: Karabatan Onshore Process Facilities, Kazakhstan).

Apr 2017 - Dec 2018

Head Of Project Service Department & Project Control Manager

Kazakhstan

In charge of the activities related to time and costs planning, engineering, procurement plan, making analysis of the budget variance in order to indicate the areas of intervention, Work Schedule (Primavera P6), work progress (Progress Measurement System) claim analysis, for the following projects:• Pig Launcher Traps Modification: Engineering, Procurement, Construction (Fabrication and Installation), Commissioning:(Client: NCOC (North Caspian Operating Company N.V) – Destination: Kashagan Riser Island Complex D, Kazakhstan).• Pig Receiver Traps Modification: Engineering, Procurement, Construction (Fabrication and Installation), Commissioning:(Client: NCOC (North Caspian Operating Company N.V) – Destination: Karabatan Onshore Process Facilities, Kazakhstan).• PSNK Frame Agreement: Provision of Services of Fabrication and Site Installation of Structural and Piping frameworks:(Contractor: PSNK (PSN Kazstroy JSC); Client: NCOC (North Caspian Operating Company N.V) – Destination: Karabatan Onshore Process Facilities, Offshore Riser Island-D; Kazakhstan).• L-Line: well hook-up installation works at 21 Production Wellsand 1 Pig Launcher facility: (Client: Maersk Oil Kazakhstan – Destination: Dunga Field - Kazakhstan).• Double Basket Strainer Unit: Fabrication Skids Well Clean-up:(Client: Maersk Oil Kazakhstan – Destination: Dunga Field - Kazakhstan).• Piping Welding Service for EPC 2&3 : Piping Fabrication and Erection:(Client: ERSAI LLP (SAIPEM) – Destination: Kashagan Riser Island Complex D, Kazakhstan).

Jul 2014 - Apr 2017

Senior Planning Engineer / Project Controller

Ravenna Area, Italy

Project Senior Planner (@Piomboni Yard) and Offshore Campaign Senior Planner (@ North Sea) for WEST FRANKLIN EPCI PROJECT (West Franklin & Elgin B (+Bridge) Top Sides): Engineering, Procurement, Supply, Construction, Transportation, Installation, Commissioning and assistance in the start-up and the Performance Test of the Plant: in charge of the activities related to time and costs planning, engineering, procurement plan (in SAP), making analysis of the budget variance in order to indicate the areas of intervention, Work Schedule (Primavera P6), work progress, monitoring of Precommissioning (RFC) and Commissioning (RFSU) using ICAPS DB, issuing reports (Weekly and Monthly).During the Offshore Campaign in charge of all the Planning activities relevant to the Transportation, Installation, Hook-Up (monitoring by Job Card), Pre-Commissioning, Commissioning, assistance in the start-up and Performance Test of the Plant.Client: TOTAL ELF UK – Destination: North Sea

Aug 2011 - Jul 2014

Project Controller

Ravenna Area, Italy

Project Control Manager at Business Unit Process Plants, in charge of the activities related to time and costs planning, subcontracts, engineering, procurement plan, making analysis of the budget variance in order to indicate the areas of intervention, Work Schedule (Primavera P3/P6), work progress, issuing reports for the company top management and for the Client: • EPC Gassi Touil Gas Processing Facilities Pj: LP & HP SLUG CATCHERS (Client: JGC Coorporation – Destination: Algeria)• EPC Colonne Frazionamento C-2310/2320 Stab. P.E. RA: (Client: TECNIMONT SPA – Destination: Polimeri Europa (RA))• EPC Amer 8: Chemical Injection Package: (Client: ENNPI – Destination: Egypt)• EP RASHPETCO: Condensate Separator Skid: (Client: PETROJET – Destination: Egypt)

Jul 2010 - Jul 2011

Planning Engineer & I&Ct Support

Astrakhan Region, Russian Federation

Project Planner, in charge of the activities related to work progress, preparation of work packages, schedule (P3), manpower analisys, sub-contractor (Time sheet), engineering, procurement plan, ITC supporting activities, site instruction request, monitoring of shipment operations as to racks-related materials (carry over works) at Krasnye Barrikady Yard at Astrakhan (Russian Federation) on the following project:• EPC Kashagan Development Experimental Program – Procurement and fabrication of Ancillary steelwork, piperacks (n°7 racks of about 5600 tons) and transportation barge (n°2 barges of about 2550 tons) (Client: KEPPEL Kazakhstan; Company: AgipKCO)

Jan 2006 - Jun 2010

Junior Planning Engineer

Ravenna Area, Italy

Project Planner, employed in project report, engineering/procurement/construction progress monitoring, at Piomboni Yard for the following project:• EPC Fabrication of Katarina Platform, jacket, module and living quarter, (Client: Inagip doo – Destination: Croatia)

Oct 2005 - Jan 2006

Material Controller / Site Hr Office

Bonciani S.P.A. (Gruppo Acmar)

Orvieto, Umbria, Italy

At first Manual Worker/Erection man, and then employed at HR office, material control, organization at the following yards:• Construction of High Speed Line - Section Firenze –Roma (Client: RFI)• “ Maintenance and renewal of central railway station of Bologna.”

May 2004 - Oct 2005
Team & coworkers

Colleagues at KCOI LLP

Other employees you can reach at kcoi.kz. View company contacts for 687 employees →

2 education records

Marco Andrini education

High School Diploma, Electronic And Telecommunications.

Itis "Nullo Baldini"
FAQ

Frequently asked questions about Marco Andrini

Quick answers generated from the profile data available on this page.

What company does Marco Andrini work for?

Marco Andrini works for KCOI LLP.

What is Marco Andrini's role at KCOI LLP?

Marco Andrini is listed as Head of Project Control, Organization and ICT Departments at KCOI LLP at KCOI LLP.

What is Marco Andrini's email address?

AeroLeads has found 1 work email signal at @kcoi.kz for Marco Andrini at KCOI LLP.

What is Marco Andrini's phone number?

AeroLeads has found 1 phone signal(s) with area code 338 for Marco Andrini at KCOI LLP.

Where is Marco Andrini based?

Marco Andrini is based in Aktau, Mangystau Region, Kazakhstan while working with KCOI LLP.

What companies has Marco Andrini worked for?

Marco Andrini has worked for Kcoi Llp, Rosetti Marino Group Of Companies, and Bonciani S.P.A. (Gruppo Acmar).

Who are Marco Andrini's colleagues at KCOI LLP?

Marco Andrini's colleagues at KCOI LLP include Yerlan Sunkarbekov, Gaukhar Sultanova, Нурлан Шаймарданов, Aslan Tumyshov, and Joseph R..

How can I contact Marco Andrini?

You can use AeroLeads to view verified contact signals for Marco Andrini at KCOI LLP, including work email, phone, and LinkedIn data when available.

What schools did Marco Andrini attend?

Marco Andrini holds Bachelor'S Degree, Management from Russian State University For The Humanities.

What skills is Marco Andrini known for?

Marco Andrini is listed with skills including Epc, Primavera P6, Project Control, Project Management, Sap, Project Planning, Ingegneria, and Controllo Progetti.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Marco Andrini you were looking for.

View similar profiles